• 제목/요약/키워드: Frame work

검색결과 804건 처리시간 0.02초

Cost Analysis of the Structural Work of Green Frame

  • Joo, Jin-Kyu;Kim, Sun-Kuk;Lee, Goon-Jae;Lim, Chae-Yeon
    • 한국건축시공학회지
    • /
    • 제12권4호
    • /
    • pp.401-414
    • /
    • 2012
  • The adoption of Green Frame is expected to provide economic benefits, since construction costs are reduced by the in-situ production of precast concrete column and beam. The cost reduction can ultimately be realized by saving transportation costs and the overhead and profit of PC plants. The cost structure of Green Frame, which is built up using composite precast concrete members, is similar to that of a bearing-wall structure, but the difference in construction process has resulted in some cost differences for a few items. In particular, production and installation is the principal work involved in Green Frame made by precast concrete members, while form and concrete work is the principal work for a bearing-wall structure. As such, the rental time and fee for a tower crane should be compared through time analysis. To verify reliability, this study focused on developed residential projects to estimate the construction costs. Through this analysis, it was found that the costs of Green Frame were 1.57% lower than the costs of bearing-wall structure. The results of this study will help in the development of a management plan for the structural work of Green Frame.

초고층 골조공사 생산성 향상을 위한 작업 프로세스 개선 (A Work Process for Productivity Improvement of Concrete Structural Frame Work in Tall Building)

  • 장지선;신윤석;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.161-164
    • /
    • 2005
  • According to the trend of tail building, it is essential to improve productivity in tall building construction. However, the study on that is insufficient until now. Therefore, the purpose of this study is to propose a new work process of efficient concrete structural fame work to improve productivity in tall building construction. The results of being applied proposed work process are that the 5day cycle time of concrete structural frame work is cut by 0.5day and the quantity of rebar to be demanded in concrete structural frame work is reduced.

  • PDF

아파트 구체공사의 공정관리 및 공기지연요소 분석에 관한 연구 (Analysis of Progress Schedule and Delay Element of Frame Works in Apartments)

  • 최은준;최민권;조형근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.157-160
    • /
    • 2003
  • In order to reduce the construction cost and period without degrading the quality, construction companies are making a lot of efforts to prefabricate and mechanize the construction process, and introducing and utilizing various techniques of construction time management in the process of construction. However, due to the various factors (such as weather conditions, labor factors, supply of equipment and materials, safety accident, etc) in the process of construction, construction projects are not frequently completed within the scheduled Period. This research is to examine the current status of construction time management and factors causing delay in construction with regard to the concrete work (such as form work, steel reinforcement, and concrete work) in building apartments.

  • PDF

중대재해사례와 직업강도를 고려한 건축공사 위험성 평가 (A Study on the Risk Rate of Work Type According to the Fatal Accident Cases and the Work Strength in Construction Work)

  • 이종빈;고성석;장성록
    • 한국안전학회지
    • /
    • 제21권4호
    • /
    • pp.102-107
    • /
    • 2006
  • Construction accidents have not decreased in spite of much effort such as new work methods, education and research related to safety works. Specially, many fatal accidents happened in construction works which involve the apartment, building, school, church, hotel, hospital, bank work and the other works. These accidents are mainly caused by unanticipated risk factors. From these reasons, this study researched fatal accidents which happened in construction works during last 13 years($1992{\sim}2004$) and analyzed the input workers and a work period of construction work. According to the input workers and a work period, the results are as following. During 13years($1992{\sim}2004$), the fatal accidents, related to the construction work, were happened to the 1,977 cases. These results were occupied the 21.32% of the total industry accidents. According to the result of the construction, the fatal accident rate of a concrete form work was the highest rate of 16.24% (321 cases) and a temporary work, a steel frame work was the each rate of 12.39%(245 cases), 10.07%(199 cases). Comparing to other work types, the fatal accident rate of those three work types(concrete form work, temporary work, steel work) was represented highly. We surveyed input workers and work period of construction work site. From the result of survey, input workers of a concrete form work were occupied with 13,720. The risk rate of the work type, which was considered input workers and work period, was represented 0.3622(a steel frame work), 0.1142(a temporary work), 0.0782(a tower crane) and 0.0772(a concrete work).

철골공사의 품질관리 업무 프로세스 모델 개발 (A Work Process Model for a Quality Management in Steel Frame Work)

  • 김종성;김형중;변은정;구교진;현창택
    • 한국건설관리학회논문집
    • /
    • 제8권3호
    • /
    • pp.150-158
    • /
    • 2007
  • 건축물이 고층화, 대형화되면서 철골구조를 기본골조로 채택하는 경우가 많아지고 있으며, 철골공사의 품질관리는 사전계획단계부터 이루어지며, 단계별 참여자간의 업무 구분 및 연계가 매우 중요하다 이에 본 연구는 철골공사의 품질관리를 보다 원활하게 수행하기 위하여, 기존 철골공사 품질관리업무를 기반으로 업무간 상호관계 및 입출력 정보를 고려한 품질관리 업무 프로세스 모델을 개발하고자 한다.

초고층 골조공사의 바닥 거푸집별 생산성 분석;기준층 3일 공정을 중심으로 (The Productivity Analysis by Slab Formwork of Structural Frame Work in Tall Building Construction)

  • 김태훈;신윤석;조성수;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 추계 학술논문 발표대회
    • /
    • pp.115-118
    • /
    • 2007
  • A tall building construction is needed to reduce the construction duration for project profitability. Reducing the cycle time of typical floor in the structural frame work which have the largest duration in the whole construction, greatly affects construction duration. Nowadays, some projects are accomplished in the 3 day cycle. In order to accomplish efficiently 3 day cycle, productivity information of similar projects is supported. Therefore, this study proposed labor productivity and application by slab formwork to construct by the 3 day cycle. In order to perform an analysis, we selected 3 cases and analyzed the labor productivity on the basis of the amount of slab forms, labors, and durations. Then, we performed the questionnaire to analyze the application by formwork of tall building construction engineers. This study will contribute to establish a reasonable scheduling in structural frame work of a new similar project.

  • PDF

Analysis of Dynamic Development Initiative frame work for Knowledge Processing Outsourcing

  • Clementking, A.;Rani, Rani;Meraj, Syeda
    • 한국융합학회논문지
    • /
    • 제5권2호
    • /
    • pp.25-32
    • /
    • 2014
  • Indian economy growth changed due Indian business operational approach with convergent technologies. The current economy growth supported by Information Technology Development and Information Technology Enabled Service. As part of the Information technology enabled upcoming Knowledge processing outsourcing provide huge opportunities to develop Indian business with our human resources. The KPO business sector basis and frame work can be achieve through Development Dynamic initiatives. This paper discuss about the basis of KPO and Dynamic Development Initiative frame work strategic compact components and its characters.

전동윈치를 적용한 자립형 철골 접합부의 생산성 분석 (A Productivity Analysis of Self-supported Steel Joint using Automated Wire Control Machine)

  • 김창원;조남석;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.325-326
    • /
    • 2012
  • Because steel frame has own characteristics as easy to work and structural safety, it is being increased application by the trend of construction industry has been more higher and larger in today. However, steel frame works have potential problem, so fundamental solution is needed for preventing serious accidents. Recently, self-supported steel joint for enhancing safety is developed in Korea, but this system has some limitations as convenience of work, retainment of consistent productivity. For complementing this limitations, we developed the new system named Automated wire control machine. This study is performed productivity of steel frame work by new system. The basis data for analysing productivity is collected from field test.

  • PDF

Form-LPSRC 기둥 개발 및 적용 연구 (Construction Application of a Newly Developed Form-Latticed Prefabricated Steel Reinforced Concrete Column)

  • 백호진;이승환;김수영
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.487-495
    • /
    • 2014
  • 골조공사는 프로젝트의 전체 공사비 및 공사기간에서 차지하는 비율에 매우 높으며, 대형 프로젝트에서 골조공사 공기단축은 프로젝트의 성패를 결정하는 중요한 요소이다. 이에 공기단축을 위한 새로운 공법에 대한 연구가 지속적으로 이루어져 오고 있다. H형강 대신 앵글을 사용하는 PSRC 합성기둥은 기존의 SRC 기둥에 비해 높은 휨강도 및 연성도를 가지며 현장에서의 철근작업을 생략할 수 있다는 장점이 있으나, 여전히 거푸집작업이 필요하다는 한계점이 있다. 본 연구는 기존의 PSRC 기둥 공법을 개선하여 영구거푸집까지 선조립하는 Form-LPSRC 기둥 공법을 개발하는 것을 목적으로 한다. Mock-up test를 통해 발생 가능한 문제점을 사전에 검토함과 동시에 현장 적용을 통해 해당 공법의 적용효과를 분석하였으며, 기존 SRC 기둥에 공기, 원가, 품질, 안전, 환경 측면에서 우수한 것으로 나타났다.