• Title/Summary/Keyword: Fill-slope

Search Result 78, Processing Time 0.021 seconds

Transformation of Forest Road Fill-slope Alignment by Elapsed Years and Physical Properties (임도시공경과년수 및 물리적 인자에 따른 성토사면 선형의 변화)

  • Choi, Yeon Ho;Lee, Joon Woo;Kim, Myeong Jun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.2
    • /
    • pp.47-52
    • /
    • 2000
  • This study was carried out to analyze the effects of elapsed years and physical properties on fill-slope alignment of forest road. For the study, 21 forest roads in Puy$\check{o}$-gun and Asan-shi of Chungchungnam-do were selected and fifteen factors that might influence on fill-slope alignment were analyzed. The major forms of alignment of the fill-slope in the time of construction were concave and compound. But, with the elapsed years, the concave and compound forms have decreased and linear and convex forms have increased. And fill-slope alignment was strongly related with fill-slope distance, fill-slope gradient and ground gradient among the physical properties.

  • PDF

Characteristics of Soil Erosion on the Fill-slope of Forest Road by Elapsed Years after Road Construction (임도개설후 경과년수에 따른 임도 성토비탈의 토사침식 특성)

  • Woo, Bo-Myeong;Choi, Hyung-Tae;Lee, Seung-Hyun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.1
    • /
    • pp.1-9
    • /
    • 2000
  • The purpose of this study was to analyze the characteristics of soil erosion on the fill-slope of forest road by elapsed years after road construction. Thirteen plots were established on the fill-slope of the newly-constructed forest road, and surveyed for two years(1997~1998). In these plots, the data about soil erosion, surface runoff, vegetation coverage, slope structural characteristics and rainfall were collected. In 1997, the major causes for soil erosion were found by the correlation coefficients with the amount of surface runoff from the fill-slope, vegetation coverage, slope length, slope degree, total rainfall and max. 1 hour rainfall. But, in 1998, the major causes for soil erosion were vegetation coverage and slope degree. Using the stepwise multiple regression method, in 1997, the amount of soil erosion from the fill-slope was complexly expressed as a exponential function of statistically significant the amount of surface runoff from the fill-slope, total rainfall, slope degree of fill-slope and vegetation coverage, but, in 1998, simply expressed as a exponential function of vegetation coverage.

  • PDF

Development of Prediction Model for Fill Slope Failure of Forest Road (임도성토사면(林道盛土斜面)의 붕괴예측(崩壞豫測)모델 개발(開發))

  • Cha, Du Song;Ji, Byoung Yun
    • Journal of Korean Society of Forest Science
    • /
    • v.90 no.3
    • /
    • pp.324-330
    • /
    • 2001
  • This study was carried out to develop prediction model for fill slope failure of forest road in igneous rock area using fuzzy theory which is non-linear model. The results were summarized as follows. The importance weight of factors on fill slope failure was ranked in the order of fill slope length, fill slope gradient, soil type, aspect, road position and longitudinal slope form. The degree of potential slope failure was high mainly under the such conditions as fill slope length greater than 8m, fill slope gradients steeper than $40^{\circ}$, constituent material with weathered rock, aspect of NE and road on ridge position. The optimal prediction model was developed with 0.15 of optimal coefficient(c) and 3.1165 of ${\lambda}$-value when fuzzy integral value of slope failure possibility is more than 0.5. And the discriminant accuracy was 86.8%, which shows the high availability for discrimination.

  • PDF

Evaluation of Slope Failure Possibility on Forest Road Using Fuzzy Theory(I) - On the Fill Slope of the Metamorphic Rock Area - (Fuzzy이론(理論)을 이용(利用)한 임도사면(林道斜面)의 붕괴가능성(崩壞可能性) 평가(評價)(I) - 변성암지역(變成岩地域)의 성토사면(盛土斜面)을 중심(中心)으로 -)

  • Cha, Du Song;Ji, Byoung Yun;Oh, Jae Heun
    • Journal of Korean Society of Forest Science
    • /
    • v.89 no.1
    • /
    • pp.33-40
    • /
    • 2000
  • This study was carried out to evaluate the fill slope failure possibility of forest road in Metamorphic rock area using fuzzy theory which is non-linear model. The results were summarized as follows. The potential slope failure by nine factors was mainly occurred under the such conditions as the total road width ranging from 4m to 5m, longitudinal gradients below $2^{\circ}$, fill slope length greater than 8m, fill slope gradients steeper than $40^{\circ}$, road on ridge position, soil types with weathered rock, slope gradients steeper than $40^{\circ}$, aspect of NW, and longitudinal slope form in convexity. The weight of importance by factors on fill slope failure was ranked in the order of fill slope length, fill slope gradient, road position, soil type, aspect and longitudinal slope form. The analysis showed that the fill slope failure possibility was low with less than 0.485 of the fuzzy integral value and high with more than 0.620 of the value. And the discriminant accuracy was 74.6%. The analysis with six out of nine factors indicated that the possibility was low with less than 0.441 of the fuzzy integral value and high with more than 0.583 of the value. In this case, the discriminant accuracy was slightly increased to 78.0%.

  • PDF

Experimental Evaluation of the Moment Capacity of a Railway Electric Pole Foundation Adjacent to a Fill Slope (실물 재하시험을 통한 성토사면에 근접한 철도 전철주기초의 저항모멘트 평가)

  • Lee, Su-Hyung;Lee, Sung-Jin;Lee, Il-Wha
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.6
    • /
    • pp.5-17
    • /
    • 2012
  • The moment responses of electric pole foundations for a railway were investigated using real-scale load tests. Large overturning moments were applied to two circular rigid piles with a 0.75 m diameter and a 2.5 m embedded depth; the circular rigid piles were installed in an actual railway embankment fill. Two different loading directions-toward the fill slope and toward the track -were applied to evaluate the influence of the fill slope on the moment capacities of the foundations. It was found that the failure of the foundations that were constructed according to Korean railway practices exhibited a sudden overturning pattern without any significant pre-failure displacement. The moment capacity toward the fill slope was less than the moment capacity toward the track by 30%. From the test results, the geometry factor (K), which accounted for the reduction of the moment capacity, due to the fill slope, was 0.7. Moment capacities determined from the load tests were compared with those predicted from three existing design methods, and their applicability was discussed.

Evaluation and Prediction of Failure Factors by Quantification Theory(II) on Banking Slopes in Forest Road (수량화(數量化)II류(類)에 의한 임도(林道) 성토사면(盛土斜面)의 붕괴요인(崩壞要人) 평가 (評價) 및 예측(豫測))

  • Cha, Du Song;Ji, Byoung Yun
    • Journal of Korean Society of Forest Science
    • /
    • v.88 no.2
    • /
    • pp.240-248
    • /
    • 1999
  • On the basis of data obtained from five forest roads collapsed due to a heavy rainfall of 1995 in Chunchon, Kangwon-do, this study was carried out to evaluate and predict the fill slope failure of forest roads with four factors of forest road structure and those of location condition by using Quantification theory(II). The results were summarized as follows ; In the structure factors of forest road, the fill slope failure was mainly occurred in longitudinal gradients less than $2^{\circ}$ or more than $4^{\circ}$, distance of surface-flow longer than 80m, fill slope length greater than 6m, and fill slope gradients steeper than $35^{\circ}$. In the factors of location condition, the failure was mainly occurred in ridge portion of road position, weathered rock and soft rock of constituent material, slope gradients in the range from $35^{\circ}$ to $45^{\circ}$, and concave and convex of longitudinal slope forms. The priority order for factors influencing on fill slope failure was ranked by fill slope length, constituent material, road position, and so on. And the rate of correct discrimination by analysis of fill slope failure was estimated at the high prediction of 86.5%.

  • PDF

Seismic fragility assessments of fill slopes in South Korea using finite element simulations

  • Dung T.P. Tran;Youngkyu Cho;Hwanwoo Seo;Byungmin Kim
    • Geomechanics and Engineering
    • /
    • v.34 no.4
    • /
    • pp.341-380
    • /
    • 2023
  • This study evaluates the seismic fragilities in fill slopes in South Korea through parametric finite element analyses that have been barely investigated thus far. We consider three slope geometries for a slope of height 10 m and three slope angles, and two soil types, namely frictional and frictionless, associated with two soil states, loose and dense for frictional soils and soft and stiff for frictionless soils. The input ground motions accounting for four site conditions in South Korea are obtained from one-dimensional site response analyses. By comparing the numerical modeling of slopes using PLAXIS2D against the previous studies, we compiled suites of the maximum permanent slope displacement (Dmax) against two ground motion parameters, namely, peak ground acceleration (PGA) and Arias Intensity (IA). A probabilistic seismic demand model is adopted to compute the probabilities of exceeding three limit states (minor, moderate, and extensive). We propose multiple seismic fragility curves as functions of a single ground motion parameter and numerous seismic fragility surfaces as functions of two ground motion parameters. The results show that soil type, slope angle, and input ground motion influence these probabilities, and are expected to help regional authorities and engineers assess the seismic fragility of fill slopes in the road systems in South Korea.

A Case Study of Extra Reinforcement by Road Extension work on Existing Cut Slope Reinforced with Counterweight Fill and Stabilizing Piles (압성토 및 억지말뚝으로 보강된 도로의 확장공사로 인한 추가 보강사례 연구)

  • Park, Jeong-Yong;Kim, Woo-Seong;Kim, Jae-Kyoung;Yang, Tae-Sun;Na, Kyung-Joon
    • Journal of Korean Society of societal Security
    • /
    • v.1 no.2
    • /
    • pp.67-72
    • /
    • 2008
  • To confirm the stability of a cut slope in the road extension construction site, several investigations were carried out and countermeasures of slope was studied. This paper describes a study of design case of extra reinforcement on existing cut slope reinforced by preloading and piles in roads. To investigate the effect of stabilizing piles installed in a cut slope, an instrumentation system also designed, was. As a result that the stabilizing file and earth anchor are considered as the extra reinforcement, both stabilizing pile and earth anchor guarantee the stability of cut slope. However, stabilizing pile is selected in aspects of economy and continuity to the existing cut slop reinforcement including counterweight fill and stabilizing piles.

  • PDF

Behavior Analysis of Fill Slope by Vehicle Collision on Guardrail (가드레일에 차량 충돌 시 성토사면의 거동분석)

  • Park, Hyunseob;Ahn, Kwangkuk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.2
    • /
    • pp.67-74
    • /
    • 2014
  • Recently, the number of road construction is increasing by industrial development. According to this industrial tendency, the number of traffic accidents are consistently increasing due to increasing number of vehicle on the road. This is mainly because traffic accidents are occurred by various parameter such as negligence of driver, vehicle defects, state of unstable road, natural environment etc. Lane department of vehicles from guardrail is occurring frequently. This type of accident is caused by vehicle performance improvement and shape of vehicle, weak guardrail installation and maintenance. Guardrail has the purpose on prevention such as prevention of traffic accident and prevention of deviating out of road, minimizing damage of driver and vehicle by collision as well as entry into the road through guardrail. Stability evaluation test of guardrail verifies the behavior of guardrail through the crash of truck. At this time, the crash condition has 100 km/h of velocity and $15^{\circ}$ of impact angle. In the case of ground condition, filling slope condition has relatively high bearing capacity of infinite ground towards the test. Guardrail is generally installed on road of shoulder in fill slope in korea. It is possible for stability problem to deteriorate ground bearing capacity in Guardrail in fill slope. The existed study towards stability of guardrail has been carried out in the infinite ground. However, the study on the behavior of fill slope with guardrail is not performed by vehicle collision. Therefore, In this study, the numerical analysis using LS-DYNA was executed for verification on behavior of fill slope with guardrail through vehicle collision. This numerical analysis was carried out with change of embedded depth on installed guardrail post in shoulder of fill slope by vehicle collision and 8 tonf truck crash providing at NCAN (National Crash Analysis Center). As the result, displacement and stress on fill slope are decreased in accordance with the increase of embedded depth of guardrail post. Ground bearing capacity is deteriorated at depth of 450 mm form shoulder of road on fill slope.

A Study on the Roadside Slope of the Parkway in Chi-Ri Mountain National Park (智異山 國立公園 道路비탈면에 對한 조사 硏究)

  • Seo, Byung-Soo;Kim, Sei-Cheon;Lee, Chang-Heon;Park, Choung-Min;Lee, Kyu-Wan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.18 no.3 s.39
    • /
    • pp.39-56
    • /
    • 1990
  • The purpose of this study is to analyze the roadside slope of mountainous Parkway. 48 sites were selected by Random Ranking Sampling. This study was researched on the slope condition with the cause of occurrence, the situation of fundamental engineering works and vegetation on slopes. The main results of this research are summarized as follow ; 1. Slope shapes are shown nine types in cut slope and four types in fill slope. 2. Generally, fill slopes are larger than cut slopes in slop area. 3. Grade is more steep than standard grade. 4. Main engineering works, which constructed for slope stability, are terracing, side-ditch wall, channel, concrete trellis works and wire fence. 5. Roundabout channel were many constructed within the sector of Ukmojeong-Deokdong, but were few constructed within the sector of Banseon-Seongsam pass and Cheoneun Temple-Seongsam pass. 6. Most. of side-ditch wall were constructed of concrete and wet-masonry. 7. In vegetation works, many exterior species were selected. 8. Planting pattern was not combinated with the national park landscape.

  • PDF