In recent years, Unmanned Aerial Vehicles (UAVs) were actively developed in various fields. In development process of UAVs, flight test is performed to ensure that minimum safety requirements and technical requirements are met. By constructing flight test infrastructure such as takeoff and landing facilities, operation procedure, and equipments, flight test can be performed effectively. In this paper, operation procedures of civil UAV's flight test are proposed. The procedures proposed are composed by two main steps: first, planning and permitting procedure of flight test. Secondly, execution and control procedure of flight test.
Recently, domestic small airport development plans are being promoted centering on islands, and among them, Baengnyeong Island Airport is located very close to North Korea due to its geographical characteristics. In particular, since it is located in the P-518, which is prohibited airspace, it is essential to configure the arrival/departure flight procedure route similarly to the current ship in terms of securing flight safety. Therefore, in this study, a plan for airport location and facility scale was proposed by focusing on the runway operated for the purpose of aircraft operation through consultations with the Ministry of National Defense. It was proposed to meet the standards of the Airport Facility Act as an airport dedicated to domestic flights for airside facilities such as runway length and direction, target aircraft, landing pad, apron, runway and taxiway width appropriate for the topographical characteristics of Baengnyeong Island. As a result, the flight procedure is generally established as a two-way visual flight, but the 10-way arrival/departure procedure was planned to be changed to an instrument (non-precision) according to the specificity of the region. In addition, a flight procedure was established and presented for safe and systematic operation by reflecting the changes in airport facility size (landing pad, runway end safety area, etc.) following the change in instrument flight procedure in the visual flight procedure.
This is a research report about the method of how to maintain qualification of certification flight test crews. KCA(Korea Certification Agency) have completed the KC-100 airplane certification flight tests which is the first time experienced flight tests operation. After the certification flight test, it has been found that annual flying time requirement of 100 hours to the certification flight test pilot is too strict, and other several requirements to maintain the qualification of the certification test crew such as aircraft certification introduction training, initial flight test pilot and flight test engineer certification training, crew resource management training, aviation physiology training, and survival training was difficult to implement in Korean civil aviation environments. In this study, it was suggested that 30 hours of flying time for maintaining certification flight test pilot qualification could be applied to contribute for safe operation of certification flight test and the other training requirements of the certification flight test crew could be fulfilled using self made training courses, existing FAA training courses and Korean Air Force training resources. Therefore, it is recommended that the regulation of maintaining the certification flight test crew qualification should be refined to implement the requirement practically.
In response to the recent surge in aviation demand, major airports and aviation authorities continue to make efforts to formulate arrival and approach procedures that take into account efficient aircraft separation, noise and environmental issues of carbon (CO2) emissions. In order to ensure efficient traffic control and environmental issues, as a result, a new concept Trombone, Point Merge, etc. have been introduced and widely used in the domestic airspace. However, these new concept procedures which do not properly reflect the characteristics of the aircraft operation performance and the FMS vertical descent guidance hinder flight efficiency as well as bring in turn negative factors such as level-off flight and the use of drag device at the busiest phase of the flight descent operation, like the Continuous Descent Operation (CDO). Accordingly, throughout modification the current Standard Terminal Arrival Route (STAR) and Instrument Approach Procedure(IAP) that reflect the aircraft descent performance and the FMS guidance, the flight operation safety and efficiency is expected to be improved eventually. We herewith analyze and propose the way of improving flight efficiency in the arrival operation procedure by supplementary modification which consequently contribute to the aviation industry international competitiveness.
After a series of aircraft noise measurements conducted in Noise Sensitive Areas(NSAs) in Gangwha Island, there appeared to be no regions affected by aircraft noise of over 75 WECPNL, the legal noise level standard for aircraft operations. However, with regard to the future environment where flight operations at Incheon International Airport are likely to escalate, an INM analysis result drawn shows that the number of regions afflicted by such noise will increase in Gangwha Island. Therefore, we studied similar cases from developed countries, which are pertinent to solutions for aircraft noise abatement in the vicinity of airports and herewith provided 6 more flight operation procedures other than those 3 currently in service at Incheon International Airport.
This paper introduces a new airspace design method for continuous climb operation (CCO). The optimization problem is formulated as Mixed-Integer Linear Program (MILP) to maximize the upper limits of altitude on the waypoints to facilitate continuous climb for aircraft. In the proposed method, the interactions with other flight procedures are considered as well as various aircraft flight performances. The proposed method is applied to one of the departure procedures of Incheon International Airport (ICN) to demonstrate its performances.
Song, Young-Joo;Bae, Jonghee;Hong, SeungBum;Bang, Jun
Journal of Astronomy and Space Sciences
/
제39권4호
/
pp.181-194
/
2022
Korea Pathfinder Lunar Orbiter (KPLO), also known as Danuri, was successfully launched on 4 Aug. from Cape Canaveral Space Force Station using a Space-X Falcon-9 rocket. Flight dynamics (FD) operational readiness was one of the critical parts to be checked before the flight. To demonstrate FD software's readiness and enhance the operator's contingency response capabilities, KPLO FD specialists planned, organized, and conducted four simulations and two rehearsals before the KPLO launch. For the efficiency and integrity of FD simulation and rehearsal, different sets of blind test data were prepared, including the simulated tracking measurements that incorporated dynamical model errors, maneuver execution errors, and other errors associated with a tracking system. This paper presents the simulation and rehearsal results with lessons learned for the KPLO FD operational readiness checkout. As a result, every functionality of FD operation systems is firmly secured based on the operation procedure with an enhancement of contingency operational response capability. After conducting several simulations and rehearsals, KPLO FD specialists were much more confident in the flight teams' ability to overcome the challenges in a realistic flight and FD software's reliability in flying the KPLO. Moreover, the results of this work will provide numerous insights to the FD experts willing to prepare deep space flight operations.
대부분 국가에서 계기비행 절차는 국제민간항공기구(ICAO)의 DOC 8168, 항행 서비스 및 운항 절차(PANS-OPS) 또는 미국 연방항공청(FAA)의 터미널 절차(TERPS) 중 한 가지 기준을 적용해 설계된다. 특히, 선회접근 절차는 두 기준이 서로 많은 차이를 갖고 있고, 미국 터미널 절차(TERPS)는 2013년 이후에는 고도에 따라 확장된 기준을 적용함으로써 더 복잡해졌다. 선회접근 절차는 착륙을 위해 항공기를 에너지가 낮은 상태에서 지면과 가깝게 기동하는 것을 포함하므로 직진접근 절차보다 더 위험에 노출된다. 본 연구에서는 이들 차이점을 정확하게 알기 위해 선회접근 절차가 국내의 개별 공항에 따라 어떤 기준에 의해 설계되었는지를 구분하고, 선회접근 기동 중 최소장애물 회피를 보장하는 선회접근 구역 범위를 위한 반경을 산출하고, 안전한 선회접근 절차 수행을 위한 방법을 제시한다.
비행시험 운용절차는 유도무기 비행시험 시스템 설계 및 구현을 위한 중요 산출물의 하나로서 비행시험 진행 단계별 임무계획, 수행방법, 안전대책 등을 포함한다. 유도무기체계 개발이 첨단화, 전략화 됨에 따라서 유도무기 비행시험은 점차 복잡화, 광역화 되고 있다. 이에 따라 시험안전을 확보하기 위해서는 비행시험 운용절차의 신뢰성 증대가 요구되었다. 특히, 새로운 개념의 비행시험 수행을 위해서 시험 전 불확실성을 예측하고 대비할 수 있도록 비행시험 운용절차 설계에서 M&S 기법의 적용을 통한 검증이 필요하게 되었다. 관련 연구로서 비행시험의 최적 프레임워크 개발 연구와 비행시험 프로세스 모델기반 개선 연구들이 발표되었지만, 상위 개념의 프로세스를 중심으로 한 결과로서 하위 수준의 비행시험 자원과 연동하는 비행시험 운용절차에 직접 적용하기에는 구체성이 부족하였다. 또한, 기존의 문서기반으로 구성된 비행시험 운용절차는 시험자원의 거동과 성능에 대한 분석능력의 한계로 시험자원의 중복과 누락, 직관적이지 않는 표현으로 운용자 간의 의사소통 저하, 그리고 다수의 비행시험에 적용하기 위한 확장성 부족 등의 문제가 발생하였다. 이를 개선하기 위해 본 논문에서는 모델기반 시스템공학(MBSE) 기법의 적용을 통한 유도무기 비행시험 운용절차의 설계 방법을 제안하였다. 구체적으로 이전의 비행시험 정보를 기반으로 비행시험 진행 단계와 수행방안을 정의한 후, 요구사항으로부터 시험자원의 임무수행을 SysML 모델 기반으로 구성한 템플릿으로 제공하였다. 또한 시뮬레이션 분석을 통해서 정상상황과 비상상황에 대한 최적의 수행절차를 도출하였으며, 사례 적용을 통해서 검증하였다. 본 연구를 통해서 시험자원의 거동과 성능에 대한 분석능력의 증대로 신뢰성이 향상되었고, 다수의 비행시험에 적용할 수 있는 확장성으로 효율성이 증대되었으며, 향후 개발 예정인 유도 무기 비행시험에도 지속적으로 활용할 수 있다.
During the assembly and function inspection of missile system, flight simulation process is required. In the conventional flight simulation check of missiles, an inertial navigation system simulator was used to transmit the navigation output data acquired in HILS. There are several disadvantages in terms of check configuration complexity and data synchronization when using the simulator. So we proposed a new flight simulation method that utilizes the nonvolatile built-in memory of the aviation control unit. The data processing procedure and operation procedure of the proposed method for type I and type II missiles are presented. And we analyzed the causes of the difference between proposed method result and the HILS result for type II missile. By comparing the results obtained by the experiments using the proposed method with the results of HILS, the validity of proposed method was confirmed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.