• Title/Summary/Keyword: Flood Control Reservoir

Search Result 179, Processing Time 0.024 seconds

Optimal Reservour Operation for Flood Control Using a Hybrid Approach (Case Study: Chungju Multipurpose Reservoir in Korea) (복합 모델링 기법을 이용한 홍수시 저수지 최적 운영 (사례 연구 : 충주 다목적 저수지))

  • Lee, Han-Gu;Lee, Sang-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.6
    • /
    • pp.727-739
    • /
    • 1998
  • The main objectives o reservoir optimal operation can be described as follows : maximization of the benefits through optimal allocation of the limited water resources for various purpose; minimization of t도 costs by the flood damage in potential damaging regions and risk of dam failure, etc. through safe drainage of a bulky volume of excessive water by a proper reservoir operation. Reviewing the past research works related to reservoir operation, we can find that the study on the matter of the former has been extensively carried out in last decades rather than the matter of the latter. This study is focused on developing a methodology of optimal reservoir operation for flood control, and a case study is performed on the Chungju multipurpose reservoir in Korea. The final goal of the study is to establish a reservoir optimal operation system which can search optimal policy to compromise two conflicting objectives: downstream flood damage and dam safety-upstream flood damage. In order to reach the final goal of the study, the following items were studied : (1)validation of hydrological data using HYMOS: (2)establishment of a downstream flood routing model coupling a rainfall-runoff model and SOBEK system for 1-D hydrodynamic flood routing; (3)replication of a flood damage estimation model by a neural network; (4)development of an integrated reservoir optimization module for an optimal operation policy.

  • PDF

Analysis of Economic Effectiveness for Flood Control of Dam (댐의 홍수조절에 의한 경제적 효과분석)

  • Choi, Seung-An;Yi, Choong-Sung;Shim, Myung-Pil;Kim, Hung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.5
    • /
    • pp.383-396
    • /
    • 2007
  • The studies on efficiency of flood control reservoir has been introduced into four categories including direct flood control contribution by reservoir, flow-duration change and environmental-ecological change in downstream of dam and flood damage estimation of flood plain. In spite of all the previous approaches, the quantification of the effect of reservoir on the flood control in planning stage is quite complex due to lack of a standard for quantifying feasibility of project. In this study, we develop a methodology that can clearly and accurately quantify the flood damage reduction together with the existing flood level reduction at downstream. The proposed approach uses three appraisal standards of flood control: 'potential safety', 'relative risk' and 'absolute risk' according to the risk by stage. The developed methodology was applied to the Namhan river basin with the storm event of July, 2006. The result shows the damage reduction of 4,189 billion won was estimated. The economic benefits for the flood control effect by dam will greatly contribute to the public understanding of the importance and the effect of the flood control by dam.

Behaviour Analysis of Irrigation Reservoir Using Open Water Management Program (개방형 물관리 프로그램을 이용한 관개용 저수지의 거동 분석)

  • Kim, Sun-Joo;Kim, Phil-Shik;Lim, Chang-Young
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.46 no.1
    • /
    • pp.3-13
    • /
    • 2004
  • For optimal irrigation reservoir operation during flood and normal period, a general and systematic policy is suggested to make balance of the conflicting purposes between water conservation and flood control. We developed Open Water Management Program (OWMP) with an open architecture to deal with newly arising upgrade problems for optimal management of irrigation reservoir. And we evaluated the applicability of OWMP to estimate daily runoff from an agricultural watershed including irrigation reservoirs, and analyzed behaviour of irrigation reservoirs as irrigation water requirements considering frequency analysis of reservoir storage and frequency analysis water requirements for effective management of reservoir. When we executed OWMP with data produced from an experimental field, IHP basins, the mean relative errors of application of daily runoff and irrigation water requirement were less than 5%. We also applied OWMP to a Seongju irrigation reservoir to simulate daily runoff, storage and water requirement from 1998 to 2002, and the mean model efficiency between measured and simulated value was 0.76. Our results based on the magnitude of relative errors and model efficiency of the model simulation indicate that the OWMP can be a tool nicely adapted to the effective water management of irrigation reservoir for beneficial water use and flood disaster management.

Maximizing of hydropower generation of Hwacheon Reservoir using HEC-ResPRM model

  • Karimizadeh, Keivan;Choi, Changwon;Yi, Jaeeung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.219-219
    • /
    • 2015
  • Hwacheon Reservoir is one of the reservoirs, which are located on the North Han River in South Korea. Construction of this reservoir was started in 1939 and completed in 1944. At the upstream of this reservoir there are Peace Reservoir, which is located in South Korea and Imnam Reservoir, which is located in North Korea. After construction of Imnam Reservoir, inflow regularity of Hwacheon Reservoir was changed and inflow of Hwacheon Reservoir also, was decreased. Peace Reservoir is used to decrease flood and damage at downstream due to unexpected release from Imnam Reservoir. This reservoir also, has a special role to regulate inflow of Hwacheon Reservoir. Hwacheon Reservoir has an important role for hydropower generation and flood control. Capacity and maximum discharge capacity of Hwacheon Reservoir are 1018 million $m^3$ and $9500m^3/s$, respectively. This reservoir has four generators to produce power and it is one of the important reservoirs for hydropower generation in South Korea. Due to the important role of this reservoir in generating power, maximization of hydropower generation of this reservoir is important and necessary. For this purpose, HEC-ResPRM model was applied in this study. HEC-ResPRM is a useful and applicable model to operate reservoirs and it gives optimal value for release to maximize power by minimizing penalty functions. In this study, after running the model, amount of release was optimized and hydropower generation was maximized by allocating more water for hydropower release instead of spillway release. Also, the model increased release in dry period from October to June to prevent high amount of release in flood season from July to September.

  • PDF

OPTIMUM STORAGE REALLOCATION AND GATE OPERATION IN MULTIPURPOSE RESERVOIRS

  • Hamid Moradkhani
    • Water Engineering Research
    • /
    • v.3 no.1
    • /
    • pp.57-62
    • /
    • 2002
  • This research is intended to integrate long-term operation rules and real time operation policy for conservation & flood control in a reservoir. The familiar Yield model has been modified and used to provide long-term rule curves. The model employs linear programming technique under given physical conditions, i.e., total capacity, dead storage, spillways, outlet capacity and their respective elevations to find required and desired minimum storage fur different demands. To investigate the system behavior resulting from the above-mentioned operating policy, i.e., the rule curves, the simulation model was used. Results of the simulation model show that the results of the optimization model are indeed valid. After confirmation of the above mentioned rule curves by the simulation models, gate operation procedure was merged with the long term operation rules to determine the optimum reservoir operating policy. In the gate operation procedure, operating policy in downstream flood plain, i.e., determination of damaging and non-damaging discharges in flood plain, peak floods, which could be routed by reservoir, are determined. Also outflow hydrograph and variations of water surface levels for two known hydrographs are determined. To examine efficiency of the above-mentioned models and their ability in determining the optimum operation policy, Esteghlal reservoir in Iran was analyzed as a case study. A numerical model fur the solution of two-dimensional dam break problems using fractional step method is developed on unstructured grid. The model is based on second-order Weighted Averaged Flux(WAF) scheme with HLLC approximate Riemann solver. To control the nonphysical oscillations associated with second-order accuracy, TVD scheme with SUPERBEE limiter is used. The developed model is verified by comparing the computational solutions with analytic solutions in idealized test cases. Very good agreements have been achieved in the verifications.

  • PDF

Analysis of Flood Control Capacity of Agricultural Reservoir Based on SSP Climate Change Scenario (SSP 기후변화 시나리오에 따른 농업용 저수지 홍수조절능력 분석)

  • Kim, Jihye;Kwak, Jihye;Hwang, Soonho;Jun, Sang Min;Lee, Sunghack;Lee, Jae Nam;Kang, Moon Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.63 no.5
    • /
    • pp.49-62
    • /
    • 2021
  • The objective of this study was to evaluate the flood control capacity of the agricultural reservoir based on state-of-the-art climate change scenario - SSP (Shared Socioeconomic Pathways). 18 agricultural reservoirs were selected as the study sites, and future rainfall data based on SSP scenario provided by CMIP6 (Coupled Model Intercomparison Project 6) was applied to analyze the impact of climate change. The frequency analysis module, the rainfall-runoff module, the reservoir operation module, and their linkage system were built and applied to simulate probable rainfall, maximum inflow, maximum outflow, and maximum water level of the reservoirs. And the maximum values were compared with the design values, such as design flood of reservoirs, design flood of direct downstream, and top of dam elevation, respectively. According to whether or not the maximum values exceed each design value, cases were divided into eight categories; I-O-H, I-O, I-H, I, O-H, O, H, X. Probable rainfall (200-yr frequency, 12-h duration) for observed data (1973~2020) was a maximum of 445.2 mm and increased to 619.1~1,359.7 mm in the future (2011~2100). For the present, 61.1% of the reservoirs corresponded to I-O, which means the reservoirs have sufficient capacity to discharge large inflow; however, there is a risk of overflowing downstream due to excessive outflow. For the future, six reservoirs (Idong, Baekgok, Yedang, Tapjung, Naju, Jangsung) were changed from I-O to I-O-H, which means inflow increases beyond the discharge capacity due to climate change, and there is a risk of collapse due to dam overflow.

The optimal operation of reservoir systems during flood season (홍수기 저수지의 최적연계운영)

  • Han, Kun-Yeun;Choi, Hyun-Gu;Kim, Dong-Il;Lee, Kyeong-Teak
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.743-746
    • /
    • 2008
  • Recently, due to the effect of global warming and extreme rainfall, the magnitude of flood disaster and the frequency of flood is rapidly increasing. In order to mitigate the damage of human and property from this kind of meteorological phenomenon and manage water resources scientifically, effective operation of dam and reservoir is very important. In case of Andong dam which was not performed a flood control function needs to develop new types of dam safety management measure because of recent extraordinary flood by typhoons. In case of Andong dam and Imha dam, I am using HEC-5 model in order to apply reservoir simulation. In this case, complex conditions among 100-year floods , 200-year floods and PMF was used. Also, I modified the maximum outflow 3,800m3/s into 3,490m3/s and applied this modified discharge in order to secure freeboard in the downstream. In an analysis that I applied modified outflow by 100-year floods and 200-year floods to, the result showed that river didn't overflow in Andong area but some other places have relatively low freeboard. In the cases that I modified maximum outflow, results showed that freeboard of levee is larger than existed simulation. In the simulation that I applied 200-year floods and PMF to and under a condition connected with PMF, results showed overflowing the levees. Because of the difference between the frequency of dam outflow and the design flood in river, it is required to improve the existed flood plan in the downstream of Andong dam. As a result of this study, the optimal operation of reservoir systems can be proposed to mitigate the flood damage in the downstream of Andong dam and also can be used to establish the flood plans.

  • PDF

Study on the Priority Decision for Redevelopment of Agricultural Reservoir (농업용저수지 재개발 우선순위 결정 연구)

  • Kim, Hae-Do;Kim, Sun-Joo;Lee, Kwang-Ya
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.6
    • /
    • pp.63-68
    • /
    • 2009
  • Most of agricultural reservoirs in Korea have no function of flood control except 5% of reservoirs even exposed to natural disaster. In addition, there are increasing needs for the reservoir to guarantee the release of environmental flow to the downstream. Thus, the purpose of this paper is to study the priority decision method for the reservoir redevelopment satisfying both water utilization and flood control. The major scopes of this research are to set up six priority indices and to make needed GIS data for calculating each priority. There is important consideration of obtaining the data or not in deciding the indices. Although the detailed indices is expected to better reflect redevelopment priority but the subjective indices like, 'opinion' and 'landscape' are excluded. From the results, it will enables the six priority indices to really assist in decision redevelopment priority of agricultural reservoirs.

A Study on Rainfall-Runoff Frequency Analysis for Estimating Design Flood (설계홍수량 산정을 위한 강우-유출 빈도해석에 관한 연구)

  • Choi, Jongin;Ji, Jungwon;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.8
    • /
    • pp.605-612
    • /
    • 2015
  • The purpose of this study is to compare and analyze design flood estimation methods which are the basis for determining the size of a flood control structure. The result from a flood frequency analysis which is considered as the best way for estimating design flood was assumed as a true value, and a method of simulating runoff and performing frequency analysis of the maximum discharge data were compared with a design storm method. For a comparative analysis of design flood estimation, seven basins (Namgang reservoir basin, Soyanggang reservoir basin, Andong reservoir basin, Seomjingang reservoir basin, Imha reservoir basin, Chungju reservoir basin, Hapcheon reservoir basin) were selected. For the Seomjingang, Hapcheon, and Imha reservoir basins, the method proposed in this study showed better results, whereas the conventional method showed better results for the Namgang, Soyanggang, and Chungju reservoir basins. The results show that the conventional method (the design storm method) is not the best way for estimating design flood and the proposed method can be used as an alternative for small basins.

Estimating the Valuation of Flood Control Reservoir Using the Contingent Valuation Method (조건부가치측정법을 이용한 홍수조절지 가치 평가에 관한 연구)

  • Kim, Sang-Won;Kim, Geun-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.3
    • /
    • pp.101-107
    • /
    • 2010
  • The purpose of this study is to evaluate the benefits of flood control reservoir and to derive the policy implication by significant variables of willingness to pay. As a result of analyzed using contingent valuation method, variables that affect the amount of willingness to pay are housing area, frequency of disasters, educational background, and family income. All variables are analyzed as the plus effect for the willingness to pay, and the annual benefits of flood control reservoir per family are estimated as approximately 32,000 won. The implication of this study is as followed. First, the value of the respondents about public goods is not small. Second, the contingent valuation method can be useful plan to estimate the value of public goods. Finally, the benefits should be compared with various aspects because of the wide deviation of the demand population.