• Title/Summary/Keyword: Flood flow rate

Search Result 130, Processing Time 0.03 seconds

준설퇴적토의 현장처분시설(Confined Disposal Facility) 설계

  • 홍준식;안재환;기소정;지재성;배우근
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2002.09a
    • /
    • pp.355-358
    • /
    • 2002
  • A sediments are Integral called as gravel, sand, clay, mineral materials which are settling in bottom layer of reservoir, stream, and oceans from land. In practical problems relations of sediments are flood by decreed of flow capacity and down of water quality. Dredged sediments are composed with constructed material and variety of pollutant compounds. Therefore, it is very much of cost effects in nationally, if development for use of constructed material separated only constructed material within sediments. And it will be continue to the dredge operation of stream sediment for retrofit of water environment and sustainable's after the years. The following results could be obtained : In case of high concentration sediments, sample for design of CDF was shown property of flocculent settling. Assuming that average inflow rate is 1, 000㎥/hr, mean residence time( $T_{d}$), average ponding depth( $H_{pd}$ ), and design surface area for flocculent settling( $A_{df}$ ) were 5 hr, 0.6m, and 15, 750 $m^2$ respectivelyrespectivelyy

  • PDF

Feasibility Analysis on the Application of Eco-friendly Prefabricated Rainwater Detention System in Grit Chamber and Permanent Pond by the Two-dimensional Diffusion-wave Analysis Model (2차원 확산파 해석모형을 통한 침사지겸 저류지의 친환경 조립식 빗물침투저류시설 적용 타당성 분석)

  • Kim, Ho-jin;Choi, Hee-Yong;Lee, Tae-Gyu;Choi, Hyeonggil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.185-186
    • /
    • 2022
  • In this study, a numerical analysis was conducted using a two-dimensional diffusion-wave analysis model to analyze the validity about the application of eco-friendly prefabricated rainwater detention system in grit chamber and permanent pond. As a result of the analysis, it is confirmed that the flood prevention effect, such as a decrease in peak flow rate and a delay in peak time, is excellent, so it is considered reasonable to apply eco-friendly prefabricated rainwater detention system in grit chamber and permanent pond.

  • PDF

Development of Stream Width and Bed-slope Estimation Equations for Preparing Data for Distributed Storm Runoff Model (분포형 강우-유출모형의 하도자료 구축을 위한 하폭 및 하상경사 산정공식 개발)

  • Jung, In-Kyun;Park, Jong-Yoon;Joh, Hyung-Kyung;Lee, Ji-Wan;Kim, Seong-Joon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.4
    • /
    • pp.1-10
    • /
    • 2010
  • In this study, two estimation equations for preparing stream data for distributed storm runoff model were developed by analyzing the nonlinear relation between upstream flow-length and stream width, and between upstream flow-length and stream bed-slope. The equations for stream cell were tested in Chungjudam watershed (6,661 $km^2$) using KIMSTORM. Six storm events occurring between 2003 and 2008 were selected for the model calibration and verification before the test of equations. The average values of the Nash-Sutcliffe model efficiency (ME), the volume conservation index (VCI), the relative error of peak runoff rate (EQp), and the difference of time to peak runoff (DTp) were 0.929, 1.035, 0.037, and -0.406 hr for the calibrated four storm events and 0.956, 0.939, 0.055, and 0.729 hr for the two verified storm events respectively. The estimation equations were tested to the storm events, and compared the flood hydrograph. The test result showed that the estimation equation of stream width reduced the peak runoff and delaying the time to peak runoff, and the estimation equation of stream bed-slope showed the opposite results.

Effects of the water level reduction and the flow distribution according to change of the side weir location in detention reservoir (홍수조절지 횡월류위어의 위치 변화에 따른 수위 저감 및 유량 분담 효과)

  • Seong, Hoje;Park, Inhwan;Rhee, Dong Sop
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.7
    • /
    • pp.555-564
    • /
    • 2018
  • The detention reservoir is a hydraulic structure that constructs a levee on the inland of river and sets up side weir in a section of the levee, and this facility stores a part of the flood volume in case of a flood event over a certain scale. In order to optimize the operation of detention reservoir, it is necessary to review the linkage with existing facilities in the river. In this study, the effect of water level reduction and the flow distribution was analyzed according to the location of the side weir in the detention reservoir considering the run-of-the-river gate. Two radial gates were installed in the experimental channel, and the water level in channel and the overflow of weir were measured by moving the location of the side weir upstream from the gate. As a results of experiment, it was confirmed that the water level reduction is more remarkable as the location of the side weir was closer to the gate, and the effect of flow distribution is not greatly changed. When two or more side weirs were operated, it is confirmed that the sufficient storage space was secured and the water level reduction effect with the location of the side weir is not large. In addition, the water level reduction rate according to the location of the side weir was estimated by empirical formula and it is provided as basic data that can be used in the planning of the detention reservoir.

Urban Flood Simulation Considering Buildings Resistance Coefficient Based on GIS: Focused on Samcheok City (건물 저항계수에 따른 GIS기반의 밀집 시가지 침수모의 -삼척시가지를 중심으로-)

  • Ji, Juong-Hwan;Kang, Sang-Hyeok
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.2
    • /
    • pp.211-220
    • /
    • 2010
  • The objective of this paper presents the application of an "integrated urban flood modeling-runoff model, urban flood model and sewer system model-" in a highly urbanized area of Samcheok where is seriously inundated in 2002 and 2003. For this, we demonstrate how couple a 1-D hydrodynamic model of the river, a 2-D hydrodynamic model of the overland (surface) flow, and a sewer network model including each boundary conditions. In order to make data file for the model, topographic information like elevation and share rate of buildings are directly extracted from DEM or topographical source data without data exchange to avoid uncertainty errors. Furthermore, the research is to assess the impacts of Manning n and buildings influences to inundated depth by changing its share ratio from 10 % to 30 % in low-land urban area. As a results, we found out that the urban inundated depth was decreased by Manning n but increased by buildings ratio. The calculated results of inundation was similar with observed one in 2002 and 2003 flooding. Furthermore, the area was also inundated under not riverbank break case in 2002 flooding.

A Study on the Peak Runoff Reduction Effect of Seolleung·Jeongneung Zone by Applying LID(Low Impact Development) System based on the Landscape Architectural Technology (조경기술기반 LID 시스템 적용을 통한 선릉·정릉 권역의 첨두유출량 분석)

  • Kim, Tae-Han;Choi, Jong-Hee
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.35 no.4
    • /
    • pp.126-133
    • /
    • 2017
  • This study analyzed hydrological changes of stormwater runoff of Seolleung Jeongneung zone according to the application of LID system based on landscape Architectural technology. The results are as follows. First, when flooding occurred in Gwanghwamun in July 27, 2011, the maximum instantaneous rainfall amount was 183 mm/hr recorded at 10:00 on 27th for 10 minutes, and it was confirmed that rainfall intensity more than three times as high as the maximum rainfall of 57.5 mm/hr. Second, it is possible to control peak flow rate in the case of 1,500mm of soil thickness, so that it is possible to improve the vulnerability of flood damage in Seolleung and Jeongneung zone when applying the LID system. Third, in the berm height scenario, peak flow rate control was not controled in all depth level models, but the first stormwater runoff was delayed by 4 hours and 10 minutes compared to the soil thickness scenario. It was interpreted as a relatively important indicator the soil thickness for the initial stromwater runoff reduction and the berm height for the peak runoff. Through this, the systematic adaptation of landscape-friendly ecological factors within the cultural property protection zone could theoretically confirm the effects of flood disaster prevention.

A study on estimating the quick return flow from irrigation canal of agricultural water using watershed model (유역모델을 이용한 농업용수 신속회귀수량 산정 연구)

  • Lee, Jiwan;Jung, Chunggil;Kim, Daye;Maeng, Seungjin;Jeong, Hyunsik;Jo, Youngsik;Kim, Seongjoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.5
    • /
    • pp.321-331
    • /
    • 2022
  • In this study, we tried to present a method for calculating the amount of regression using a watershed modeling method that can simulate the hydrological mechanism of water balance analysis and agricultural water based on watershed unit. Using the soil water assessment tool (SWAT), a watershed water balance analysis was conducted considering the simulation of paddy fields for the Manbongcheon Standard Basin (97.34 km2), which is a representative agricultural area of the Yeongsan river basin. Before evaluating return flow, the SWAT was calibrated and validated using the daily streamflow observation data at Naju streamflow gauge station (NJ). The coefficient of determination (R2), Nash-Sutcliffe Efficiency (NSE), Root-Mean-Square Error (RMSE) of NJ were 0.73, 0.70, 0.64 mm/day. Based on the calibration results for three years (2015-2017), the quick return flow and the return rate compared to the water supply amount for the irrigation period (April 1 to September 30) were calculated, and the average return flow rate was 53.4%. The proposed method of this study may be used as foundation data to optimal agricultural water supply plan for rational watershed management.

Application of Urban Hydrologic Monitoring System for Urban Runoff Analysis (도시유출해석을 위한 도시수문 모니터링 기법 적용)

  • Seo, Kyu-Woo
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.5 no.2 s.17
    • /
    • pp.37-44
    • /
    • 2005
  • It reflects well feature of slope that is characteristic of urban river basin of Busan local. In this study, process various hydrological data and basin details data which is collected through basin basis data, hydrological monitoring system(EMS-DEU) and automatic water level equipment(AWS-DEU) for urban flood disaster prevention and use as basin input data of ILLUDAS, SWMM and HEC-HMS in order to examine outflow feature of experiment basin and then use in reservoir design of experiment basin through calibration and verification about HEC-HMS. Inserted design rainfall for 30 years that is design criteria of creek into HEC-HMS and then calculated design floods according to change aspect of the impermeable rate. Capacity of reservoir was determined on the outflow mass curve. Designed detention pond(volume $54,000m^3$) at last outlet upper stream of experiment basin, after designing reservoir. It could be confirmed that the peak flow was reduced resulting from examining outflow aspect. Designing reservoir must decrease outflow of urban areas.

Development of a Real Time Control Model for Urban Drainage Systems (도시 내배수시스템 실시간 운영모형의 개발)

  • Jun, Hwandon;Lee, Yang Jae;Lee, Jung Ho;Kim, Joong Hoon
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.5
    • /
    • pp.748-755
    • /
    • 2007
  • To develop an efficient pump operating rule for a retard basin, it is necessary to estimate inflow to the retard basin accurately which is affected by the backwater effect at the outlet of the conduit. The magnitude of the backwater effect is dependent on the water depth of a retard basin; however, the depth is determined by the amount of inflow and outflow. Thus, a real time simulation system that is able to simulate urban runoff and the pump operation with the consideration of the backwater effect is required to estimate the actual inflow to a retard basin. With this system, the efficient pump operating rule can be developed to diminish the possible flood damage on urban areas. In this study, a realtime simulation system is developed using the SWMM 5.0 DLL and Visual Basic 6.0 equipped with EXCEL to estimate inflow considering the backwater effect. The realtime simulation can be done by updating realtime input data such as minutely observed rainfall and the depth of a retard basin. Using those updated input data, the model estimates actual inflow, the amount of outflow discharged by pumps and gates, the depth of each junction, and flow rate at a sewer pipe on realtime basis. The developed model was applied to the Joonggok retard basin and demonstrated that it can be used to design a sewer system and to estimate actual inflow through the inlet sewer to reduce the inundation risk. As results, we find that the model can contribute to establish better operating practices for the pumps and the flood drainage system.

A Proposal for Simplified Velocity Estimation for Practical Applicability (실무 적용성이 용이한 간편 유속 산정식 제안)

  • Tai-Ho Choo;Jong-Cheol Seo; Hyeon-Gu Choi;Kun-Hak Chun
    • Journal of Wetlands Research
    • /
    • v.25 no.2
    • /
    • pp.75-82
    • /
    • 2023
  • Data for measuring the flow rate of streams are used as important basic data for the development and maintenance of water resources, and many experts are conducting research to make more accurate measurements. Especially, in Korea, monsoon rains and heavy rains are concentrated in summer due to the nature of the climate, so floods occur frequently. Therefore, it is necessary to measure the flow rate most accurately during a flood to predict and prevent flooding. Thus, the U.S. Geological Survey (USGS) introduces 1, 2, 3 point method using a flow meter as one way to measure the average flow rate. However, it is difficult to calculate the average flow rate with the existing 1, 2, 3 point method alone.This paper proposes a new 1, 2, 3 point method formula, which is more accurate, utilizing one probabilistic entropy concept. This is considered to be a highly empirical study that can supplement the limitations of existing measurement methods. Data and Flume data were used in the number of holesman to demonstrate the utility of the proposed formula. As a result of the analysis, in the case of Flume Data, the existing USGS 1 point method compared to the measured value was 7.6% on average, 8.6% on the 2 point method, and 8.1% on the 3 point method. In the case of Coleman Data, the 1 point method showed an average error rate of 5%, the 2 point method 5.6% and the 3 point method 5.3%. On the other hand, the proposed formula using the concept of entropy reduced the error rate by about 60% compared to the existing method, with the Flume Data averaging 4.7% for the 1 point method, 5.7% for the 2 point method, and 5.2% for the 3 point method. In addition, Coleman Data showed an average error of 2.5% in the 1 point method, 3.1% in the 2 point method, and 2.8% in the 3 point method, reducing the error rate by about 50% compared to the existing method.This study can calculate the average flow rate more accurately than the existing 1, 2, 3 point method, which can be useful in many ways, including future river disaster management, design and administration.