• Title/Summary/Keyword: Framework Planning

Search Result 885, Processing Time 0.029 seconds

Valuing Traffic Noise Cost Based on the Damage Cost Approach (피해비용 접근법을 바탕으로 한 소음비용 추정 연구)

  • JUNG, Dongjae;CHANG, Justin S.
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.4
    • /
    • pp.292-306
    • /
    • 2017
  • Traffic noise cost can be assessed either by the damage cost approach or by the avoidance cost method. This paper provides an overview of pertinent studies of these two approaches and shows that the damage cost approach is more universal and reliable than the avoidance cost counterpart. This study then investigated three sub-components to address the damage cost framework. First of all, unit value per person exposed to noise per year was calculated. Secondly, the area exposed to noise was determined using noise prediction equation. Thirdly, the number of people affected by noise was computed by multiplying the number of people exposed to noise with the percentage of people affected by noise. This paper also suggested a simplified equation that represents the relationship between damage costs and noise levels. Finally, the benefits of noise reduction derived from the damage cost method and those from the avoidance cost approach were compared and discussed.

Comparative Study Between U-City Plan and Related Plans (유비쿼터스도시계획과 관련계획의 비교연구)

  • Park, Chan-Ho;Lee, Jae-Suk;Shin, Dong-Bin;Kim, Jung-Hoon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.18 no.1
    • /
    • pp.99-109
    • /
    • 2010
  • The U-City comprehensive plan has been settled on November in 2009 by U-City law which was enacted in 2008. On this, the U-City plan's framework which local governments established has been set. However, those who work for U-City in local governments and private sector would be fallen into confusion because they have not fully understood yet the concept of planning system in the U-City plan. In this condition of the early stage, some problems that are overlapping investments and lack of coordination between plans may occur. On this background, it is needed to understand the U-City plan's status and role by figuring out the relationship between U-City plan and other related plans. The goal of this paper is to suggest implications that are differences and similarities for coordination among the plans through a comparison with detailed instructions and laws related to U-City planning.

Optimal path planning and analysis for the maximization of multi UAVs survivability for missions involving multiple threats and locations (다수의 위협과 복수의 목적지가 존재하는 임무에서 복수 무인기의 생존율 극대화를 위한 최적 경로 계획 및 분석)

  • Jeong, Seongsik;Jang, Dae-Sung;Park, Hyunjin;Seong, Taehyun;Ahn, Jaemyung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.43 no.6
    • /
    • pp.488-496
    • /
    • 2015
  • This paper proposes a framework to determine the routes of multiple unmanned aerial vehicles (UAVs) to conduct multiple tasks in different locations considering the survivability of the vehicles. The routing problem can be formulated as the vehicle routing problem (VRP) with different cost matrices representing the trade-off between the safety of the UAVs and the mission completion time. The threat level for a UAV at a certain location was modeled considering the detection probability and the shoot-down probability. The minimal-cost path connecting two locations considering the threat level and the flight distance was obtained using the Dijkstra algorithm in hexagonal cells. A case study for determining the optimal routes for a persistent multi-UAVs surveillance and reconnaissance missions given multiple enemy bases was conducted and its results were discussed.

A Study on Demand-oriented Model for Agricultural Development Cooperation : The Analysis on Agricultural Development Phase of African Countries (농업발전단계 분석을 통한 아프리카 수원국 중심의 국제농업개발협력 방안 연구)

  • Hwang, Jae-Hee;Kim, Sa-Rang;Lee, Seong-Woo
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.4
    • /
    • pp.33-46
    • /
    • 2013
  • The present study aims to provide an analytical framework for achieving aid and development effectiveness of agricultural cooperation with a demand-oriented perspective. This paper pays particular attention to categorize the stages of agricultural development of African recipients to identify demands for agricultural aid of the categorized groups. To do so, first of all, it establishes theoretical background to apply the demand-oriented concept and utilize the phase of agricultural development as an alternative for aid and development effectiveness. On the basis of the theoretical robustness, it conducts a series of analyses to categorize the African recipients by the development stages, incorporating factor analysis, cluster analysis and comparison between the present-future agricultural development levels. The findings propose analysis indicators for phase of agricultural development and clustered results including 18 countries of KAFACI members and priority countries in Africa. In addition to the practical application of the results, the methodological flow can be used as steps for sketching a future roadmap to construct the demand-oriented ODA(Official Development Assistance) plan. This paper also offers implications regarding ODA strategy of Korea in response to the phase of agricultural development and the aid demands.

Analysis of the Status and Limitation of the Biotope Area Ratio on Strategic Environmental Impact Assessment and Environmental Impact Assessment (전략환경영향평가 및 환경영향평가 사업에서의 생태면적률 적용 현황 및 한계점 분석)

  • Park, Jin-Han;Lee, Dong-Kun;Kim, Hyo-min;Sung, Hyun-Chan;Jeon, Seong-Woo;Choi, Jae-yong;Lee, Chang-Seok;Hwang, Sang-Yeon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.1
    • /
    • pp.55-71
    • /
    • 2018
  • To improve the ecological function of urban areas, the guideline for applying the Biotope Area Ratio to the Environmental Impact Assessment (EIA) was developed in 2005 and modified in the July, 2017. This study investigates whether the guideline has been actually practiced in the real world by searching reports including 648 cases of the Strategic Environmental Impact Assessment (SEIA) and 471 cases of the EIA. The results show that the 38% of SEIA and the 43% of EIA include sections about Biotope Area Ratio, and the 15% of SEIA and the 25 % of EIA are satisfied the threshold of the Biotope Area Ratio suggested by the guideline. The statistical analysis results show that this low level of practice was not improved through the modification of the guideline in 2017. This is because the guideline is forcibleness, its explanation is unclear, and stockholders' understanding of it lacks. In addition, lack of tracking management on SEIA and EIA also contributes to the low level of practice of the guideline. To promote the practice, the efforts to legislate and publicize the guideline are required.

Differences in Resources of Natural Recreation Forest Developed by Public and Private Body (공공 휴양림과 민간 휴양림의 유양자원의 차이)

  • 장병문;배민기
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.2
    • /
    • pp.22-31
    • /
    • 2001
  • The purpose of this paper is to investigate in resources of natural recreation forest(RNRF) developed both publicly and privately in order to answer the research question: what are the differences in RNRF development between public and private developers. After reviewing the literature, the developer´s decision-making and motivation of investment, and the planning process of natural recreation forest, We constructed the conceptual framework and have formulated the hypothesis of this research. We had obtained data through a questionnaire, which surveyed of 625 visitors at 9 of the 72 natural recreation forests in Korea in 1999, We have analyzed the data using the mean difference test and logistic regression method. We found that 1) the overall quality of resource elements in RNRF has been development excellent except for the sociocultural element of recreational resources, and public recreation forest have been of higher quality than that fo private development, 20 in bivariate analysis, all the variables on quality of RNRF by public developers have turned out to be better than those of private ones, 3) in multivariate analysis, such variable as valley and water, forest and wildness area, wild life, and landscape have been statistically significant at one percent level, 4) the higher the value of valley and water, the higher the probability of public development, while the higher the value of other variables excluding water and valley, the more likelihood the recreational forest is developed by a private developer, and 5) forest and wildness area has been turned out to be the most important independent variable in contributing to the value of dependent variable. The research results suggest that 1) the differences in the quality of resource elements in RNRF developed by public and private body be considered in the planning and design process in order to develop diverse activities to make use of the resource potential, and 2) considering the resource characteristics of private natural recreation forest and the motivation of private developers, private natural recreation forest will possibly be more dynamic and dynamic attractive areas. It is recommended that the difference in the degree of visitor´s satisfaction between public and private development be examined.

  • PDF

Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM) (DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구)

  • Kim, Seungho;Kim, Sangyong;Jean, Jihoon;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.151-159
    • /
    • 2016
  • Tower crane (T/C) is one of the major equipment that is highly demanded in construction projects. Especially, most high-rise building projects require T/C to perform lifting and hoisting activities of materials. Therefore, lifting plan of T/C needs to reduce construction duration and cost. However, most lifting plan of the T/C in construction sites has still performed depending on experience and intuition of the site manager without systematic process of rational work. Dependency structure matrix (DSM) is useful tool in planning the activity sequences and managing information exchanges unlike other existing tools. To improve lifting plan of T/C efficiently, this study presents a framework for the scheduling T/C using DSM through the case study in real world construction site. The results of case study showed that the scheduling T/C using DSM is useful to optimize the T/C lifting plan in terms of easiness, specially in the typical floor cycle lifting planning.

A Study on the Establishment of School Repair Cycle (학교시설 수선주기 설정에 관한 연구)

  • Lee, Sang Min
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.17 no.2
    • /
    • pp.38-47
    • /
    • 2018
  • In Korea, it is difficult to secure student health and safe educational environment due to the rapid deterioration of many school facilities built in the 70s and 80s in the past. As a result, through the improvement of school facilities, social needs for safe schools from various disasters, accidents, Is increasing. The purpose of this study was to establish a standard for the establishment of the national and school facilities for the mid - to long - term plan for the improvement of the old school facilities, and to propose a framework for mid - to long - term and rational planning that can be used by the national and local government offices. The purpose of this study is to establish a mid - and long - term plan for the improvement of old school facilities. The appropriate repair cycle for the improvement of the school facilities set up in this study can be utilized as a standard for the mid - and long - term planning for improvement of the school facilities in the Ministry of Education and the School of Education. To this end, a standard model, It is possible to roughly estimate the overall improvement in the mid- to long-term facilities at the national and regional levels.

A Contingent Study of Information System Planning (정보시스템 계획의 상황적인 연구)

  • Cho Hyun-Dal
    • Management & Information Systems Review
    • /
    • v.4
    • /
    • pp.137-159
    • /
    • 2000
  • Recently, the importance of ISP(Information System Planning) has been increased because of rapid change and severe competition in business environments. Furthermore, the role of IS in the organization has included not only the supportive activities but also the strategic activities. Organizations can get the competitive advantages through the strategic use of IT by establishing effective and systematic ISP implementation. The main focus of this study is investigate the relationship among three subunits(organizational factors, the role of IS and effective ISP) based on the contingent settings which the process of ISP is implemented. The reasons that conceptual framework of this study is based on the contingent theory are as follow: First, ISP process itself has a series of complicated work which various elements in a company are involved. ISP externally must have the process to evaluate information technology (technology related with IS). Internally ISP process has a serious of works including determining information requirements to develop successful IS for other functional departments and identifying strategic opportunity of IS aligned with business strategy. Secondly, the activity of ISP is occurring on the continual basis. Business environments in which ISP process has implemented are changing continuously. Specific ISP methodology which was appropriate in a certain period of time does not work any more because of the rapid changes in business environments. For this reason managers can hardly expect successful ISP without considering external environments or internal environments such as organizational or management side. For this study, 240 survey questionnaires were mailed and 71 questionnaires were returned. 57 samples were used for the final analysis and 14 samples were excluded from analysis in that they didn't exercise official and systematic ISP. As the result of analysis, among the internal factors(organizational size, time frame of decision making, budget, management style, organizational culture) organizational culture, management style and time frame of decision making are identified as contingent factors on the effective ISP. The result of this study may have meaning in suggesting the way to develop effective ISP through the formalization of business process, more favorable users attitude toward IS and selection of an appropriate ISP methodology.

  • PDF

Healing Performance Shown in International Design Guidelines for Nursing Homes (국외 요양시설 디자인가이드라인에 나타난 치유성능 연구)

  • Oh, Ahyeon;Jang, Miseon;Lee, Yeunsook
    • Korean Institute of Interior Design Journal
    • /
    • v.26 no.1
    • /
    • pp.43-52
    • /
    • 2017
  • Although nursing homes where physically weak seniors live must be planned as an healing environment for maintaining and improving holistic health conditions of the senior residents, many of the nursing homes in Korea are currently placed in poor environment due to lack of minimum criteria or design guideline for spatial planning. Therefore, this study aims to extract healing elements shown in nursing home design guidelines that have been developed and utilized in several developed welfare countries where aging has started before Korea. The subjects of this study were 4 international nursing homes design guidelines; and they were analyzed by the content analysis technique. As for analysis units, design guideline items were selected; and spatial composition, three dimensions of health, and healing elements for supporting the health conditions were used as analysis categories. As results, firstly, among total 259 guidelines, the guidelines that commonly applied to all the spaces turned out to be the most, then the guidelines to be applied in bathroom turned out to be the most. Secondly, in terms of holistic health, the proportion of design guideline for supporting physical health turned out to be highest followed by the one for mental health and social health. Thirdly, In terms of healing elements, items for safety, accessibility, comfort, and convenience that supported physical health and cognition that supported mental health turned out to be high. This study is expected to provide the framework for comprehensively understanding the existing design guidelines of nursing homes in the perspective of healing and to be utilized as fundamental resource for spatial planning to improve healing effects in the nursing homes in the future.