• Title/Summary/Keyword: Frame Works

Search Result 272, Processing Time 0.029 seconds

A Study on the Risk Rate of Work Type According to the Fatal Accident Cases and the Work Strength in Construction Work (중대재해사례와 직업강도를 고려한 건축공사 위험성 평가)

  • Lee, Jong-Bin;Go, Seong-Seok;Jang, Seong-Rok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.102-107
    • /
    • 2006
  • Construction accidents have not decreased in spite of much effort such as new work methods, education and research related to safety works. Specially, many fatal accidents happened in construction works which involve the apartment, building, school, church, hotel, hospital, bank work and the other works. These accidents are mainly caused by unanticipated risk factors. From these reasons, this study researched fatal accidents which happened in construction works during last 13 years($1992{\sim}2004$) and analyzed the input workers and a work period of construction work. According to the input workers and a work period, the results are as following. During 13years($1992{\sim}2004$), the fatal accidents, related to the construction work, were happened to the 1,977 cases. These results were occupied the 21.32% of the total industry accidents. According to the result of the construction, the fatal accident rate of a concrete form work was the highest rate of 16.24% (321 cases) and a temporary work, a steel frame work was the each rate of 12.39%(245 cases), 10.07%(199 cases). Comparing to other work types, the fatal accident rate of those three work types(concrete form work, temporary work, steel work) was represented highly. We surveyed input workers and work period of construction work site. From the result of survey, input workers of a concrete form work were occupied with 13,720. The risk rate of the work type, which was considered input workers and work period, was represented 0.3622(a steel frame work), 0.1142(a temporary work), 0.0782(a tower crane) and 0.0772(a concrete work).

A Performance Comparison of Block-Based Matching Cost Evaluation Models for FRUC Techniques

  • Kim, Jin-Soo;Kim, Jae-Gon
    • Journal of information and communication convergence engineering
    • /
    • v.9 no.6
    • /
    • pp.671-675
    • /
    • 2011
  • DVC (Distributed Video Coding) and FRUC (Frame Rate Up Conversion) techniques need to have an efficient motion compensated frame interpolation algorithms. Conventional works of these applications have mainly focused on the performance improvement of overall system. But, in some applications, it is necessary to evaluate how well the MCI (Motion Compensated Interpolation) frame matches the original frame. For this aim, this paper deals with the modeling methods for evaluating the block-based matching cost. First, several matching criteria, which have already been dealt with the motion compensated frame interpolation, are introduced and then combined to make estimate models for the size of MSE (Mean Square Error) noise of the MCI frame to original one. Through computer simulations, it is shown that the block-based matching criteria are evaluated and the proposed model can be effectively used for estimating the MSE noise.

Accelerating RFID Tag Identification Processes with Frame Size Constraint Relaxation

  • Park, Young-Jae;Kim, Young-Beom
    • Journal of information and communication convergence engineering
    • /
    • v.10 no.3
    • /
    • pp.242-247
    • /
    • 2012
  • In the determination of suitable frame sizes associated with dynamic framed slotted Aloha used in radio frequency identification tag identification processes, the widely imposed constraint $L=2^Q$ often yields inappropriate values deviating far from the optimal values, while a straightforward use of the estimated optimal frame sizes causes frequent restarts of read procedures, both resulting in long identification delays. Taking a trade-off, in this paper, we propose a new method for determining effective frame sizes where the effective frame size changes in a multiple of a predetermined step size, namely ${\Delta}$. Through computer simulations, we show that the proposed scheme works fairly well in terms of identification delay.

Experimental study on RC frame structures strengthened by externally-anchored PC wall panels

  • Choi, Seung-Ho;Hwang, Jin-Ha;Lee, Deuck Hang;Kim, Kang Su;Zhang, Dichuan;Kim, Jong Ryeol
    • Computers and Concrete
    • /
    • v.22 no.4
    • /
    • pp.383-393
    • /
    • 2018
  • Infill wall strengthening method has been widely used for seismic strengthening of deteriorated reinforced concrete (RC) frame structures with non-seismic details. Although such infill wall method can ensure sufficient lateral strengths of RC frame structures deteriorated in seismic performances with a low constructional cost, it generally requires quite cumbersome construction works due to its complex connection details between an infill wall and existing RC frame. In this study, an advanced seismic strengthening method using externally-anchored precast wall panels (EPCW) was developed to overcome the disadvantage inherent in the existing infill wall strengthening method. A total of four RC frame specimens were carefully designed and fabricated. Cyclic loading tests were then conducted to examine seismic performances of RC frame specimens strengthened using the EPCW method. Two specimens were fully strengthened using stocky precast wall panels with different connection details while one specimen was strengthened only in column perimeter with slender precast wall panels. Test results showed that the strength, stiffness, and energy dissipation capacity of RC frame specimens strengthened by EPCWs were improved compared to control frame specimens without strengthening.

Experimental Study on Aseismic Performance Existing School Buildings due to the Steel Reinforcement (강재 보강에 따른 기존 학교건축물의 내진성능에 관한 실험적 연구)

  • Lee, Ho;Park, Sung-Moo;Kwon, Young-Wook;Byeon, Sang-Min
    • Journal of Korean Association for Spatial Structures
    • /
    • v.13 no.3
    • /
    • pp.45-55
    • /
    • 2013
  • The core aim of this paper is to empirically scrutinize a strength characteristic and ductility of the beam-column frame of reinforced with steel subjected to the cyclic lateral load. First and foremost, I the author embarks upon making four prototypes vis-$\grave{a}$-vis this research. Through this endeavour, the author has analysed cyclic behavior, fracture shape, ductility and energy dissipation of the normal beam-column frame and a beam-column frame of reinforced with steel. In addition, the survey has revealed the exact stress transfer path and the destructive mechanism in order to how much a beam-column frame of reinforced with steel has resistance to earthquake regarding all types of building, as well as school construction. To get the correct data, the author has compared the normal beam-column frame and three types of the beam-column frame of reinforced with steel following these works, the characteristic of cyclic behavior, destructive mechanism, ductility, and Energy dissipation of normal beam-column frame and a beam-column frame of reinforced with steel have been examined clearly.

Process Analysis & Evaluation for Steel Frame Fabrication Automation (철골조립공사 자동화를 위한 프로세스 분석 및 평가)

  • Kim, Baek-Joong;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.155-158
    • /
    • 2007
  • The construction industry kept lower level of the technology and productivity improvement than any other kinds of industry. But in most analysis of previous construction work which promoted the productivity of construction, the analysis process has only developed by the economical efficiency or the time studies through work sampling in construction field, So We suggest motion analysis as a tool to solve these problems. Spacially, this study find out productivity improvement method of steel frame fabrication works with using motion analysis. If the result of this study were to be applied to the actual construction field, it will be of great help for Building Construction Automation.

  • PDF

Analysis on the Basis of the Characterstics Poststructural-Cognizance Expressed in Fashion Design(II) -Focus on 2001~2005 Prêt-á-Porter Collections- (복식디자인에 표현된 포스트구조주의적 인식특성 분석(II) -2001~2005 프레타 포르테 컬렉션을 중심으로-)

  • Kwan, Jung-Sook
    • Fashion & Textile Research Journal
    • /
    • v.8 no.2
    • /
    • pp.156-160
    • /
    • 2006
  • Poststructuralism gives us a clue to totally understand fashion design, which is in danger of difficulty and frivolous ambiguity caused by indiscreet creating and groundless interpretation of Postmodernism. In addition, it leads us to have a new viewpoint, which is freed from stereotyped past concepts and constraints, with regard to fashion design. The main purpose of this study is to examine the various theoretic systems and characteristic concepts of Poststructuralism, and supply a new cognizance frame to understand the processes of fashion design with free and varied notions of deconstruction and generation, in place of the former systematic and consistent interpretation of meaning. Concerning fashion design, present study employs a two-way research method: analysis of theories and analysis of contents. In analysis of theories, a cognizance frame is proposed that can categorize the concepts of cognizance are classified into Nonboundariness, Otherness, and Textualism, derived from various theories of Poststructuralism, as traits expressed in fashion design. In analysis of contents, 10 fashion designers are chosen who exhibit new works at every Pr$\hat{e}$t-$\acute{a}$-Porter collection. Including 20 works that those designers displayed at Pr$\hat{e}$t-$\acute{a}$-Porter from spring/summer 2001 through autumn/winter 2004-2005, a total of 200 works are analyzed.

Field Application of Up-Up Construction Using Buried Wale Continuous Walt System Method (CWS공법(Buried Wale Continuous Wall System)을 적용한 Up-Up 시공사례)

  • Lee Jeong-Bae;Lim In-Sig;Kim Dong-Hyun;Oh Bo-Hwan;Ha In-Ho;Rhim Hong-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.1-4
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved duality and reduction of construction period can be obtained from CWS method.

  • PDF

Study on Development of CWS (buried wale Continuous Wall System) Method (CWS공법(buried wale Continuous Wall System)의 개발에 관한 연구)

  • Lee Jeong-Bae;Lim In-Sig;Chun Sung-Chul;Oh Boh-Wan;Ha In-Ho;Rhim Hong-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.2 s.20
    • /
    • pp.81-89
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved qualify and reduction of construction period can be obtained from CWS method.