• Title/Summary/Keyword: Flood stage

Search Result 250, Processing Time 0.032 seconds

Analysis of Flood Inundation using WMS and RADARSAT SAR Image (WMS와 RADARSAT SAR 영상을 이용한 유역 침수구역 분석)

  • Kim, Kyung-Tak;Kim, Joo-Hun;Park, Jung-Sool;Byun, In-Kyung
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.3
    • /
    • pp.1-12
    • /
    • 2007
  • This study was conducted in order to analyze a flooded area by the overflow of a stream using hydrological and hydraulic models and to estimate the utility of the SAR satellite image by comparing a protected lowland inundation area with a past inundation area map. The research area selected for this study is Sapkyocheon, which was flooded in August 1999. The flood stage was analyzed to select an inundation area by applying flood events in August 1999. By importing analyzed flood stage data into TIN data of WMS, the inundation area of a protected lowland was selected and then compared with an flood hazard map of WAMIS. An inundation area is selected by the SAR satellite image in comparing the image of August 4, 1999 (inundation time) with the image of September 8, 2002 (after inundation). The method of selecting an inundation area with the hydraulic model of HEC-RAS can be used to select an inundation area of external overflow, but it has the limit of selecting an inundation area concerning the internal drainage. The method of using the SAR satellite image can complement the limit of an inundation area of an internal drainage but accuracy of inundation area depends on using SAR satellite image acquired at time of maximum depth.

  • PDF

Cause Analysis and Improvement Suggestion for Flood Accident in Dorimcheon - Focused on the Tripping and Isolation Accidents (도림천에서 발생한 고립 및 실족사고의 원인분석을 통한 개선방안 도출에 관한 연구)

  • Lee, Kyung-Su;Jeon, Jong-Hyeong;Kim, Tai-Hoon;Kim, Hyunju
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.25-36
    • /
    • 2021
  • This study analyzed the causes of flood accidents, such as isolation and lost footing accidents in Dorimcheon, to provide legal and institutional improvements. For cause analysis, Field Investigation, Stakeholder Interview, Report, manual, Law et al. Review, Analysis of water level change characteristics, automatic alarm issuance standard level analysis, and evacuation time according to river control were evaluated. Dorimcheon has the characteristics of a typical urban river, which is disadvantageous in terms of water control. In addition, the risk of flood accidents is high because the section where fatal accidents occur forms sharply curved channels. Tripping and isolation accidents occur in the floodplain watch and evacuation stage, which is the stage before the flood watch and warning is issued. Because floodplain evacuation is issued only when the water level rises to the floodplain, an immediate response according to the rainfall forecast is essential. Furthermore, considering that the rate of water level rise is up to 2.62 cm/min in Sillimgyo 3 and Gwanakdorimgyo, sufficient evacuation time is not secured after the floodplain watch is issued. Considering that fatal accidents occurred 0.46 m below the standard water level for the flood watch, complete control is very important, such as blocking the entry of rivers to prevent accidents. Based on these results, four improvement measures were suggested, and it is expected to contribute to the prevention of Tripping and Isolation Accidents occurring in rivers.

Analysis of Flood Control Effect by Applying the Connecting Channel in Estuary Area Including the Confluence of Two Rivers (2개의 하천이 합류하는 하구역에서의 연결수로 통수능에 따른 홍수위저감효과 분석)

  • Kim, Sooyoung;Kim, Hyung-Jun;Yoon, Kwang Seok
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.12
    • /
    • pp.1065-1075
    • /
    • 2015
  • In the estuary where the structure such as river-mouth weir has been installed, the flow is developed very complicatedly due to river water from upstream, tide of the sea and floodgate operation. Especially, if basin outlets more than one exists in one estuary, the boundary conditions will be significantly more complex form. Saemangeum(SMG) project area in Korea is the most typical example. There are Mankyung river and Dongjin river in upstream. The water of them inflows into SMG project area. In the downstream, river flow was drained from inland to sea over the SMG sea dike through the sluice. The connecting channel was located between Mankyung and Dongjin basins. It functions not only as transportation by ship in ordinary period but also as flood sharing by sending flood flow to each other in flood period. Therefore, in order to secure the safety against flood, it is very important to understand the flood sharing capacity for connecting channel. In this study, the flood control effect was analyzed using numerical simulation. Delft3D was used to numerical simulation and simulated period was set up with neap tide, in which the maximum flood stage occurred due to poor drainage. Actually, three connecting channels were designed in land use plan of the SMG Master Plan, but they were simplified to a single channel for conciseness of analysis in this study. According to the results of numerical analysis, the water level difference between two basins was increased and the maximum flood stage at dike sluice was also upraised depending on decrease of conveyance. And the velocity induced by same water level difference was decreased when the conveyance became smaller. In certain conveyance above, there was almost no flood control effect. Therefore, if the results of this study are considered for design of connecting channel, it will be expected to draw the optimal conveyance for minimizing dredging construction cost while maximizing the flood control effect.

Analysis on Looped Stage-Discharge Relation and Its Simulation using the Numerical Model (수치모형을 이용한 고리형 수위-유량 관계 분석)

  • Kim, Ji Sung;Kim, Won;Kim, Dong Gu;Kim, Chi Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1B
    • /
    • pp.1-9
    • /
    • 2009
  • This study is focused on the analysis of loop characteristics of stage-discharge relation which is widely used for the production of discharge data and the simulation of loop stage-discharge relation using the numerical model. Analysis of consecutive stage and discharge data at 3 points revealed that loop of stage-discharge relationship is very strong. This means that the existing single stage-discharge relation may include large amount of error. Various flood events are simulated in mainstream of Han river with one-dimensional numerical model. The calculated stage data are compared with measured data. Especially continuous field-flow measurements concurrently collected with an Acoustic Doppler Velocity Meter (ADVM) on Hangang bridge in the case of 2007 flood event are used to verify the model applicability of estimating flows in open channels. This comparison shows that numerical model is an accurate and reliable alternative for making the real stage-discharge relation. Simulation of stage-discharge relation by a numerical model at Paldang and Hangang bridge showed good agreements with measured one, so it may be possible to generate real loop stage-discharge relation with properly calibrated and verified numerical model. It can be concluded that results of this study can contribute to error analysis of conventional single stage-discharge relation and development of loop stage-discharge relation with numerical model.

A study on the measures to use Gunnam flood control reservoir through a reservoir simulation model (저수지 모의 모형을 통한 군남홍수조절지의 활용방안에 관한 연구)

  • Yang, Wonseok;Ahn, Jaehwang;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.6
    • /
    • pp.407-418
    • /
    • 2017
  • Due to geographical features of being close to DPRK (Democratic People's Republic of Korea), the Imjin River basin has difficulties in hydrological observation, and is vulnerable to unexpected flood occurrence. As a countermeasure, Gunnam Flood Control Reservoir construction was planned in 2005. Despite such a structural measure, damages by DPRK's illegal release continues to occur. Futhermore the Imjin River's flow has been decreased due to the effect of continuous drought in the Korean Peninsula since 2012 and DPRK's unilateral storage of water. A new operation method is derived for the Gunnam Flood Control Reservoir in order to cope with drought damages on the Imjin River basin and to ensure efficient response time upon flooding. The operation method maintaining Gunnam Flood Control Reservoir's water level by raising from EL.23.0 m to EL.31.0 m during the flood season for securing reservoir capacity enables to secure additional $14,000,000m^3$ water compared to the existing operation methods. The operation method to store inflow by controlling release to $250m^3/s$ in the early stage of flood has increased 2.66% on average in terms of detention effect of reservoir compared to the existing operation methods. The method enables to secure 19 hours to prepare flood compared to the existing methods.

Discharge Computation from Float Measurement in Vegetated Stream (부자 측정 시 식생을 고려한 유량산정에 관한 연구)

  • Lee, Tae Hee;Jung, Sung Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.2
    • /
    • pp.307-316
    • /
    • 2019
  • Development of vegetation in stream channel increases resistance to flow, resulting in increase in river stage upon flood and affecting change in stage-discharge relationship. Vegetation revealed in stream by water level reaching a peak and then declined upon flood is mostly found as prone. Taking an account of flow distribution with the number of vegetation, prone vegetation layer might be at height where discharge rate is zero (0) (Stephan and Guthnecht, 2002). However, there is a tendency that flow rate is overestimated when applying the height of river bed to flow area with no consideration of the height of vegetation layer in flow rate by float measurement. In this study, reliable flow measurement in stream with vegetation was calculated by measuring the height of vegetation layer after flood and excluding the vegetation layer-projected area from the flow area. The result showed the minimum 4.34 % to maximum 10.82 % of flow deviation depending on the scale of discharge. Accordingly, reliable velocity-area methods would be determined if vegetation layer-projected area in stream is considered in flow rate estimation using the flow area during the flood.

Urban Runoff Network Flow Velocity Monitoring System Using Ubiquitous Technique and GIS (Ubiquitous 기술과 GIS를 이용한 도시배수관망 유속측정 시스템 개발)

  • Choi, Changwon;Yi, Jaeeung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5B
    • /
    • pp.479-486
    • /
    • 2010
  • Reliable hydrologic data acquisition is the basic and essential requirement for efficient water management. Especially the acquisition of various stream data in a certain location is very important to construct on alarm system to response an urban flood which occurs frequently due to the effect of climate change. Although the frequency of stream inundation flood occurrence becomes low owing to the consistent stream improvement, the urban flood due to the drainage system problems such as deterioration and bad management occurs continuously. The consistent management and current status understanding of the urban drainage system is essential to reduce the urban flood. The purpose of this study is to develop the urban runoff network flow velocity monitoring system which has the capability of collecting stream data whenever, wherever and to whomever without expert knowledge using Code Division Multiple Access technique and Bluetooth near-distance wireless communication technique. The urban runoff network flow velocity monitoring system consists of three stages. In the first stage, the stream information obtained by using ubiquitous floater is transferred to the server computer. In the second stage, the current state of the urban drainage system is assessed through the server computer. In the last stage, the information is provided to the user through a GUI. As a result of applying, the developed urban runoff network flow velocity monitoring system to Woncheon-Stream in Suwon, the information necessary for urban drainage management can be managed in real time.

Parameter Calibration of Storage Function Model and Flood Forecasting (2) Comparative Study on the Flood Forecasting Methods (저류함수모형의 매개변수 보정과 홍수예측 (2) 홍수예측방법의 비교 연구)

  • Kim, Bum Jun;Song, Jae Hyun;Kim, Hung Soo;Hong, Il Pyo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1B
    • /
    • pp.39-50
    • /
    • 2006
  • The flood control offices of main rivers have used a storage function model to forecast flood stage in Korea and studies of flood forecasting actively have been done even now. On this account, the storage function model, which is used in flood control office, regression models and artificial neural network model are applied into flood forecasting of study watershed in this paper. The result obtained by each method are analyzed for the comparative study. In case of storage function model, this paper uses the representative parameters of the flood control offices and the optimized parameters. Regression coefficients are obtained by regression analysis and neural network is trained by backpropagation algorithm after selecting four events between 1995 to 2001. As a result of this study, it is shown that the optimized parameters are superior to the representative parameters for flood forecasting. The results obtained by multiple, robust, stepwise regression analysis, one of the regression methods, show very good forecasts. Although the artificial neural network model shows less exact results than the regression model, it can be efficient way to produce a good forecasts.

A Study on the Stage-Discharge Relationship in the Lower Reach of the Sumjin River (섬진강 하류부에서의 수위-유량관계에 관한 연구)

  • 이재형;황만하
    • Water for future
    • /
    • v.27 no.4
    • /
    • pp.115-121
    • /
    • 1994
  • In tidal rivers, the water level is affected by a tidal wave. The latter creates higher flood stages that enlarge the flood plain areas and increase potential damages. In such rivers, the water level is not solely a function of the flow discharge but rather a joint function of both the discharge and tidal phenomena. This paper attempts at formulating a relation between tital water level and river flow discharge that can be used for the predictions of water level in coastal rivers. Numerical applications were performed on the HaDong and the SongJung Station in Sumjin river with satisfactory results. The correlation coefficients between the tide(M) and the water stage(Z) at the HaDong Station is 0.558, and SongJung is 0.016. From this result, the water level at HaDong Station is greatly affected by a tide, whereas songJung is not.

  • PDF

An Evaluation of River Discharge Estimates in a Junction with Backwater effect using Interpolated Hydraulic Performance Graph (HPG로 산정한 합류부 배수영향 구간의 유량 평가)

  • Kim, Ji-Sung;Kim, Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.6
    • /
    • pp.831-838
    • /
    • 2018
  • This paper presents a method to estimate the flow discharge in a backwater affected river junction. First, unsteady HEC-RAS model was simulated and calibrated using 2 recent real flood and then HPG (Hydraulic Performance Graph) was created by plotting the relationship between upstream and downstream stages and discharge in the reach and performing kriging interpolation. During a flood, the discharge through the reach can be estimated based on the stages at its ends and the developed HPG. These discharge data were in good agreement with the automatic discharge measurements such as ADVM. This study could provide an economical and practical method for estimating discharge in a junction with a high hysteresis of stage-discharge relationships.