• Title/Summary/Keyword: Flood level

Search Result 756, Processing Time 0.026 seconds

Relational expression of rainfall intensity by the water level fluctuate in the mountain region river of Gang won-do (강원도 산간 지역 하천을 대상으로 한 강우강도에 따른 수위 변동 관계식 작성)

  • Choi, Han-Kuy;Kong, Ji-Hyuk;Lee, Yik-Sang;Cho, Hyun-Jeung;Park, Je-Wan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.154-159
    • /
    • 2011
  • As the need for predicting the flood stage of river from torrential downpouring caused by climate change is increasingly emphasized, the study, centered on the area of Gangwon-do Inje-gun and Jeongseon-gun of local river, is to develop peak water level regression equation by rainfall. Through the correlation between rainfall and peak water level, it is confirmed that rainfall according to duration and peak water level have a high correlation coefficient. Based on this, a relational expression of rainfall and peak water level is verified and then the adequacy of the calculated expression is analyzed and the result shows that a very accurate prediction is not easy to achieve but a rough prediction of the change of water level at each point is possible.

  • PDF

Coupled Operation of the Lake Youngsan, Yeongam and Kumho for the Flood Stage Control in the Downstream of the Youngsan River (영산강 하류부 홍수위 조절을 위한 영산호-영암호-금호호 연계운영)

  • Kim, Dae Geun;Kim, Dong Ok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3B
    • /
    • pp.277-284
    • /
    • 2010
  • To examine how the width of connecting channels, the width of the Kumho lock gate, and the opening/shutting criteria of the Yeongam connecting channel lock gate affect the flood stage of Lake Yeongsan, Lake Yeongam, and Lake Kumho, located in the lower reaches of the Yeongsan River, unsteady flood routing was performed by connecting the three lakes into a single interlinked system. The coupled operation of the three lakes was found to have little effect when the widths of the lock gates and the Yeongam and Kumho connecting channels are set at the current level. The most effective way to lower the water level in Lake Yeongsan was to widen the Yeongam connecting channel, but this caused the water level in Lake Yeongam to rise. To lower the increased water level in Lake Yeongam by utilizing the water storage capacity of Lake Kumho, it was necessary to widen both the Kumho lock gate and the Kumho connecting channel. It was found that the optimum opening/shutting criterion for the Yeongam connecting channel lock gate is approximately EL.(+)0.8 m under the simulated conditions used in this study and the criterion allows of maximal lowering of the water levels in Lake Yeongam and Lake Kumho while maintaining a near-constant water level in Lake Yeongsan.

The Analysis of Hydrological Property with Curved-channel Type (하도만곡형상에 따른 수리특성분석)

  • Ahn, Seung-Seop;Lee, Sang-Il;Park, Dong-Il;Kim, Wi-Seok
    • Journal of Environmental Science International
    • /
    • v.20 no.10
    • /
    • pp.1309-1317
    • /
    • 2011
  • This study selected 6 river reach, which have various curved-channel, included in an object of study as making the Nakdong River, which is a real nature river, as a point of an object of study by using SMS RMA-2 model, a 2D numerical analysis model, and applied project flood and analyzed and examined characteristic of hydrological property and super-elevation, which includes characteristic of the velocity of a moving fluid. As a result, in a river reach, whose width is wide, angle of curved-channel has impact on the velocity of a moving fluid of inside of curved-channel and in a river reach, whose width is narrow, the radius of curvature and width of the river have impact on the velocity of a moving fluid of inside of curved-channel. Also it found out that the ratio of reduction in water-level of inside of curved-channel is more bigger than ratio of increasing in water-level of outside of curved-channel when project flood is increasing and angle of curve is increasing. Based on this, this study would be used as a expectation of danger and preliminary data in planning real river or a business, that creates an environment.

Vital Area Identification of Nuclear Facilities by using PSA (PSA기법을 이용한 원자력시설의 핵심구역 파악)

  • Lee, Yoon-Hwan;Jung, Woo-Sik;Hwang, Mee-Jeong;Yang, Joon-Eon
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.5
    • /
    • pp.63-68
    • /
    • 2009
  • The urgent VAI method development is required since "The Act of Physical Protection and Radiological Emergency that is established in 2003" requires an evaluation of physical threats in nuclear facilities and an establishment of physical protection in Korea. The VAI methodology is developed to (1) make a sabotage model by reusing existing fire/flooding/pipe break PSA models, (2) calculate MCSs and TEPSs, (3) select the most cost-effective TEPS among many TEPSs, (4) determine the compartments in a selected TEPS as vital areas, and (5) provide protection measures to the vital areas. The developed VAI methodology contains four steps, (1) collecting the internal level 1 PSA model and information, (2) developing the fire/flood/pipe rupture model based on level 1 PSA model, (3) integrating the fire/flood/pipe rupture model into the sabotage model by JSTAR, and (4) calculating MCSs and TEPS. The VAT process is performed through the VIPEX that was developed in KAERI. This methodology serves as a guide to develop a sabotage model by using existing internal and external PSA models. When this methodology is used to identify the vital areas, it provides the most cost-effective method to save the VAI and physical protection costs.

Unsteady Flow Model Including a Dam Operation Rule for Flood Control as Internal Boundary Condition (홍수시 댐 운영방안을 내부 경계조건으로 포함하는 부정류 계산모형)

  • Yu, Myoung-Kwan;Jun, Kyung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.12
    • /
    • pp.1043-1054
    • /
    • 2004
  • An unsteady flow model for channel network including various internal boundaries if developed. It is a multiply-connected network model based on the Preissmann's four-point scheme and the Newton-Raphson method, where looped double-sweep algorithm is used. The model is capable of simulating flow through hydraulic structures such as dams and submerged weirs. It can also simulate automatic reservoir operation method (Auto ROM) for flood control, that is to maintain a target water level, by incorporating the strategy to the unsteady flow model as internal boundary condition. The model is applied to the Han River system that includes the downstream reaches of Choongju dam and Hwacheon dam as well as the downstream reach of the Paldang dam. Roughness coefficient for the downstream reach of Choongju dam is estimated. Automatic ROM is presumed for the Paldang, Chungpyung, Euiam, and Choonchun dams. The model is tested using historical flood records, and the flood control strategy is successfully simulated.

An Optimal Operation of Multi-Reservoirs for Flood Control by Incremental DP (Incremental DP에 의한 홍수시 댐군의 연계운영)

  • Lee, Jae-Hyeong;Lee, Gil-Seong;Jeong, Dong-Guk
    • Water for future
    • /
    • v.25 no.2
    • /
    • pp.47-60
    • /
    • 1992
  • An optimal operation model for flood control of multi-reservoirs, Hwacheon and Soyanggang, located in the north Han River basin is developed by using the Incremental DP. The objective function is to minimize the peak flow at the confluence point, of Euam dam, and the hydraulic and hydrologic constraints are established by considering the related laws as to the operation of dam in flood season, each reservoir and channel characteristics. In particular, the final elevations of each reservoir are induced to the conservation pool level in order to prepare for the secondary flood. In addition, the results of this model, simulation results and the single reservoir operation by DP are compared in terms of control and utility efficiencies, and also the peak flows at the confluence point for floods with various return periods are compared with the results of simulation suing feedback control. as the results, the control and utility effciencies are more or less low in contrast with the results of simulation and the single reservoir operation by DP, and the peak flows at confluence point are high because of terminal condition of reservoir storage.

  • PDF

Flood Damage Estimation causing Backwater due to the Blockage by Debris in the Bridges (교량에 집적된 유송잡물의 배수영향에 의한 홍수피해 분석)

  • Kim, Soo-Jun;Chung, Jae-Hak;Lee, Jong-Seol;Kim, Ji-Tae
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.7 no.4
    • /
    • pp.59-66
    • /
    • 2007
  • The bridge crossing river is the one of the major factors causing backwater level rising. Furthermore, the bridges in the mountainous areas increase the flood damage in the upstream of the bridge due to the blockage by debris. In this research, the effects of debris to the magnitude of flood damage in the study river basin were simulated by using HEC-RAS and HEC-GeoRAS models. With assumption that the backwater caused by debris blocking the space between bridge piers is the only factor causing inundation, the unsteady flow simulation was carried out with various case studies. The potential inundation area with the overflow locations and volumes could be estimated as the results of simulation. However, the simulation results also reveal the limitations of inaccurate estimation of inundation area and depth. To overcome these hindrances, DEM and satellite images were applied to the simulation. By readjusting the inundation area using digital maps and satellite images and calibrating overflow volume and depth using DEM, the accuracy of simulation could be increased resulting more accurate flood damage estimation.

Evaluation of River Flood Stability after River Restoration (하천 복원 후의 홍수위 안정성 검토)

  • Kim, Byeong-Chan;Lee, Jong-Seok
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.10
    • /
    • pp.417-426
    • /
    • 2009
  • The eco-friendly river restoration issue has been increased and the importance of the vegetation along the river banks has been understood with its scenery and significant role. However vegetation reduces the stream flow cross section and brings negative effects such as increase of water flow resistance and decreases of river flow velocity. In this study, the method to choose roughness coefficient is studied in the sudden changed hydraulic characteristics by river restoration. Using the HEC-RAS model and the two-dimensional vertical analysis method, Yangjae stream was calculated that the roughness coefficient of the main channel is 0.011~0.159 after river restoration, 0.031 without vegetation on the flood plain, and 0.034~0.506 with vegetation on the flood plain. The level of water in the river is predicted to rise 0.13~0.34m at 30% of vegetation density increase.

Application of WMS Model for Runoff Analysis of Miho Stream Basin (미호천 유역의 유출해석을 위한 WMS 모형의 적용)

  • Ahn, Sang-Jin;Lee, Moo-Kyeong;Jun, Kye-Won;Yeon, In-Sung
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.11
    • /
    • pp.929-938
    • /
    • 2004
  • In this study, Miho stream basin(Seokhwa water level gauging station) In Geum river, Flood control main station of Geum River Flood Control Office, is selected. Hydrologic topographical informations are calculated using WMS which is hydrologic analysis software coupled with GIS Method, and flood analysis is accomplished by HEC-1 included In WMS. To calculate the effective rainfall CN values of SCS are used. Clark, Snyder and SCS methods are selected respectively to derive unit hydrograph. This study shows the applicability of GIS techniques to runoff simulation in ungauged basin by comparing with actual measured flood hydrograph. As a results, Snyder(Tulsa) method and Clark (Herby) method is suitable to Miho stream basin. But Snyder(Tulsa) method is suitable more than Clark(Herby) method. And according to the degree of urbanization, the peak discharge has increased and the peak time has tended to decrease.

Reservoir Management in Flood Period with Chance Constrained LP (위험도제약(危險度制約) 선형계획법(線形計劃法)에 위한 홍수기(洪水期) 저수지운영(貯水池運營))

  • Lee, Kil Seong;Kang, Bu Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.3
    • /
    • pp.139-151
    • /
    • 1992
  • A reservoir operation model was established under the varying restricted water level(r.w.l.) subject to the inflow distributions in flood period. The optimization model consists of 2 sub-models. One model minimizes deviations of releases from the expected release and the other minimizes capacity requirement for flood control. In order to make deterministic equivalents, the inflow distribution of reservoir is assumed to be 2-parameter Lognormal, and its parameters are estimated by the maximum likelihood method. The model is applied to joint operation of Soyang and Chungju dam. The results show that Soyang was designed for larger flood event than that for Chungju. The operation under the varying r.w.l. turns out to be more effective than one under the uniform r.w.l. Such effect is more obvious at Chungju compared with Soyang. Release pattern shows diminishing and delaying effect in a period of high inflows and larger discharges than actual in a period of low inflows.