• Title/Summary/Keyword: Fire facility

Search Result 449, Processing Time 0.02 seconds

A Study on the Odor and Ventilation in Sludge Incineration Facilities (슬러지 소각시설 악취 및 환기에 관한 연구)

  • Seo, Byung-Suk;Jeon, Yong-Han
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.2
    • /
    • pp.7-13
    • /
    • 2020
  • Sludge incineration facilities are socially recognized as a hate facility. Therefore, a careful deodorization plan must be established. Therefore, the incineration facility must conduct research on odor ventilation. In this study, a odor diffusion simulation in an incineration facility was conducted and analyzed. In particular, research was carried out on carry-in rooms, pre-treatment rooms, and storage facilities for crops, which are expected to rapidly spread odor. As a result, ammonia 1.62, hydrogen sulfide 0.63, and acetaldehyde 0.73 were found in the transfer room. In addition, pretreatment rooms and stencil storage facilities were found to be lower than regulatory standards.

A Study on the Border Signal-fire In Eastern Sea (조선시대 동해안지역 연변봉수에 관한 연구)

  • Lee, Chul-Young;Kim, Seong-Chul
    • Journal of architectural history
    • /
    • v.17 no.2
    • /
    • pp.47-66
    • /
    • 2008
  • This research was to analyze the border signal-fire which is the main facility of military protective duty for safety of sea side in chosun dynasty. The results of this research were described separately as follows. 1. Five types of site plan of signal-fire were observed, which is circle, half-circle, oval, round-rectangular. The majorities were circle type in eastern area. 2. Plan configuration of signal-fire stand which is separated with circle, rectangular type roughly was constructed with circle type generally. The height of signal-fire stand was about $2{\sim}3m$. The diameter of signal-fire stand was $8{\sim}10m$. Building base that protect ground moisture and infilteration of rainfall was found in 9 border singal-fire, the height of it was about $0.3m{\sim}2.5m$. 3. Trench was mainly circle type and average width was $3{\sim}4m$. However the depth was almost observed as 1m, originally, it was estimated it has more depth. 4. The height of protective wall remained until present was about 1m, the depth was about average 2.5m. 5. The storage of border signal-fire has rectangular dimension, several types of $1.8{\times}1.2m{\sim}5.7{\times}4.4m$, square(間) of $1{\times}1{\sim}2{\times}1$. The building material was stone and located below or near the signal-fire stand.

  • PDF

A Study on the Legislation for Separate Prime Contracting in the Fire Facility Business (소방시설업의 분리발주 법제화에 관한 연구)

  • Lee, Chang Woo
    • Fire Science and Engineering
    • /
    • v.27 no.6
    • /
    • pp.97-103
    • /
    • 2013
  • This study analyzes the present public construction ordering system focussing on the legal framework for the fire facilities construction business and investigates the problem of subcontracting, and further reviews why Separate Prime Contracting should be recommended in policy, social, legislative and regulative terms. This study suggests the amendment of Fire Facilities Construction Business Act, with new bill drafting. The result of this study shows the present public construction ordering system has huge disparities between main building construction business and fire facilities construction business, and recommend Separate Prime Contracting should be adopted in the fields of fire facilities construction business. The system of Separate Prime Contracting may secure business entities' responsibility and higher quality of fire facilities, and also result in reasonable construction practices in reasonable costs. This system may also contribute to improve public safety level in fire facilities construction.

Vulnerability Analysis on Fire Service Zone using Map Overlay Method in GIS (GIS 기반 중첩기법을 이용한 소방서비스 취약지역 분석)

  • Lee, Seul-Ji;Lee, Ji-Yeong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.1
    • /
    • pp.91-100
    • /
    • 2011
  • Fire stations should be located in optimal location to act quickly in case of emergency and minimize damages as a public facility that protects life and property of local residents. Siting fire stations without regard for the accessibility and occurrence factors of an accident may provide fire service unequally. Therefore service analysis is necessary to reduce the blind spot of disaster and safety and to offer equal fire-service at this time. Especially fire stations can service more efficiently than before by reducing a more likely vulnerable area. This study suggests methods of mapping index of value that represents vulnerability of the occurrence of an accident and extracting service zone map of fire stations, as an initial research for offering efficient fire service. Geographical distribution mismatch between service zone map and vulnerability map is figured out and vulnerable area for fire service is defined by using map overlay method.

An Experimental Study on the Thermal Property of Concrete under the Load Ratio Condition in Fire (고온화재조건 콘크리트 라이닝의 하중비에 따른 폭렬영향성 및 화재손상특성에 관한 실험적 연구)

  • Kim, Hyung-Jun;Kim, Heung-Youl;Park, Kyung-Hun;Ahn, Chan-Sol;Kwon, Ki-Hyuk
    • Fire Science and Engineering
    • /
    • v.24 no.3
    • /
    • pp.145-151
    • /
    • 2010
  • The fire in tunnel, when failed to extinguish at early stage, tends to easily develop to high temperature and spread to entire area of the tunnel because of considerable level of fire load and smoke control facility within the tunnel, resulting in severe damage to the people and tunnel structure. This study was intended to carry out the fire test with MHC fire curve, a scenario, which has the most rapid fire rise, on assumption of load ratio of 1, 20, 40, 60 and 70%, so as to identify the thermal characteristics of the concrete against spalling and the range of fire damage. The specimen was small scale sample as defined by EFNARC and the mixing ratio was based on 24 MPa, which is considered to be the normal strength. As a result of test, 16mm spalling was occurred on the lining under the non-load condition, while no spalling was occurred with 20% and 40% of load ratio. In case of 60% of load ratio, 24 mm of spalling was occurred and it failed in 10 minutes after heating in case of 70% load condition.

A Study on the Fire Risk Assessment and Prevention in the Recycling Process of Used Refrigerators (냉장고 파쇄 공정에서의 화재 위험성 및 예방에 관한 연구)

  • Lee, Su-Kyung;Song, Dong-Woo;Bae, Jeong-Ae
    • Fire Science and Engineering
    • /
    • v.23 no.5
    • /
    • pp.72-77
    • /
    • 2009
  • In the recycling procedure of the refrigerator, the fire frequently breaks out. In this study, to clarify the exact cause of the fire, the components and concentration of the materials produced in the process are analysed as well as the problems in the process system, and the protective measure to prevent the fire and the explosion fundamentally is proposed. In this procedure, the preventive measures of fire by removing the combustible materials such as polyurethane and inflammable gases, by removing the ignition sources and by reducing the oxygen concentration to the minimum are proposed along with the protective measures to reduce the damage in the fire. In the crushing procedure where the fire or explosion can break out in diverse ways, the forced ventilation or exhaust system applied to the small partial ventilation facility are installed to reduce the concentration of inflammable gas mixture to lower than the inflammable limit by injecting and exhausting the air forcibly.

Numerical Simulation on Smoke Movement in Multi-Compartment Enclosure Fires under Pressurized Air Supply Conditions (급기가압 조건에서 복합 구획 공간 화재의 연기 거동에 대한 수치해석 연구)

  • Ko, Gwon Hyun
    • Fire Science and Engineering
    • /
    • v.32 no.6
    • /
    • pp.15-21
    • /
    • 2018
  • This study examined the flow characteristics of fire smoke under pressurized air ventilation conditions by carrying out fire simulations on multi-compartment enclosure, including room, ancillary room and stair case. Fire simulations were conducted for the air-leakage test facility, which was constructed to measure the effective leakage area and aimed to improve the understandings of fire and smoke movement by analyzing the overall behaviors of fire smoke flow and pressure distributions of each compartment. The simulation results showed that the heat release rate of the fires was controlled sensitively by the amount of air supplied by the ventilation system. An analysis of the velocity distributions between the room and ancillary room showed that fire smoke could be leaked to the ancillary room through the upper layer of the door, even under pressurized air supply conditions. From these results, it was confirmed that the fire size and spatial characteristics should be considered for the design and application of a smoke control system by a pressurized air supply.

A Study on the Earthquake Safety Assessment of Energy Storage Facilities According to Climate Change (기후변화에 따른 에너지 저장시설 지진 안전성평가에 관한 연구)

  • Ham, Eun-Gu;Lee, Sung-Il
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.2
    • /
    • pp.226-235
    • /
    • 2021
  • Purpose: The risk assessment for earthquakes was conducted in accordance with the current design standard (KBC2016) for the Coalescer facility, which is a major facility of energy storage facilities. Method: The risk assessment for earthquakes was conducted in accordance with the current design standard (KBC2016) for the Coalescer facility, which is a major facility of energy storage facilities. Result: In this study, by statically loading earthquake loads and evaluating the level of collapse prevention of special-class structures, facility managers can easily recognize and evaluate the risk level, and this analysis result can be applied to future facility risk management. Earthquake analysis was performed so that. Conclusion: As a result of analyzing the Coalescer facility according to the current design standard KBC2016, the stress ratio of the main supporting members was found to be up to 4.7%. Therefore, the members supporting Coalescer were interpreted as being safe against earthquakes with a reproducibility period of 2400 years that may occur in Korea.