• Title/Summary/Keyword: Forging process

Search Result 846, Processing Time 0.022 seconds

A Process Design for Hot-Forging of a Titanium-6242 Disk (티타늄-6242 디스크의 열간단조를 위한 공정설계)

  • 박종진
    • Transactions of Materials Processing
    • /
    • v.3 no.3
    • /
    • pp.271-281
    • /
    • 1994
  • Titanium-6242 $({\alpha}+{\beta})$ alloy has been used for aircraft engine components such as disks and blades, because it has an excellent strength/weight ratio at high temperatures. When this material is forged to manufacture disks, process parameters should be carefully designed to control strain and temperature distributions within the process windows by which desirable mechanical properties can be produced. In the present investigation, it was intended to design the process parameters for a conventional hot forging of this material by using a rigid-thermoviscoplastic finite element analysis technique. It was assumed that the process was performed by a screw press which is capable of maintaining a constant ram speed during loading. From the analysis results, it was found out that the initial temperature of the workpiece and the die shape were important parameters to control the forging process. In result, these parameters were properly designed for hot forging of a disk with specific dimensions.

  • PDF

Effect of Process Parameters on Cylindrical Open Die Forging (FEM을 이용한 원형 자유단조의 공정인자 영향에 관한 연구)

  • 최성기;김원태;천명식;문영훈
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2003.05a
    • /
    • pp.221-224
    • /
    • 2003
  • In the open die forging process, it is difficult to optimize process parameters such as die shape, initial ingot size, feeding pitch, rotation angle and other process parameters in the operational environments. Therefore in this study, 3D finite element analysis has been performed to obtain optimal process condition for open die forging process. FEM analyses at various feeding pitches and rotation angles provide process conditions to make round bar having precise dimensional accuracy.

  • PDF

Development of Hot die Forging Process for Large-size Titanium Alloy Container (대형 티타늄 합금 용기의 고온 금형 성형 공정 개발)

  • Kwon, I.K.;Kim, D.S.;Park, T.D.;Park, H.S.;Hong, S.S.;Shim, I.O.
    • Transactions of Materials Processing
    • /
    • v.19 no.1
    • /
    • pp.50-58
    • /
    • 2010
  • In order to successfully implement hot die forging process for the large-size titanium alloy products, it is necessary to devise a customized heating method for the billets and the die tools, as well as the die tool design. This study aims at establishing a hot die forging process of the large-size titanium alloy container products by applying the warm die, semi-hot die and hot die forging process step-wise. To accomplish this purpose, forging mechanism and the die tools were designed considering the strength of die materials at the given die heating temperature. The movable heating devices for the billet and the die tools were also introduced to prevent overcooling of billet and die tools. To verify the applicability of the designed forging process, real-size forging tests were carried out and the quality of forged products, including dimension, surface condition, microstructure and the mechanical properties was evaluated.

A Study on Cold Forging Process Design of a Terminal Pin for High-Voltage Capacitors (고압콘덴서용 단자핀의 냉간단조 공정설계에 관한 연구)

  • 김홍석;윤재웅;손일헌
    • Transactions of Materials Processing
    • /
    • v.13 no.7
    • /
    • pp.586-593
    • /
    • 2004
  • A terminal pin, which is a part of high-voltage capacitors, has a plate-shaped head section with thickness of 0.8mm. The current manufacturing process, in which the head section is welded on the body part, has given wide deviations of part qualities such as geometrical accuracy, mechanical strength and electrical stability. In this study, a cold forging process sequence was designed in order to produce the terminal pin as one piece. The plate-shaped head section requires an upsetting in the lateral direction of a cylindrical billet, which is followed by a blanking process. The deformed geometry of the lateral upsetting, however, could not be predicted precisely by intuition since metal flows of an axial and a lateral direction of the cylindrical billet would occur simultaneously. Therefore, in this study, three dimensional finite element analyses were applied to the lateral upsetting process in order to determine a proper diameter and height of the cylindrical billet. Once the geometry of the initial billet was determined, intermediate forging processes were designed by applying cold forging guidelines and the designed process sequence was verified by two dimensional finite element analysis. In addition, cold forging tryouts were conducted by using a die set, which was manufactured based on the designed process and finally we found that the part qualities were improved by the proposed cold forging process.

Forming Analysis and Experiment of Hard to Forming T Shape Aluminum Part (난성형 T형상 알루미늄 부품의 성형공정 해석 및 실험)

  • Jin, Chul-Kyu
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.20 no.2
    • /
    • pp.141-148
    • /
    • 2017
  • A process comprising a hot extrusion process and a warm forging process was designed to form a T-shaped aluminum structural component with a high degree of difficulty by the plastic forming method. A circular cylindrical part was extruded with a hot extrusion process, and then an embossing part was formed with a warm forging process. The formability and the maximum load required for forming were then determined using a forming analysis program. The hot extrusion process was executed at $450^{\circ}C$ under the extrusion speed at 6 mm/s, while the warm forging process was executed at $260^{\circ}C$ under the forging speed at 150 mm/s. For both the processes, a condition by which friction would not be generated between the mold and the material was implemented. The analysis results showed that the load required for hot extrusion was 1,019 tons, while the load required for the warm forging was 534 tons. The T-shaped part was manufactured by using a 1,600 tons capacity press. The graphite lubricant was coated on the mold as well as the material. A forming experiment was performed under the same condition with the analysis condition. The measured values from the load cell were 1,210 tons in the hot extrusion process and 600 tons in the warm forging process.

Finite Element Analysis for Multi-stage Forging Process Design of Bolt with Nonaxisymmetric Washer Cam (비축대칭 와셔 캠 볼트의 다단 단조공정 설계를 위한 유한요소 해석)

  • Kim, Kwan-Woo;Kim, Yi-Tae;Kim, Wan-Jong;Cho, Hae-Yong
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.32 no.4
    • /
    • pp.585-595
    • /
    • 2008
  • Process design of multi-stage forging for a bolt with nonaxisymmetric washer cam has been studied by using finite element method. For shape complexity of the bolt, it is impossible to manufacture in a single stage forging. To design multi-stage forging for the bolt the forging load and fiber flow of each step have been analyzed by using commercial finite element code DEFORM-3D. Simulated results have been compared with experimental ones. Multi-stage forging process has been designed with four stages. The workpiece should be eccentric shape until third forging stage. And then bolt head and washer of eccentrical shape is created in last stage. As a results, It was predicted that shape of product would be good and effective strain would be uniformly distributed in the product. Also, it was predicted whether defects would exist or not by reviewing the fiber flow.

Finite Element Analysis for Design of Closed Die Forging Process of a Bevel Gear (베벨기어의 밀폐단조 공정설계를 위한 유한요소해석)

  • Kim, Yohng-Jo;Park, Sung-Dae
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.2 no.1
    • /
    • pp.92-99
    • /
    • 2003
  • Bevel gears are important mechanical parts to transmit power in transportation system high precision parts like bevel gears might be manufactured by closed die forging process for dimensional accuracy. Closed die forging of bevel gears offers the high quality and good mechanical properties and also leads to considerable cost saving. To determinate the proper closed-die forging process for bevel gear forms, three-dimensional finite element simulation for the progressive forging process was earned out and also the simulation results were compared with experimental results.

  • PDF

The Effect of Pressure on Liquid Segregation in Direct Rheo-Forging Process of Aluminum Alloys (알루미늄 소재의 레오로지 직접단조공정에서 가압력이 액상 편석에 미치는 영향)

  • Oh, S.W.;Bae, J.W.;Kang, C.G.
    • Transactions of Materials Processing
    • /
    • v.16 no.3 s.93
    • /
    • pp.178-186
    • /
    • 2007
  • Rheo-forging process of aluminum alloy is suitable for large parts of net shape without defects and excellent mechanical properties in comparison with conventional die casting and forging process. To control the microstructure of the product with high mechanical properties in rheo-forming, solid fraction is required to prevent porosity and liquid segregation. Therefore, in rheo-forging process, die shape, pressure type and solid fraction are very important parameters. The defects such as porosity, liquid segregation and unfitting phenomena occur during rheo-forging process. To prevent these defects, mechanical properties and microstructure analysis of samples versus the change of pressure are carried out and the problem and its solutions are proposed. Also, the mechanical properties versus various pressures were compared with and without heat treatment. The alloys used for rheo-forming are A356 and 2024 aluminum alloy. The rheology material is fabricated by electromagnetic process with controlling current and stirring time.

Computer Aided Process Design in Cold-Former Forging (컴퓨터를 이용한 냉간포머단조 공정설계)

  • 임창수;서성렬;이민철;김주현;전만수
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.10
    • /
    • pp.51-57
    • /
    • 1998
  • In this paper, a computer aided process design technique, utilizing a forging simulator and a commercial CAD software, is presented together with its related design system for cold-former forging of ball joints. The forging sequence design is carried out through user-computer interaction by using design templates, design database, experience or knowledge-based rules and some basic laws found in the literature. The forging simulation technique is used to verify the process design. The detail designs including die set drawings and die manufacturing information are automatically generated. It has been shown that the engineer ing and design productivity is much improved by the presented approach in the practical standpoint of process design engineers.

  • PDF

A Study on Transfer Process Design on Hot Forging of Bearing Hub (베어링 허브의 트랜스퍼 열간 단조 공정 설계에 관한 연구)

  • Byun H.S.;Kim B.M.;Ko D.C.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.10a
    • /
    • pp.993-996
    • /
    • 2005
  • This paper is concerned with transfer process on hot forging of bearing hub. Workers on hot forging have difficulty in working by high temperature and weight workpiece. And In conventional got forging of bearing hub, the material wasted to the flash accounts approximately 10% of the original workpiece. It is need manufacture automation and reduce the cost of forged products. Surface treatment of die and lubricant are investigated from experiment and FE-simulation for analysis of forming simulation. In order to hot forging process design considered flash thickness and blocker geometry and initial temperature of die and billet. This transfer process gave comparatively good results compared with actual products.

  • PDF