• 제목/요약/키워드: GIS Substation

검색결과 86건 처리시간 0.032초

변전소 형태 및 설비규모의 결정 (Application Standards for Substation Types and Facility Scales)

  • 민병욱;신명식;방선웅;김영달
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.438-439
    • /
    • 2011
  • Substations in Korea are classified into an outdoor steel structure type, an outdoor GIS(Gas Insulated Switchgear) type, an indoor GIS type, an underground GIS type, and a complex GIS type. Before 1970, substations were built in outdoor steel structure types only. In 1980, an 154kV indoor GIS type substation was built for the first time in Pusan. And the first 345kV indoor GIS type substation, the first 765kV full GIS substation were built in 1984 and in 2002 each. In 1998, 154kV indoor type substations were standardized into regular type and urban type which applied steel frames to structures. In 2002, this was re-standardized into five different types in detail. In 2007, hub substations which had high capacity were built in the region of industrial zone and heavy load areas. And 154kV compact substation was developed and standardized by compacting an indoor GIS type substation in 2009. This paper would present a series of substation type transition and application standards for substation types and facility scales.

  • PDF

EMTP/RV를 이용한 22.9kV GIS 모델링과 과도회복전압 해석 (22.9kV GIS Modeling and Transient Recovery Voltage Analysis Using EMTP/RV)

  • 정태영;백영식;정기석;박지호;서규석
    • 전기학회논문지
    • /
    • 제59권7호
    • /
    • pp.1199-1205
    • /
    • 2010
  • The recent power system is required to a large size of facilities and high power technology according to increasing power demand. However, it could lead to spoiling the beauty of city and environment problem. The miniaturized facilities with large capacity such as GIS have been required in recent power system. The GIS(Gas Insulated Substation) using the SF6 insulation gas enables to miniaturize facilities with large capacity with high insulation performance. However, the substation installed GIS has required to new design model which is different from the conventional substation. The TRV(Transient Recovery Voltage) analysis on simple circuit may applied by differential equation. However, in case of relatively complicated system, EMTP(Electro Magnetic Transients Program) mainly has been used to design and simulate for transient analysis. This paper mainly design the 22.9 kV GIS system and analyze the transient recovery voltage of main circuit breaker using EMTP/RV. It also enables to easily design the other substation installed GIS with same maker and voltage level because the proposed GIS model consists of separated modules such as busbar, circuit breaker, bushing, CT, PT etc. Eventually, it contributes to comfortably compare the interrupting performance of circuit breaker and system TRV corresponding to the substation system configuration.

UHF법 부분방전 진단기법에 의한 가스절연 개폐장치의 성능검증 (Performance Verification of Gas Insulated Switchgear using UHF Partial Discharge Diagnosis Method)

  • 김정배;박경수;송원표;김덕수;김종화
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전기물성,응용부문
    • /
    • pp.37-39
    • /
    • 2002
  • UHF method is very effective to diagnosis for partial discharge of GIS. In generally, inner UHF sensor can be attached on sheath cover of GIS under construction for periodic inspection. However, there is no inner UHF sensor for GIS of the domestic substation. We used the outer UHF sensor attached on spacer for GIS of existing substation. In this paper, we report the diagnosis result of partial discharge on 800kV GIS in domestic substation. From these results, we can find the quantity, reason and location of PD and certificate the performance of UHF method for partial discharge diagnosis of GIS.

  • PDF

가스절연 개폐장치의 내부절연 성능검증을 위한 UHF 협대역 부분방전 진단법 (UHF Narrow Band Type Partial Discharge Diagnosis Method for the Internal Insulation Performance Verification of the Gas Insulated Switchgear)

  • 송원표;김정배;김민수;정재룡;박승재;고희석
    • 대한전기학회논문지:전기물성ㆍ응용부문C
    • /
    • 제54권9호
    • /
    • pp.414-420
    • /
    • 2005
  • A method for partial discharge diagnosis based on UHF narrow band type for GIS has been developed and calibrated. In generally, PD cannot be directly measured under on-line condition, but we can indirectly measure the electromagnetic wave made by PD using the high-frequency antenna. Compared with VHF band, electromagnetic waves of UHF band have a low influence for external noise in high-voltage substation. Therefore, we can detect the real abnormality with several pC in GIS using UHF narrow-band type method. For the case of no internal VHF sensor for GIS of the domestic substation, it has applied to use the external UHF sensor attached in spacer in GIS of existing substation. In this paper, we firstly described the technique of partial discharge measurement using frequency analysis and phase analysis in UHF band. Secondly, we presented the results of sensitivity test, the relationship of dBm-pC and diagnosis result of the cause of PD source by phase analysis. And then, we report the diagnosis result of partial discharge on the real GIS in domestic substation. These results make above method applicable for measurement of quantity and cause of PD for real operation GIS in high-voltage substation.

154kV 콤팩트 변전소 표준모델 개발 및 실증 (Development and Construction of 154kV Compact Substation Standard Model)

  • 민병욱;신명식;김태용;황윤곤;김영달
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.436-437
    • /
    • 2011
  • Before 1970s, 154kV substations in Korea were built in outdoor steel structure types only. In early 1970s, Germany developed GIS and the first indoor GIS type substation was built in Korea in 1980. In 1998, 154kV indoor type substations were standardized into regular type and urban type which applied steel frames to structures. In 2002, this was re-standardized into five different types in detail. In 2009, 154kV compact substation design was developed and standardized and saved about 20% of the construction cost with new technology and methods. Compact substations were classified into three types ; urban type, multi-function type, and regular type. The first urban type compact substation, Jang-ki substation, was built in Kimpo in June, 2010. This paper would present the standard model of 154kV compact substation and the way of improving facilities for the first compact substation.

  • PDF

초고압 변전기기의 예방진단 및 종합 자동화 (The Preventing and Diagnosis of Ultra High Voltage Substation Devices and Combination with An Automation System of A Substation)

  • 양항준;김경근;김성식;유정식;김홍석;이학성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.275-277
    • /
    • 2001
  • In this paper a preventative and diagnostic system for high and ultra high voltage electric power transmission apparatus is proposed to secure substation normal operation. The proposed system consists of monitoring sub-system and diagnostic sub-system, which are mainly for GIS and main transformer, and the system will be applied for newly established 765kV class substation in Korea. Some guideline for combination with substation control system are presented, and engineering solution as an improved substation automation system is also proposed.

  • PDF

RTU 기반 변전소의 IEC 61850 기반 SA 변전소로의 전환에 대한 실증 연구 (A Study on change from an RTU-based substation to IEC 6 1850-based SA substation)

  • 육심복;이성환;김종일
    • 한국정보전자통신기술학회논문지
    • /
    • 제11권4호
    • /
    • pp.436-444
    • /
    • 2018
  • 현재 변전소 자동화를 위해서는 국제 표준인 IEC 61850 통신규약이 사용되어지고 있고, 국내에서도 2007년도부터 시험 적용과 연구개발을 통해 2013년부터 신규 건설되는 변전소는 IEC 61850 기반의 디지털변전소로 준공되어 지고 있다. 하지만 기존 변전 설비들(변압기, T/L GIS, D/L GIS 등)은 그대로 사용하면서 기존 RTU 기반의 변전소 운영 시스템을 IEC 61850 기반의 SA 변전소 운영시스템으로 전환한 사례는 거의 없다. 따라서 기존 변전설비의 IEC 61850 도입은 기존 설비 재사용으로 변전소의 지속가능성을 증대시키고 또한 최신 도입되는 타 변전소와의 상호운영성을 개선하고 기존 변전소를 무인화 운전에 적합한 시스템으로 전환할 수 있는 이점이 있다. 본 논문에서는 기존의 RTU 기반 변전소 운영시스템을 IEC 61850 기반의 현장정보처리반, 이더넷 스위치반, SA 운영시스템을 이용하여 디지털 변전소화한 사례를 소개하고, 패킷 분석 툴인 IEC 61850 클라이언트 인증 프로그램과 Wireshark를 사용하여 IEC 61850 적합성 및 그 타당성을 실증을 통하여 검증하였다.

P.C.에 의한 GIS형 AC Substation의 접지계 설계 (Grounding System Design of GIS type AC Substation using Personal Computer)

  • 임한석;김왕
    • 한국조명전기설비학회지:조명전기설비
    • /
    • 제4권1호
    • /
    • pp.46-53
    • /
    • 1990
  • GIS(Gas-Insulated Switchgear)형 옥내변전소에 있어서 접지계의 구성은 접지도체를 포설할 수 있는 면적이 협소하기 때문에 특별한 설계방법이 요구된다. 본 논문에서는 접지망의 전위해석과 축소형 변전소의 접지계 설계기법을 제시하였고, 아울러 컴퓨터 시뮬레이션을 위한 프로그램을 작성하고 그 시뮬레이션 결과를 측정치와 비교하여 프로그램의 타당성을 입증하였다.

  • PDF

RF front-end Module for On-Line UHF Partial-discharge Monitoring System

  • Lee June Young;Kim Bok Ki
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2004년도 학술대회지
    • /
    • pp.776-779
    • /
    • 2004
  • A RF front-end module is designed for GIS(Gas Insulated Substation) which is employed for effective and efficient very high voltage transmission. Major advantage of the unit is improved PO detection sensitivity through minimizing the effect of surrounding interference signals, which is achieved by controlling the gain and the selection of the frequency band, for the precise detection of any UHF PO (Partial Discharge) disturbance occurred in the GIS due to some unwanted problems. For the development of the module, various switches for providing selected signal paths, wideband LNA, 3 BPF for selecting detection frequency band, and video detector are designed, fabricated and measured on 1 mm FR4 substrate with various RF components. The detection sensitivity of the unit was <-60 dBm that is sufficient to detect UHF PO signals as low as 1 pC. It is believed that the value is enough to detect the signal occurred in GIS.

  • PDF

The Lightning Current Parameters that Impact on the Surge Analysis of the EHV Gas Insulated Substation by EMTP

  • Shim Eung-Bo;Han Sang-Ok
    • KIEE International Transactions on Electrophysics and Applications
    • /
    • 제5C권1호
    • /
    • pp.1-7
    • /
    • 2005
  • This paper describes the lightning surge analysis model of extra high voltage GIS using EMTP. Various lightning current parameters were investigated in order to confirm the impact on the lightning surge analysis such as lightning current amplitude, waveform, size of GIS, tower footing resistance and surge arresters. The multi-story tower model and EMTP/TACS model were introduced for the simulation of dynamic arc characteristics. The margin between the maximum overvoltage and BIL of the GIS was about 10 percent and the margin between the maximum overvoltage and BIL of the transformer was 21 percent.