• 제목/요약/키워드: Fill dams

Search Result 67, Processing Time 0.021 seconds

Application of GeoWEPP to determine the annual average sediment yield of erosion control dams in Korea

  • Rhee, Hakjun;Seo, Junpyo
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.4
    • /
    • pp.803-814
    • /
    • 2020
  • Managing erosion control dams requires the annual average sediment yield to determine their storage capacity and time to full sediment-fill and dredging. The GeoWEPP (Geo-spatial interface for Water Erosion Prediction Project) model can predict the annual average sediment yield from various land uses and vegetation covers at a watershed scale. This study assessed the GeoWEPP to determine the annual average sediment yield for managing erosion control dams by applying it to five erosion control dams and comparing the results with field observations using ground-based LiDAR (light detection and ranging). The modeling results showed some differences with the observed sediment yields. Therefore, GeoWEPP is not recommended to determine the annual average sediment yield for erosion control dams. Moreover, when using the GeoWEPP, the following is recommended :1) use the US WEPP climate files with similar latitude, elevation and precipitation modified with monthly average climate data in Korea and 2) use soil files based on forest soil maps in Korea. These methods resulted in GeoWEPP predictions and field observations of 0 and 63.3 Mg·yr-1 for the Gangneung, 142.3 and 331.2 Mg·yr-1 for the Bonghwa landslide, 102.0 and 107.8 Mg·yr-1 for the Bonghwa control, 294.7 and 115.0 Mg·yr-1 for the Chilgok forest fire, and 0 and 15.0 Mg·yr-1 for the Chilgok control watersheds. Application of the GeoWEPP in Korea requires 1) building a climate database fit for the WEPP using the meteorological data from Korea and 2) performing further studies on soil and streamside erosion to determine accurate parameter values for Korea.

Characteristics of shear strength of coarse-grained materials using large triaxial test equipment (대형삼축시험 장비를 이용한 조립재료의 전단강도 특성)

  • Jin, Guang-Ri;Snin, Dong-Hoon;Im, Eun-Sang;Kim, Ki-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1017-1024
    • /
    • 2009
  • In the past few decades, the rockfill embankment dam, which has superior workability and economy, has become a major trend. In Korea, most of the embankment dams are rockfill dams, but recently, in response to the demand for sustainable development and environmentally-friendly water resource development, the sand and gravel in streams has become a major construction material for dams, rather than the non-economic rockfill, and its application examples have also increased. In this study, a large triaxial test was performed, with construction samples of different maximum sizes, in parallel with the grading method at the 'B Dam' construction site in Korea, and the effects of the different maximum sizes on the strain of the dam construction material and on the shear strength characteristics were analyzed to provide the basic data for determining the strength characteristics of the coarse-grained materials by the maximum size.

  • PDF

Feasibility of Choryeong Tunnel and Han River Section in Kyungbu Canal (경부운하 한강구간 및 조령터널의 입지 타당성분석)

  • 정태웅
    • The Journal of Engineering Geology
    • /
    • v.7 no.1
    • /
    • pp.1-10
    • /
    • 1997
  • The construction of Kyungbu canal connecting Han and Naktong rivers is needed to facilitate the carriage of goods and enhance the economic growth. The two rivers are liflked by the Choryeong tunnel with 20.5 km length and 125 m altitude. Seven locks involving of 25 m lifting height are planned to reach the tunnel from Shingok dam along the Han river. The tunnel and dams are located favorably by topographic and geologic map analysis. The water needed to fill the chamber of high lock will he supplied by construction of additional dams above Chungju-dam and/or intmduction of water-saving lock system.

  • PDF

A Comparative Study on Geotechnical System Response Probabilities of Fill Dams in Korea Using Internal Erosion Toolbox (내부 침식 평가 도구를 이용한 국내 필댐의 지반공학적 시스템 응답 확률에 대한 비교 연구)

  • Kim, Woo-Yong;Lim, Jeong-Yeul;Mok, Young-Jin;Jung, Young-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.245-258
    • /
    • 2016
  • In this study the geotechnical system response probabilities (SRP) of the failure modes caused by the interal erosion in three dams with different histories of defects in Korea were analyzed via the internal erosion toolbox developed by USACE. The calculated values of SRP were compared with the values reported for other dams in worldwide and also the statistics on the past failures of dams and embankments in Korea. The calculated values of SRP related to the internal erosion adjacent to the conduits or spillway structures are as high as in the order of $10^{-5}$ that is significantly greater than the SRP values related to other mechanisms of internal erosion. The statistical data showing that the interal erosion adjacent to the structure is the most frequent cause of the failure of the dam in Korea could be a collateral evidence of this finding. In contrast, the values of SRP related to the internal erosion through foundation, one of the major causes of dam failure in worldwide, are relatively as low as in the order of $10^{-7}$. This result could be comparable with the rareness of the failure cases of dam caused by the internal erosion through foundation in Korea.

Effect analysis by time passage after Repair & Reinforcement of Fill Dams (필댐 보수보강후 시간경과에 따른 효과 분석)

  • Kim, Jae-Hong;Oh, Byung-Hyun;Im, En-sang;Hong, Won-Pho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.697-703
    • /
    • 2008
  • Excessive water leakage phenomenon happens through damage of nation core zone of about 17,000 storage of water facilities or collapse of dam is worried, is being damaged or enforce dilapidated fill dam core zone's repair reinforcement. Example that use grouting method of construction considering construction and economic performance etc. recently by repair reinforcement way about defect of dam is increased. Permeation grouting method repair & reinforcement of fill dam countermeasure is preferred in nation. Do that is economical to decide these repair reinforcement effect and grouting effect estimation method that do not give damage to dam is effective. Therefore, observing electricity resistivity Survey change of dam since grouting reinforcement using Electric resistivity Survey inquiry of seismic survey method in this research, Wished to verify grouting effect whether is possible as Electric resistivity Survey, and study whether integrity of dam through repair reinforcement defined.

  • PDF

A Study on the Behaviour of an Earth and Rockfill Dam Due to Reservoir Water (저수변화에 따른 사력댐의 거동 연구)

  • Shin, Jong-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.61-70
    • /
    • 2003
  • The behaviour of an earth and rock-fill dam is complicated due to reservoir water and various materials in zoned dams. Different materials with a wide range of permeability and seasonal variation of reservoir water result in the time dependent post-constructional behaviour. In aged dams it is often required to control water level to keep the dams safe. In this case information on the post-constructional dam behaviour is important. However, present geotechnical knowledge does not fully support the occasion. In this study the post-constructional behaviour of a dam is investigated using coupled finite element models for series of idealized water reservoir cases: impoundment, draw down, seasonal fluctuation with different rising and falling speeds. Numerical results were analysed in respect of geotechnical parameters such as load transfer, hydraulic fracturing potential and stress paths. It is shown that the control of water level is an important factor while operating dams.

Assessment of The Priority Order of Monitoring Devices on Maintenance for The Long-Term Safety of Existing Fill Dam (기존 필댐 장기간 안전관리를 위한 계측항목 유지보수 우선순위 산정)

  • Lee, Jongwook;Jeon, Jaesung;Lim, Heuidae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.67-79
    • /
    • 2009
  • Although readjustment of monitoring system for existing fill dam maintenance is needed by the sustainable increasing of the abandonment rate of monitoring devices by malfunction through the life-cycle of dam, monitoring plans for long-term dam safety has relied on the experience and the opinion of minor expert group without systematic and quantitative analysis on the failure modes and the priority order of monitoring devices on maintenance. In this study the priority order of monitoring devices of existing 5 fill dams was evaluated quantitatively based on the preceding study (Andersen et al, 1999) and the result recommended the establishment of real-time monitoring system for seepage, pore pressure and crest settlement as the readjustment plan for existing fill dam monitoring system. This readjustment plan matches well with the recommendation of PWRI (1984), JCOLD (1986) and the results from Bagherzadeh-Khakkahali and Mirghasemi (2005).

  • PDF

Permeation Grouting Effect for Repair and Reinforcement of Old Dam (노후댐 보수보강을 위한 침투그라우팅 효과 분석)

  • LEE, Dong-Beom;Lim, Heui-Dae;Song, Young-Su
    • The Journal of Engineering Geology
    • /
    • v.28 no.2
    • /
    • pp.277-295
    • /
    • 2018
  • As it has become difficult to secure new water resources through dam construction due to the critical social public opinions on dam construction from 10 years ago, it is necessary to review the existing water resources through the review of existing dams. Accordingly, access methods, such as planning, construction and management, were carried out using technologies already accumulated in relation to the repair and reinforcement of the dam. As a result of the repair and reinforcement, permeation grouting has been performed in many dams, but the establishment of the technology is insufficient so far, and the published paper at home and abroad is extremely rare. In this thesis, low-pressure penetration and grouting reinforcement technologies for the YC dam are analyzed in detail. As a result, penetration grouting has shown that it can be effectively applied to the improvement in the constallability of the core fill-like a YC dam. In addition, the technical details of the experience-proven penetration grouting are given in relation to the injection criteria. It is deemed that the specific analysis data of the Fill Dam penetration grouting technology through this study can be used as useful data for strengthening the repair of Fill Dam and reservoir.

A Study on the Criteria for the Earthquake Safety Evaluation of Fill Dams (필댐의 내진 성능 평가 기준에 대한 고찰)

  • Choo, Yun-Wook;Lee, Sei-Hyun;Kim, Mu-Kwang;Kim, Dong-Soo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.15 no.6
    • /
    • pp.19-31
    • /
    • 2011
  • The current Korean criteria for seismic performance evaluated by dynamic analysis regulates that the horizontal displacement and vertical settlement of a dam body, including the static deformation, should be within 1% of the dam height. However, there has been weak theoretical support, so that the current criteria have to be validated. Korea is in a region of low or moderate seismicity located inside the Eurasian plate, and few earthquakes with considerable magnitudes and intensities have been recorded in the area. Therefore, in this study, published data measured in overseas countries were collected in order to construct a database and validate the current criteria. In addition, dynamic centrifuge tests and a parametric study using numerical simulations were performed in order to investigate the effect on the horizontal displacement and settlement of a dam body and to validate the current criteria.

Evaluation of Vs profile of Rock-fill Zone using Seismic Surface wave Method (표면파 탐사 기법을 이용한 락필댐 사력재의 전단파 속도 획득)

  • Kim, Jong-Tae;Park, Heon-Joon;Kim, Gyeong-Seob;Kim, Dong-Soo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2008.10a
    • /
    • pp.101-106
    • /
    • 2008
  • It is very important to measure reliable properties of each zones in dam for seismic design. But, rock-fill zone which have 80% of total volume and support maintenance mainly during earthquake has little property by field test and seismic design was performed using assumed value. So, it is required that reliable properties have to be evaluated by in-situ test. In this study, surface wave method, which is nondestructive such as SASW and HWAW, was applied to dam to evaluate rock-fill zone of dam. In 2 dams, Vs profiles were evaluated reliably and possibility of suggestion of D/B was verified.

  • PDF