• 제목/요약/키워드: Flow Duration Curve

검색결과 154건 처리시간 0.021초

낙동강 유역의 수질관리를 위한 유역모델링 적용 연구 (Watershed Modeling Application for Receiving Water Quality Management in Nakdong River Basin)

  • 장재호;안종호
    • 한국물환경학회지
    • /
    • 제28권3호
    • /
    • pp.409-417
    • /
    • 2012
  • SWAT model was applied for the Nakdong River Basin to characterize water quality variability and assess the feasibility of using the load duration curve to water quality management. The basin was divided into 67 sub-basins considering various watershed environment, and rainfall runoff and pollutant loading were simulated based on 6 year measurements of meteo-hydrological data, discharge data of treatment plants, and water quality data (SS, T-N and T-P). The results demonstrate that non-point source loads during wet season increase by 80 ~ 95% of total loads. Although the rate of water flow governs the amount of SS that is transported to the main streams, nutrient concentrations are highly elevated during dry season by being concentrated. This phenomenon is more pronounced in the lower basin, receiving large amounts of urban point source discharges such as treated sewages. Also, the load duration curves (LDC) demonstrate dominant source problems based on the load exceedances, showing that SS concentrations are associated with the rainy season and nutrients, such as T-P, may be more concentrated at low flow and more diluted at higher flow. Overall, the LDC method could be used conveniently to assess watershed characteristics and pollutant loads in watershed scale.

생태.경관.친수.수질을 고려한 갑천 유역의 하천유지유량 산정 (Instream Flow Estimation for Gap-Stream Watershed Considering Ecosystem, Landscape, Water-friendly Environment and Water Quality)

  • 김태철;이덕주;문종필;이재면;구희진
    • 한국농공학회논문집
    • /
    • 제49권6호
    • /
    • pp.11-20
    • /
    • 2007
  • In order to make the way to determine the instream flow more practically, we have investigated many case studies and reviewed reports and papers. To validate instream flow level suggested by the case studies, DAWAST and HEC-RAS model were applied to the Gap-stream watershed in Daejeon city. Flow-duration analysis was performed both with the stream flow data gauged in the Indong, Boksu, and Hoeduck stations, and with the stream flow data estimated by the DAWAST model and the specific discharge method. Instream flow was determined among the flow-duration analysis, DAWAST, HEC-RAS model and mass balance approach. It was satisfied with various factors such as target water quality, water depth for eco-system and resorts, water surface width, flow velocity for landscape in dry season. The study suggested that the mean low flow could be replaced into the instream flow for the preliminary study because the instream flow considering ecosystem, landscape, water-friendly environment and water quality was generally close to the mean low flow.

부하지속곡선을 이용한 비점오염원 우선관리 지역 선정 및 관리목표 설정 연구 (Identifying Priority Area for Nonpoint Source Pollution Management and Setting up Load Reduction Goals using the Load Duration Curve)

  • 장선숙;지현서;김학관
    • 한국농공학회논문집
    • /
    • 제60권5호
    • /
    • pp.17-27
    • /
    • 2018
  • The objective of this study is to identify the priority area where the nonpoint source pollution (NPS) management is required and to set up the load reduction goals for the identified priority area. In this study, the load duration curve (LDC) was first developed using the flow and water quality data observed at 286 monitoring stations. Based on the developed LDC, the priority area for the NPS pollution management was determined using a three-step method. The 24 watersheds were finally identified as the priority areas for the NPS pollution management. The water quality parameters of concern in the priority areas were the total phosphorus or chemical oxygen demand. The load reduction goals, which were calculated as the percent reduction from current loading levels needed to meet target water quality, ranged from 67.9% to 97.2% during high flows and from 40.3% to 69.5% during moist conditions, respectively. The results from this study will help to identify critical watersheds for NPS program planning purposes. In addition, the process used in this study can be effectively applied to identify the pollutant of concern as well as the load reduction target.

낙동강수계 주요 지류의 수질특성변화 및 LDC를 이용한 목표수질 평가에 관한 연구 (A Study on the Variation of Water Quality and the Evaluation of Target Water Quality Using LDC in Major Tributaries of Nakdong River Basin)

  • 이상수;강준모;박혜림;강정훈;김신;김진필;김경훈
    • 한국물환경학회지
    • /
    • 제36권6호
    • /
    • pp.521-534
    • /
    • 2020
  • In this study, the variation of water quality was analyzed for six sites in major tributaries of the Nakdong River Basin. Standard-FDC (Flow Duration Curve) was developed using PM (Percentile Method), one of the statistical FDC estimation methods. The LDC (Load Duration Curve) was obtained using the developed FDC. The current method and the LDC evaluation method were compared and analyzed to evaluate the achievement of TWQ (Target Water Quality). Regarding the monthly flow rate variation, the five sites showed the distribution of the lowest flow rate between May and June, indicating a high probability of dry weathering of the streams. The variation of water quality confirmed the vulnerable timing of flow rate in each site, and it is therefore deemed necessary to plan to reduce T-P and TOC. A comparison and evaluation of TWQ showed that there was a difference between the TWQ values achieved by the two techniques. In addition, the margin ratio to the 50% excess ratio can be found in the LDC evaluation. The results of the LDC evaluation by section and by month showed whether or not the water quality was exceeded by flow conditions, along with the vulnerable sections and timing. Accordingly, it is judged that this method can be used for water quality management in TMDLs (Total Maximum Daily Loads).

Monte Carlo법에 의한 복합전력계통의 유효부하지속곡선 작성법 및 개발 및 신뢰도 해석 (Development of the ELDC and Reliability Analysis of Composite Power System by Monte Carlo Method)

  • 문승필;최재석;신흥교;이순영;송길영
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권5호
    • /
    • pp.508-516
    • /
    • 1999
  • This paper presents a method for constructing composite power system effective load duration curves(CMELDC) at load points by Monte Carlo method. The concept of effective load duration curves(ELDC) in power system planning is useful and important in both HLII. CMELDC can be obtained from convolution integral processing of the probability function of unsupplied power and the load duration curve at each load point. This concept is analogy to the ELEC in HLI. And, the reliability indices (LOLP, EDNS) for composite power system are evaluated using CMELDC. Differences in reliability levels between HLI and HLII come from considering with the uncertainty associated with the outages of the transmission system. It is expected that the CMELDC can be applied usefully to areas such as reliability evaluation, probabilistic production cost simulation and analytical outage cost assessment, etc. in HLII, DC load flow and Monte Carlo method are used for this study. The characteristics and effectiveness of thes methodology are illustrated by a case study of the IEEE RTS.

  • PDF

부하지속곡선과 유량-부하량 상관곡선을 이용한 낙동강 유역의 오염총량평가 (TMDL Evaluation of Nakdong River Basin Using Load Duration Curve and Streamflow-Load Rating Curve)

  • 손태석;주재승;박재범;신현석
    • 대한토목학회논문집
    • /
    • 제31권5B호
    • /
    • pp.475-481
    • /
    • 2011
  • 유역관리제도로써 시행 중인 현재의 수질오염총량관리제도의 기준유량은 과거 10년 평균저수량을 적용하고 있으며, 오염총량관리 이행평가는 단위유역별 목표수질을 만족할 수 있는 부하량에 대한 관리를 통해 시행되고 있다. 현재의 단순화되고 평균화된 개념의 기준유량을 이용한 단위유역별 부하량 할당과 관리는 목표수질 달성이라는 규제 기준을 달성하기 위한 관리측면에서의 편리성은 있으나 유역관리를 통한 유역 혹은 수체의 건전한 회복과 평가를 통해 문제점을 도출하고 해결하고자 하는 근본적인 유역관리의 역할은 미흡하다. 동일한 수질 농도를 유지, 관리하기 위해서는 매시간, 매일 변동하는 유량, 즉 전체유량을 고려한 부하량 관리를 통해서만 하천 생태계의 건강성을 유지할 수 있으며 이를 위해서는 전체 유량 규모를 고려해야 한다. 전체 유량 규모를 고려한다는 의미는 자연 현상인 강우-유출에 의해 다양하게 변동되는 유량과 인위적인 조절 유량 등을 고려한 오염총량관리 기준 설정과 이러한 양상을 반영한 과학적, 합리적인 평가가 가능하다는 의미이다. 이에 본 연구에서는 전체 유량 규모가 고려되는 유량-부하량 상관곡선을 이용한 오염총량평가 기법을 개발하고 이를 낙동강 수질오염총량관리 단위유역에의 실적용을 통해 문제점과 개선방향을 도출하고 본 기법의 국내 오염총량관리의 부하량 할당 및 이행평가에의 적용 가능성을 평가하였다.

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro Power Plants

  • Lee, Chul-Hyung;Park, Wan-Soon
    • Korean Journal of Hydrosciences
    • /
    • 제3권
    • /
    • pp.81-96
    • /
    • 1992
  • This study represents the methodology for feasibility analysis of small hydro power SHP plant. Cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP candidate site. The perfomance prediction model and construction cost estimation model for tunnel-type SHP plant were developed. Eight tunnel -type SHP candidate sites existing on Han-river were selected and surveyed for actual site reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrate with the lowest unit generation cost for tunel-type SHP candidate site were the flowrate concerming with between 20% and 30% of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual averageload factor, annual electricity production were estimated and discussed for eight surveyed SHP candidate sites.

  • PDF

자연하안조성을 위한 SWAT-K 모의치 기반 유황 분석 (Analysis of Flow Duration Based on SWAT-K Simulation for Construction of Natural Riparian)

  • 김남원;이정우;정일문;김지태
    • 한국환경과학회지
    • /
    • 제20권11호
    • /
    • pp.1457-1464
    • /
    • 2011
  • In this study, the method of estimating hydrologic information (water depth, submerged period etc.) on the proper selection of construction point and scale as well as vegetation type suggested for the design of natural riparian rehabilitation structure. Long-term comprehensive watershed model SWAT-K(Korea) was applied to this purpose. Flow duration analysis was conducted to analyze the hydrologic characteristics of Pyungchang watershed at which the 'bangtul' construction method was tested. For this purpose 20 years (1989-2008) rainfall runoff analysis was carried out. Based on the simulated daily streamflow data, flow duration curve was made to analyze the flow characteristics, and the water depth hydrograph was made to analyze the water depth distribution at the cross section. Finally, the information for the selection of proper vegetation according to the submerged period is suggested.

낙동강 오염총량관리 단위유역 유달율 경험공식 (Empirical Equation for Pollutant Loads Delivery Ratio in Nakdong River TMDL Unit Watersheds)

  • 김문성;신현석;박주현;김상단
    • 한국물환경학회지
    • /
    • 제25권4호
    • /
    • pp.580-588
    • /
    • 2009
  • In this study daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. Finally, multiple regression analysis is carried out to estimate empirical equations for pollutants delivery ratio. The results show that there is positive relation between the flow rates and delivery ratios, and the proposed empirical formulas for delivery ratio can predict well river pollutant loads.

회귀식을 이용한 황룡A 유역에서의 유황별 유달율 산정 (Estimation of Pollutant Loads Delivery Ratio by Flow Duration Using Regression Equation in Hwangryong A Watershed)

  • 정재운;윤광식;주석훈;최우영;이용운;류덕희;이수웅;장남익
    • 한국농공학회논문집
    • /
    • 제51권6호
    • /
    • pp.25-31
    • /
    • 2009
  • In this study, pollutant loads delivery ratio by flow duration in Hwangryoung A watershed was estimated. The delivery ratio was estimated with measured data by Ministry of Environment(MOE) and the regression equation based on geomorphic parameters. Eight day interval flow data measured by the MOE were converted to daily flow to calculate daily load and flow duration curve by correlating data of neighboring station which has daily flow data. Regression equation developed by previous study was tested to study watershed and found to be satisfactory. The delivery ratios estimated by two methods were compared. For the case of Biochemical oxygen demand(BOD), the delivery ratios of low flow condition were 7.6 and 15.5% by measured and regression equation, respectively. Also, the delivery ratios of Total phosphorus(T-P) for normal flow condition were 13.3 and 6.3% by measured and regression equation, respectively.