1 |
Hariri, A. M. A., and Potts, C. N.; "A branch and bound algorithm for the two-stage assembly scheduling problem," European Journal of Operational Research, 103: 547-556, 1997
DOI
ScienceOn
|
2 |
Juhn, J., Sung, C. S., and Yoon, S. H.; "Analysis of heuristics for a two-stage assembly scheduling problem with component available time constraint," Submitted to Operations Research Letters for publication, 2006
|
3 |
Lin, B. M. T., Cheng, T. C. E., and Chou, A. S. C.; "Scheduling in an assembly-type production chain with batch transfer," OMEGA The International Journal of Management Science, 35(2):143-151, 2007
DOI
ScienceOn
|
4 |
Sun, X., Morizawa, K., and Nagasawa, H.; "Powerful heuristics to minimize makespan in fixed, 3-machine, assembly- type flowshop scheduling," European Journal of Operational Research, 146:498-516, 2003
DOI
ScienceOn
|
5 |
Kovalyov, M. Y., Potts, C. N., and Strusevich, V. A.; "Batching decisions for assembly production systems," European Journal of Operational Research, 157:620- 642, 2004
DOI
ScienceOn
|
6 |
Johnson, S. M.; "Optimal two- and three-stage production schedules with setup times included," Naval Research Logistics Quarterly, 1:61-68, 1954
DOI
|
7 |
전재호; "부품외주를 고려한 조립형 Flowshop 일정계획 문제 연구", 산업경영시스템학회지, 29(4):34-42, 2006
과학기술학회마을
|
8 |
Bertrand, J. W. M. and Muntslag, D. R.; "Production control in engineer-to-order firms," International Journal of Production Economics, 30-31:3-22, 1993
DOI
ScienceOn
|
9 |
Lee, C. -Y., Cheng, T. C. E., and Lin, B. M. T.; "Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem," Management Science, 39: 616-625, 1993
DOI
ScienceOn
|
10 |
Potts, C. N., Sevast'janov, S. V., Strusevich, V. A., Wassenhove, L. N. V., and Zwaneveld, C. M.; "The two-stage assembly scheduling problem:complexity and approximation," Operations Research, 43:346-355, 1995
DOI
ScienceOn
|
11 |
Tozkapan, A., Kirca, O., and Chung, C. -S.; "A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem," Computers & Operations Research, 30:309-320, 2003
DOI
ScienceOn
|
12 |
Chen, Z. -L., Hall, N. G.; "Supply Chain Scheduling: Conflict and Cooperation in Assembly Systems," Operations Research, 55(6):1072-1089, 2007
DOI
ScienceOn
|
13 |
Koulamas, C., and Kyparisis, G. J.; "The three-stage assembly flowshop scheduling problem," Computers & Operations Research, 28:689-704, 2001
DOI
ScienceOn
|