• 제목/요약/키워드: Flowshop System

검색결과 20건 처리시간 0.02초

주문 생산 방식을 따르는 혼합 흐름 공정에서의일정계획에 관한 연구 (Scheduling Methods for a Hybrid Flowshopwith Dynamic Order Arrival)

  • 이근철
    • 대한산업공학회지
    • /
    • 제32권4호
    • /
    • pp.373-381
    • /
    • 2006
  • This paper considers a scheduling problem for a hybrid flowshop with dynamic order arrival. A hybrid flowshop is an extended form of a flowshop, which has serial stages like a flowshop but there can be more than one machine at each stage. In this paper, we propose a new method for the problem of scheduling with the objective of minimizing mean tardiness of orders which arrive at the shop dynamically. The proposed method is based on the list scheduling approach, however we use a more sophisticated method to prioritize lots unlike dispatching rule-based methods. To evaluate the performance of the proposed method, a simulation model of a hybrid flowshop-type production system is constructed. We implement well-known dispatching rules and the proposed methods in the simulation model. From a series of simulation tests, we show that the proposed methods perform better than other methods.

유연흐름 생산시스템에서의 시뮬레이션을 이용한 동적일정계획 연구 (The dynamic production scheduling on flexible flowshop systems using simulation)

  • 우훈식
    • 한국시뮬레이션학회논문지
    • /
    • 제5권2호
    • /
    • pp.1-12
    • /
    • 1996
  • Utilizing the simulation approaches, the dynamic production scheduling system FOLS(Flexible flowshop On-Line Simulation) is developed under the flexible flowshop environment. When an interruption such as machine failure/recovery is occurred at the shop floor, the FOLS system performs evaluations for job selection rule oriented alternatives, and generates a dynamic production schedule based on the collected current shop floor data. For the case study, the FOLS system is applied to the printed circuit card assembly(PCCA) line and simulation results are reported.

  • PDF

부품외주를 고려한 조립형 Flowshop 일정계획 해법 개선 (An Improvement of Algorithms for Assembly-type Flowshop Scheduling Problem with Outsourcing)

  • 윤상흠;전재호
    • 산업경영시스템학회지
    • /
    • 제31권2호
    • /
    • pp.80-93
    • /
    • 2008
  • This paper improves algorithms for an assembly-type flowshop scheduling problem in which each job is to assemble two types of components and makespan is the objective measure. For the assembly, one type of the components is outsourced with job-dependent lead time but the other type is fabricated in-house. When both components for a job are prepared, the assembly operation for the job can be started. This problem had been proved to be NP-Complete, so branch-and-bound (B&B) and heuristic algorithms have already been developed. In this paper, we suggest other dominance rules, lowerbound and heutistic algorithms. Also, we develop a new B&B algorithm using these improved bound and dominance rules. The suggested heuristics and B&B algorithm are compared with existing algorithms on randomly-generated test problems.

부품외주를 고려한 조립형 Flowshop 일정계획문제 연구 (An Assembly-Type Flowshop Scheduling Problem with Outsourcing Allowed)

  • 전재호
    • 산업경영시스템학회지
    • /
    • 제29권4호
    • /
    • pp.34-42
    • /
    • 2006
  • This paper considers an assembly-type flowshop scheduling problem in which each job is assembled with two types of components. One type of the components is outsourced with positive lead time but the other type is fabricated in-house at the first stage. The two types of the components should be prepared at the first stage before starting the assembly operation for each job at the second stage. The objective is to schedule the jobs so that the makespan is minimized. Some solution properties and lower bounds are derived and incorporated into a branch and bound algorithm. Also, an efficient heuristic is developed. The performances of the proposed branch and bound algorithm and heuristic are evaluated through computational experiments.

Flowshop 일정계획을 위한 Simulated Annealing 알고리듬 이용 (A Study on Simulated Annealing Algorithm in Flowshop Scheduling)

  • 우훈식;임동순;김철한
    • 산업경영시스템학회지
    • /
    • 제21권45호
    • /
    • pp.25-32
    • /
    • 1998
  • A modified simulated annealing algorithm is proposed and applied to the permutation flowshop scheduling with the makespan objective. Based on the job deletion and insertion method, a newly defined Max-min perturbation scheme is proposed to obtain a better candidate solution in the simulated annealing process. The simulation experiments are conducted to evaluate the effectiveness of the proposed algorithm against the existing heuristics and results are reported.

  • PDF

재투입이 존재하는 2단계 흐름공정에서 총 작업 흐름시간을 최소화하는 분지한계방법 (Branch and Bound Algorithm for Two-Machine Reentrant Flowshop with the Objective of Minimizing Total Flowtime)

  • 최성우;심상오
    • 산업경영시스템학회지
    • /
    • 제33권4호
    • /
    • pp.1-9
    • /
    • 2010
  • In this paper, we consider a two-machine re-entrant permutation flowshop scheduling problem with the objective of minimizing total flowtime, and suggest branch and bound algorithms for the scheduling problem. In this scheduling problem, each job must be processed twice on each machine, that is, each job should be processed on the two machines in the order of machine 1, machine 2 and then machine 1 and machine 2. In this research, based on the results of existing researches for re-entrant permutation flowshop scheduling problems, various dominance properties, lower bound and heuristic algorithm are suggested for the problem, and those are used to develop branch and bound algorithms. In the computational experiments for evaluation of the performance of the algorithms, the suggested branch and bound algorithms are tested on randomly generated test problems and results are reported.

부품 생산과 조립으로 구성된 2단계 조립 일정계획의 Flowtime 최소화 연구 (Heuristic Algorithms for Minimizing Flowtime in the 2-Stage Assembly Flowshop Scheduling)

  • 이익선;윤상흠;하귀룡;전재호
    • 산업경영시스템학회지
    • /
    • 제33권4호
    • /
    • pp.45-57
    • /
    • 2010
  • This paper considers a 2-stage assembly flowshop scheduling problem where each job is completed by assembling multiple components. The problem has the objective measure of minimizing total completion time. The problem is shown to be NP-complete in the strong sense. Thus, we derive some solution properties and propose three heuristic algorithms. Also, a mixed-integer programming model is developed and used to generate a lower bound for evaluating the performance of proposed heuristics. Numerical experiments demonstrate that the proposed heuristics are superior over those of previous research.

FMS운용을 위한 일정계획용 소프트웨어 (Development of Scheduling Software for Flexible Manufacturing System)

  • 윤덕균;황의철
    • 산업경영시스템학회지
    • /
    • 제14권24호
    • /
    • pp.53-69
    • /
    • 1991
  • This paper is concerned with software developments for scheduling and sequencing of FMS. The scheduling algorithms are developed for 3 types of FMS:single machine type FMS, flowshop type FMS. assembly line type FMS. For the single machine type FMS. full enumeration algorithm is used. For the flowshop type FMS heuristic algorithms are developed. For the assembly type FMS the exsisting PERT/CPM algorithm is applied. Numerical examples are presented for illustration of each algorithm. Each soft ware program list are attached as appendices.

  • PDF

아웃소싱 전략을 활용하는 두 단계 흐름생산라인의 일정계획 (A Two-Machine Flowshop Scheduling with Outsourcing Strategy Allowed)

  • 이익선
    • 산업경영시스템학회지
    • /
    • 제37권3호
    • /
    • pp.113-121
    • /
    • 2014
  • This paper considers a scheduling problem in a two-machine flowshop with outsourcing strategy incorporated. The jobs can be either processed in the first machine or outsourced to outside subcontractors. This paper wants to determine which jobs to be processed in-house and which jobs to be outsourced. If any job is decided to be outsourced, then an additional outsourcing cost is charged The objective of this paper is to minimize the sum of scheduling cost and outsourcing cost under a budget constraint. At first this paper characterizes some solution properties, and then it derives solution procedure including DP (Dynamic Programming) and B&B (Branch-and-Bound) algorithms and a greedy-type heuristic. Finally the performance of the algorithms are evaluated with some numerical tests.

기계 가용성 제약을 고려한 흐름공정 상황하에서 Makespan을 최소화하기 위한 향상된 유전 알고리듬 (An Improved Genetic Algorithm to Minimize Makespan in Flowshop with Availability Constraints)

  • 이경화;정인재
    • 산업경영시스템학회지
    • /
    • 제30권1호
    • /
    • pp.115-121
    • /
    • 2007
  • In this paper, we study flowshop scheduling problems with availability constraints. In such problems, n jobs have to be scheduled on m machines sequentially under assumption that the machines are unavailable during some periods of planning horizon. The objective of the problem is to find a non-permutation schedule which minimizes the makespan. As a solution procedure, we propose an improved genetic algorithm which utilizes a look-ahead schedule generator to find good solutions in a reasonable time Computational experiments show that the proposed genetic algorithm outperforms the existing genetic algorithm.