• Title/Summary/Keyword: Flood level

Search Result 756, Processing Time 0.034 seconds

Analysis of Channel Changes in Mountain Streams Due to Typhoon Hinnamnor Flood - A Case Study on Shingwangcheon and Naengcheon Streams in Pohang - (태풍 힌남노 홍수로 인한 산지 중소하천의 하도 변화 분석 - 포항 신광천 및 냉천을 사례로 -)

  • Chanjoo Lee;Seong Gi An;Eun-Kyung Jang
    • Ecology and Resilient Infrastructure
    • /
    • v.10 no.4
    • /
    • pp.97-106
    • /
    • 2023
  • This study analyzed morphological changes in the Singwangcheon and Naengcheon streams in Pohang caused by flooding due to Typhoon Hinnamnor. Analysis of the changes in river channel area from the past to recent times using aerial photos and drone-taken images showed that the river width had gradually decreased since the 1960s. However, after the flood, the river width increased again. Changes in the river cross-section before and after the flood show that a large amount of coarse sediment was deposited inside the river bend while the outer bank was eroded. The water levels calculated using HEC-RAS for the pre-flood cross-section based on the flood frequency discharges and estimated discharge from Oer Reservoir were significantly lower than the observed water level, which means that the cross-sectional change was not considered. The results of this study suggest that it is necessary to consider cross-sectional changes due to sediment transport when estimating the flood level of small and medium-sized mountain streams, and it is needed to investigate the geomorphic changes after floods.

Urban Inundation Analysis by Applying with GIS (GIS를 이용한 도시지역 침수해석)

  • Lee, Chang-Hee;Han, Kun-Yeun;Kim, Ji-Sung
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.9 no.2
    • /
    • pp.115-126
    • /
    • 2006
  • The purpose of this study is to develop an urban inundation model using GIS(geographic information system). The model is combining a storm sewer system model and a overland-flow model for the estimation inundation depth in urban area caused by the surcharge of storm sewers. SWMM(storm water management model) was employed to resolve the storm sewer flow and to provide the overflow hydrographs caused by the failure of a drainage system due to the shortage of drainage capacity. The level-pool overland-flow model and DEM based overland-flow model were used to calculate the detail inundation zones and depths due to the surcharge on overland surface. The simulation results can help the decision preventing flood damages by redesigning and enlarging the capacities of storm sewer systems in the inundation-prone areas. The model can also be applied to make the potential inundation area map and establish flood-mitigation measures as a part of the decision support system for flood control authority.

  • PDF

Water Management Program for TM/TC (물관리자동화시스템(TM/TC)을 위한 물관리프로그램 개발)

  • go, Gwang Don;Lim, Chang Young;Kwak, Yeong Cheol
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.790-793
    • /
    • 2004
  • TM/TC system is composed of control center, reservoirs, pumping stations and twelve canal systems. For this system we developed water management program which includes flood forecast program, drought reduction program, irrigation scheduling program and database program. With these program we expect that operators improve the irrigation efficiencies of the irrigation systems due to the timely irrigation on a right place, in a proper quantity and refute tile cost of maintenance and reduce flood and drought damages. In agricultural engineering respect, the databases including water level, rainfall, the amount of flowing can be useful to the researcher who make a study of hydrology and hydraulics in . rural area. Water management program records all of the TM/TC data to MDB format file per 10 minutes.

  • PDF

Improvement of Flood Disaster Mitigation on Long-term Development Plan (장기개발계획상의 방재제도 개선)

  • 고영찬;오남선
    • Journal of Korean Port Research
    • /
    • v.15 no.1
    • /
    • pp.107-119
    • /
    • 2001
  • Disaster mitigation, especially as a concept similar to damage mitigation caused by heavy rainfalls and flood is closely related to long-term development plan. This plan of an harbor area where is located in lower region is established and carried under consideration of disaster mitigation concept such as internal drainage and so on. Flood damage is somewhat predictable in accordance with height, stream and rainfall characteristics of the region. Therefore it is necessary to establish national and urban plan under consideration of this fact. But this consideration of existing regulation and institution is insufficient and improvement of regulation and institution is needed. This consideration of disaster mitigation fields is regulated declaratively and inclusively in national plan which is established in broad region, and specifically and detailedly in urban plan which is established in narrow region. The program to improve regulation and institution is proposed in order to consider disaster mitigation fields as a level of this plan.

  • PDF

Study on the Dividing Capacity of Appropriate Sub-basin for Runoff Analysis (하천유역의 유출해석을 위한 적정소유역 분할수에 관한 연구)

  • Ahn, Seung-Seop;Jung, Do-Joon;Lee, Hyo-Jung;Lee, Jeung-Seok
    • Journal of Environmental Science International
    • /
    • v.17 no.2
    • /
    • pp.239-248
    • /
    • 2008
  • The purpose of this study is to examine appropriate sub-basin division numbers that best reflect the hydrological characteristics of the basin so as to propose the criterion for dividing the sub-basin in analyzing flood runoff in the future. The characteristics of flood runoff variations were based on the WMS HEC-1 model, and the area in the upstream of the Dongbyeon water level observatory and the Geum-ho water level observatory was chosen for analysis, and examined the characteristics of the changes in flood runoff. First of all, in the targeted basin, if the sub-basin division number was 4 (that is, the area of the divided sub-basin was about 25% of the total area). Next, as the sub-basin division number gradually increased, the peak rate of runoff increased as well, and in case the sub-basin was not divided, the peak rate of runoff occurred at the earliest time. Given these results, the spatial change characteristics will be best reflected when the sub-basin is divided for analysis of flood runoff in such a way that the area of the divided sub-basin is about 25% of the total area of the basin. However, as these results are based on a limited number (4) of storms, more storm events and other basins need to be included in the review of the sub-basin division methodology.

Identification of Expanding the Usability of the Water Resources in Hwacheon Dam System Due to the Flood Surcharging Effects of Peace Dam (평화의 댐 흥수지체 효과에 따른 화천댐 계통 이수 능력의 증대에 대한 검정)

  • Yu, Ju-Hwan;Park, Chang-Geun;Jo, Hyo-Seop
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.6
    • /
    • pp.617-625
    • /
    • 2001
  • Peace dam constructed against the water attack had stopped in the first step, linked with Hwacheon dam through bypass tunnels and had an effect of flood surcharging in its pocket on Hwacheon dam downstream. To study the utility of Peace dam, the flood control effects of Peace dam and the restricted water level (RWL) in Hwacheon dam were reviewed and identified with operating Hwacheon dam system. Analysing the results the ideas of expanding the usability of the water resources in Hwacheon dam system were suggested. To do that, the criteria and the model of reservoir operation were established frist and the optimization of the operation have done. Based on the results the performance of the optimization was evaluated as an reference coefficient with relative value of the registered data to the optimized. And examining several alternatives for the RWL in Hwacheon reservoir operation made more feasible RWL suggested. And its economic benefit was also reckoned.

  • PDF

Three-dimensional Numerical Analysis of Dam-break Waves on a Fixed and Movable Bed (고정상 및 이동상 수로에서 댐 붕괴파의 3차원 수치해석)

  • Kim, Dae Geun;Hwang, Gun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4B
    • /
    • pp.333-341
    • /
    • 2011
  • This study analyzed the propagation of dam-break waves in an area directly downstream of a dam by using 3D numerical modeling with RANS as the governing equation. In this area, the flow of the waves has three dimensional characteristics due to the instantaneous dam break. In particular, the dam-break flows are characterized by a highly unsteady and discontinuous flow, a mixture of the sharp flood waves and their reflected waves, a mixture of subcritical and supercritical flow, and propagation in a dry and movable bed. 2D numerical modeling, in which the governing equation is the shallow water equation, was regarded as restricted in terms of dealing with the sharp fluctuation of the water level at the dam-breaking point and water level vibration at the reservoir. However, in this 30 analysis of flood wave propagation due to partial dam breaking and dam-break in channels with $90^{\circ}$ bend, those phenomena were properly simulated. In addition, the flood wave and bed profiles in a movable bed with a flat/upward/downward bed step, which represents channel aggradation or degradation, was also successfully simulated.

Flood Water Level Changes Analyses for the Construction of a Small Dam -Focused on the Geum River Reach in Sejong City- (수위유지시설 설치에 따른 홍수위 변화 해석 - 세종시 금강 구간을 중심으로 -)

  • Jeong, Sang-Man;Park, Chan-Seong;Lee, Joo-Heon;Shin, Kwang-Seob
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.2
    • /
    • pp.59-68
    • /
    • 2009
  • Currently, building a small dam located 1.16 km downstream from Geumnam Bridge is being considered in order to improve the riverine scenery of the site for Sejong City and to create a hydrophilic space. The purpose of this research is to present the appropriate dimensions of a small dam by reviewing the flood control reliability of the Geum River after the small dam is built. To establish this purpose, changes in the flood water level were compared and analyzed by changing the installation height of a small dam using 1D and 2D models. 1D HEC-RAS and 2D FESWMS models were applied to perform the numerical analysis of the reach. The results showed that flood control reliability was guaranteed when the installation height of the small dam was 5 meters or lower. From the 2D model, a more accurate result can be developed because the model could provide a two dimensional numerical analysis. The results can be used to determine the appropriate dimensions of a small dam for Sejong City.

Failure Probability Analysis of Concrete Cofferdam Considering the Overflow in Flood Season (홍수시 월류를 고려한 콘크리트 가물막이댐의 파괴확률 산정)

  • Hong, Won Pyo;Song, Chang Geun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.5
    • /
    • pp.30-38
    • /
    • 2020
  • In order to construct a dam, the diversion facility such as cofferdam and a diversion tunnel should be installed in advance. And size of a cofferdam depends on type of a main dam. According to the Korea Dam Design Standard, if the main dam is a concrete dam, design flood of the cofferdam is 1~2 years flood frequency. This means that overflow of the cofferdam occurs one time for 1 or 2 years, therefore, stability of the cofferdam should be secured against any overflow problem. In this study, failure probability analysis for the concrete cofferdam is performed considering the overflow. First of all, limit state function of the concrete cofferdam is defined for overturning, sliding and base pressure, and upstream water levels are set as El. 501 m, El. 503 m, El. 505 m, El. 507 m. Also, after literature investigation research, probabilistic characteristics of various random variables are determined, the failure probability of the concrete cofferdam is calculated using the Monte Carlo Simulation. As a result of the analysis, when the upstream water level rises, it means overflow, the failure probability increases rapidly. In particular, the failure probability is largest in case of flood loading condition. It is considered that the high upstream water level causes increase of the upstream water pressure and the uplift pressure on the foundation. In addition, among the overturning, the sliding and the base pressure, the overturing is the major cause for the cofferdam failure considering the overflow.

Analyzing on the cause of downstream submergence damages in rural areas with dam discharge using dam management data

  • Sung-Wook Yun;Chan Yu
    • Korean Journal of Agricultural Science
    • /
    • v.50 no.3
    • /
    • pp.331-347
    • /
    • 2023
  • The downstream submergence damages caused during the flood season in 2020, around the Yongdam-dam and five other sites, were analyzed using related dam management data. Hourly- and daily-data were collected from public national websites and to conduct various analyses, such as autocorrelation, partial-correlation, stationary test, trend test, Granger causality, Rescaled analysis, and principal statistical analysis, to find the cause of the catastrophic damages in 2020. The damage surrounding the Yongdam-dam in 2020 was confirmed to be caused by mis-management of the flood season water level. A similar pattern was found downstream of the Namgang- and Hapcheon-dams, however the damage caused via discharges from these dams in same year is uncertain. Conversely, a different pattern from that of the Yongdam-dam was seen in the areas downstream of Sumjingang- and Daecheongdams, in which the management of the flood season water level appeared appropriate and hence, the damages is assumed to have occurred via the increase in the absolute discharge amount from the dams and flood control capacity leakage of the downstream river. Because of the non-stationarity of the management data, we adapted the wavelet transform analysis to observe the behaviors of the dam management data in detail. Based on the results, an increasing trend in the discharge amount was observed from the dams after the year 2000, which may serve as a warning about similar trends in the future. Therefore, additional and continuous research on downstream safety against dam discharges is necessary.