• Title/Summary/Keyword: Flood Control Dam

Search Result 192, Processing Time 0.03 seconds

Analysis of Economic Effectiveness for Flood Control of Dam (댐의 홍수조절에 의한 경제적 효과분석)

  • Choi, Seung-An;Yi, Choong-Sung;Shim, Myung-Pil;Kim, Hung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.5
    • /
    • pp.383-396
    • /
    • 2007
  • The studies on efficiency of flood control reservoir has been introduced into four categories including direct flood control contribution by reservoir, flow-duration change and environmental-ecological change in downstream of dam and flood damage estimation of flood plain. In spite of all the previous approaches, the quantification of the effect of reservoir on the flood control in planning stage is quite complex due to lack of a standard for quantifying feasibility of project. In this study, we develop a methodology that can clearly and accurately quantify the flood damage reduction together with the existing flood level reduction at downstream. The proposed approach uses three appraisal standards of flood control: 'potential safety', 'relative risk' and 'absolute risk' according to the risk by stage. The developed methodology was applied to the Namhan river basin with the storm event of July, 2006. The result shows the damage reduction of 4,189 billion won was estimated. The economic benefits for the flood control effect by dam will greatly contribute to the public understanding of the importance and the effect of the flood control by dam.

Change of Flood Characteristics in the Down Stream of Keum River after the Ken River Estuary Dam Construction (금강하구언 건설후 금강하류의 홍수흐름특성변화)

  • 박승기;문종필;민진우;김태철;안병기
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.41-46
    • /
    • 1998
  • The purpose of the study was changed of Flood Characteristics in Down stream of Keum River by the Keum River Estuary Dam Construction. The water surface slope of Kuem river after the Keum River Estuary Dam construction was steeper then before. The flood control capacity increase after construction. But, Increasing sediment in Kuem river will be decreased flesh reservoir volume for yield irrigation.

  • PDF

Change of Hydraulic Characteristics in the Downstream Keum River after the Construction of Estruary Dam (금강하구둑 건설로 인한 금강하류부의 수리 특성 변화)

  • 박승기
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.41 no.5
    • /
    • pp.68-76
    • /
    • 1999
  • The purpose of the study was to investigated the change of hydraulic characteristics like water surface profile and rivered section in the down stream of Keum river after the construction of esturary dam. The effect of esturary dam on the flood control in the Keum river was recognized with the data of two flood events happened in July, 1987 before the construction and in August, 1995 after the construction of estuary dam. For example , duration time above the water level of the warning -flood was changed from 46.5 to 42.8 hours and duration time above the eater level of the danger-flood was changed from 24.7 to 19.8 hours at the Kyuam station. The time difference to reach the water level of the designated -flood between Kyuam and Kangkyung was changed from 3 hours in 1987 to 12 hours and 20 minutes in 1995. The water surface slope of river decreased 25.6% between estuary dam and Kangkyung and increased 16.5% between Kangkyung and Kyuam, and decreased 8.8% between Kyuam and Kongju. As the result, velocity was getting faster and river bed was scoured in the reach of Kangkyung and Kyuam, and velocity was getting slower and river bed was sedimented in the reach of Kangkyung and estury dam.

  • PDF

Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( II ) - Simulation of Historical Flood Events - (퍼지제어모형을 이용한 다목적 댐의 홍수조절모형 (II) - 과거홍수사상에 대한 적용 -)

  • Shim, Jae-Hyun;Kim, Ji-Tae;Cho, Won-Cheol;Kim, Jin-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.1 s.12
    • /
    • pp.41-50
    • /
    • 2004
  • The objective of this study is to investigate the feasibility of the developed Fuzzy control techniques in dam operation. The simulated results for the 1984, 1990, and 1995 flood events are compared with historical operation results in the view of flood control and disaster prevention. The three models developed in this study determine the outflows based on the two conditions the first one is to consider only two inputs such as reservoir water level and inflow, for operation of the existing situations, the second one is that the possible maximum discharge from each dam does not exceed the allowable design maximum discharge for disaster prevention in downstream area. As the results, it was shown that the suggested models based on Fuzzy control technique could reduce both the peak water level and the maximum peak discharge compared with the historical operation results.

A Comparative Study of Reservoir Operations for Flood Control of the Chungju Dam (홍수시 충주댐 운영방안의 비교검토)

  • 이길성;정동국
    • Water for future
    • /
    • v.18 no.3
    • /
    • pp.225-233
    • /
    • 1985
  • To develop a simulation strategy of multi-reservoir operation in flood season, the single dam operations methed for the Chungju dam are investigated in the Han river basin. Thus, spillway rule curve, rigid ROM, and linear decision rules are applied for control operations, subject to the restrictions imposed by the river and the reservoir characteristics. The storage and release and control/utility efficiencies for several floods are calculated. The variation of control coefficients with respect to the return period are also examined. As the results of this comparative study, the optimal operation method can be selected in terms of the magnitude of flood. With inflow forecasting, the flood control operation can be greatly improved by variable coefficients rigid ROM and linear decision rules.

  • PDF

Dam Inflow Forecasting for Short Term Flood Based on Neural Networks in Nakdong River Basin (신경망을 이용한 낙동강 유역 홍수기 댐유입량 예측)

  • Yoon, Kang-Hoon;Seo, Bong-Cheol;Shin, Hyun-Suk
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.1
    • /
    • pp.67-75
    • /
    • 2004
  • In this study, real-time forecasting model(Neural Dam Inflow Forecasting Model; NDIFM) based on neural network to predict the dam inflow which is occurred by flood runoff is developed and applied to check its availability for the operation of multi-purpose reservoir Developed model Is applied to predict the flood Inflow on dam Nam-Gang in Nak-dong river basin where the rate of flood control dependent on reservoir operation is high. The input data for this model are average rainfall data composed of mean areal rainfall of upstream basin from dam location, observed inflow data, and predicted inflow data. As a result of the simulation for flood inflow forecasting, it is found that NDIFM-I is the best predictive model for real-time operation. In addition, the results of forecasting used on NDIFM-II and NDIFM-III are not bad and these models showed wide range of applicability for real-time forecasting. Consequently, if the quality of observed hydrological data is improved, it is expected that the neural network model which is black-box model can be utilized for real-time flood forecasting rather than conceptual models of which physical parameter is complex.

Dam Effects on Spatial Extension of Flood Discharge Data and Flood Reduction Scale II (홍수 유출자료의 공간확장과 홍수저감효과에 대한 댐 영향 분석 II)

  • Jung, Yong;Kim, Nam Won;Lee, Jeong Eun
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.3
    • /
    • pp.221-231
    • /
    • 2015
  • This is a continuous study on the dam effects for the spatial extension of flood data. In this study, flood reduction rates of dams and their influences on downstream using the spatially extended flood data were implemented. Nam-Han River was selected for measuring the impacts of ChoongJu and HoangSung dams. In the evaluations of flood reduction rate at dams, the larger flood events have the lower flood reduction rates for both dams. At the YeoJoo water level station, the analyses of the relations between flood reduction rates and the sizes of watersheds dams located were performed. the sizes of watersheds having a functional dam have highly influenced on the reduction rates of flood. The average of flood reduction rates was smaller than the area rate. For instances, area rates of HoangSung (0.02) and ChoongJu dams (0.6) are larger than the average flood reduction rates for HoangSung (0.01) and ChoongJu dams (0.51), respectively. However, the water level station follows the dam flood reduction characteristics of dams themselves. The spatial effects of dam flood reductions are analyzed based on the three water level stations (GangChun, YeoJoo, YangPyung). The distance of flood reduction rates lower than 0.1 as average flood reduction rate was the area 7 times of watershed having a dam with 0.02 as a minimum reduction rate.

Flood Water Level Changes Analyses for the Construction of a Small Dam -Focused on the Geum River Reach in Sejong City- (수위유지시설 설치에 따른 홍수위 변화 해석 - 세종시 금강 구간을 중심으로 -)

  • Jeong, Sang-Man;Park, Chan-Seong;Lee, Joo-Heon;Shin, Kwang-Seob
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.2
    • /
    • pp.59-68
    • /
    • 2009
  • Currently, building a small dam located 1.16 km downstream from Geumnam Bridge is being considered in order to improve the riverine scenery of the site for Sejong City and to create a hydrophilic space. The purpose of this research is to present the appropriate dimensions of a small dam by reviewing the flood control reliability of the Geum River after the small dam is built. To establish this purpose, changes in the flood water level were compared and analyzed by changing the installation height of a small dam using 1D and 2D models. 1D HEC-RAS and 2D FESWMS models were applied to perform the numerical analysis of the reach. The results showed that flood control reliability was guaranteed when the installation height of the small dam was 5 meters or lower. From the 2D model, a more accurate result can be developed because the model could provide a two dimensional numerical analysis. The results can be used to determine the appropriate dimensions of a small dam for Sejong City.

Improvement for Reservoir Operation Module of Flood Forecasting-Warning Systems in Han River (한강 홍수예경보시스템의 저수지 운영모듈 개선)

  • Kwon, Oh-Ig;Kim, Sung;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.6
    • /
    • pp.685-695
    • /
    • 1999
  • On the premise of flood control procedure, flood forecasting-warning, system(FFWS) is one of actions for disaster prevention. It makes public announcements for flood situations timely in order to mitigate damage from floodings. Multi-purpose dam which has flood control storage plays an important role in river basin at flood time. In FFWS, it is reservoir operation module that is related to reservoir operation of multi-purpose dam. This study considers the current conditions and problems in reservoir operation module of FFWS in Han River and improves reservoir operation module under limited research scope. As results, additional reservoir operation modules such as Technical ROM(Reservoir Operation Method) and ARD(Approved Release Discharge) ROM were built in FFWS. Using these newly built reservoir operation modules. Han River Flood Control Office will plan and work for flood control and flood forecasting. Firstly, it may plan for flood control by Technical ROM which is deterministic simulation model, and work for final flood control and flood forecasting by ARD ROM according to approved release discharge afterward.

  • PDF

Study of Operation Rules for Flood Control to Seomjin River Dam Using HEC-ResSim (HEC-ResSim을 이용한 섬진강댐의 홍수조절 운영룰에 관한 연구)

  • Ahn, Jung Min;Lyu, Siwan;Kim, Joo Cheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.2B
    • /
    • pp.93-101
    • /
    • 2012
  • HEC-ResSim, reservoir operation model, is applied to Seomjin river dam in order to establish a rational method for water supply and flood control by dam operation. In order to minimize downstream flood damage for Seomjin river basin and adjacent regions, reservoir routing is applied to several frequency flood events within the framework of rainy seasonal operation rule and then the characteristics change of hydrological behavior for the downstream of study area is investigated in depth. Its quantitative efficiency and estimation method is evaluated on the basis of the adjustment scheme of conservation water surface elevation for flood control and water secure; reservoir routing considering preliminary release and variable restricted water level; and its effect to water supply; and downstream flood-duration analysis.