• Title/Summary/Keyword: File Deployment

Search Result 22, Processing Time 0.016 seconds

A Study on the Practical Application of Image Control Point Using Stereo Image Chip (입체 영상칩을 이용한 영상기준점 활용방안에 관한 연구)

  • Kim, Hoon-Jung;Kim, Kam-Lae;Cheong, Hae-Jin;Cho, Won-Woo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.4
    • /
    • pp.423-431
    • /
    • 2008
  • The control surveying which aims at identifying the coordinate system of satellite images with that of ground is a repeatedly performed essential process to produce digital ortho - photos and it acts as the main factor to increase the production cost of the photos by duplicated budgets and redundant works when executing the projects for acquiring basic geographical information from high density satellite images. During the experimentation, an application system was established for producing a stereo image chip by the analysis of DPPDB file structure, the stereo image chip was produced with SPOT and IKONOS images, the analysis of 3D modeling accuracy was performed to secure the required accuracy and to present the optimal number and deployment of the control points, and a 3D modeling was performed for new SPOT images and lastly, 3D ground coordinates were extracted by the observation of the same points through the overlapping with the new images. As the results of the research, it is proved that the stereo image chip can be used as the ground controls through the accuracy analysis between the coordinates of the images and the ground, close results were obtained between the coordinates by the ground survey and those by the 3D modeling using new images and the observation of the same points, positional changes were not found during observing the same points, and the research presented the methodology for improving the process of the control survey by showing the availability of the image controls on the stereo image chip instead of the ground controls.

NUWARD SMR safety approach and licensing objectives for international deployment

  • D. Francis;S. Beils
    • Nuclear Engineering and Technology
    • /
    • v.56 no.3
    • /
    • pp.1029-1036
    • /
    • 2024
  • Drawing on the deep experience and understanding of the principles of nuclear safety, as well as many years of nuclear power plant design and operation, the EDF led NUWARD SMR Project is developing a design for a Small Modular Reactor (SMR) of 340 MWe composed of two 170 MWe independent units, that will supplement the offering of high-output nuclear reactors, especially in response to specific needs such as replacement of fossil-fuelled power plants. NUWARD SMR is a mix of proven and innovative design features that will make it more commercially competitive, while integrating safety features that comply with the highest international standards. Following the principles of redundancy and diversity and rigorous application of Defence in Depth (DID), with an international view on nuclear safety licensing, the Project also incorporates new safety approaches into its design development. The NUWARD SMR Project has been in development for a number of years, it entered conceptual design formally in mid-2019 and entered Basic Design in 2023. The objective of the concept design phase was to confirm the project technological choices and to define the first design configuration of the NUWARD SMR product, to document it, in order to launch pre-licensing with the French Safety Authority (ASN) and to define its estimated cost and its subsequent development and construction schedules. As a delivery milestone the Safety Options file (called the Dossier d'Options de Sûreté (DOS)) has been submitted to ASN in July 2023 for their opinion. An integral part of the NUWARD SMR Project, is not only to deliver a design suitable for France and to satisfy French regulation, but to develop a product suitable and indeed desirable, for the international market, with a first focus in Europe. In order to achieve its objectives and realise its market potential, the NUWARD SMR Project needs to define and realise its safety approach within an international environment and that is the key subject of this paper. The following paper: • Summarises the foundation principles and technological background which underpin the design; • Contextualises the key design features with regard to the international safety regulatory framework with particular emphasis on innovative passive safety aspects; • Illustrates the Project activities in preparation for first licensing in France, and also a wider international view via the ASN led Joint Early Review of the NUWARD SMR design, including Finnish and Czech Republic regulators, recently joined by the Swedish, Polish and Dutch regulators; • Articulates the collaborative approach to design development from involvement with the Project partners (the Commissariat à l'énergie atomique et aux énergies alternatives (CEA), Naval Group, TechnicAtome, Framatome and Tractebel) to the establishment of the International NUWARD Advisory Board (INAB), to gain greater international insight and advice; • Concludes with the focus on next steps into detailed design development, standardisation of the design and its simplification to enhance its commercial competitiveness in a context of further harmonisation of the nuclear safety and licensing requirements and aspirations.