DEVELOPMENT OF MOBILE APPLICATION BASED RFID AND BIM FOR DEFECT MANAGEMENT ON CONSTRUCTION FIELD

  • Oh-Seong Kwon;Hwi-Gyoung Ko;Hee-Taek Park;Chan-Sik Park
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.7-13
    • /
    • 2013
  • Recently, defect management have been considered as one of the major issues for more large-sized and complicated in domestic construction industry. However, the defect management have not been performed systematically because of special manpower, excessive amount of documents, 2D based inspection work, unclear traditional checklists, complicated work process and difficulty in communicating construction information. Therefore, the construction field manager could not performed the quality inspection and defect management work on time as well as the reliability of recorded quality and defect factors was decreased. The primary objective of this study is develop a Construction Defect Management Application CDMA) using a mobile (smartphone). The application can be sharing a huge information and communication technology based on RFID (Radio-Frequency Identification), BIM (Building Information Modeling) which enables field mangers to efficiently gather the information of defection in construction on-site.

  • PDF

린(Lean) 건설 개념을 도입한 TPMS 시스템에 대한 소개 (Introducing TPMS on applying Lean Construction)

  • 박찬정;정희원;김상철
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.150-153
    • /
    • 2006
  • GS건설은 업계 최초로 EVMS(Earned Value Management System) 관리기법을 바탕으로 공정과 손익을 관리하는 통합 공사관리 시스템인 PMS (Project Management System)을 개발, 1997년부터 전 현장에 적용하여 왔으며, 최근에는 현장업무를 중심으로 일 단위 공정관리 기법 적용과 자재, 인력, 장비의 적시 투입(JIT, Just in Time)을 통하여 보다 효과적인 공사관리를 할 수 있도록 시스템의 지원을 실현하기 위해 TPMS(Total Project Management System)로 확대 구축 중에 있다. TPMS는 린 건설의 주요 사상인 Shielding(할 수 있는 일만 지시하라)과 Make-Ready Process(할 수 있는 일이 많아지도록 "사전준비"를 철저히 하라)를 구현하고 있으며, 이를 통해 현장에서 실제로 진행하고 있는 하루하루의 업무를 시스템에서 계획하고 관리할 수 있도록 구축하고, 그날의 업무진행에 관계된 자재, 인력, 장비의 계획과 실행을 지원하여, 비 가치창출 과정을 최소화하는 역할을 담당하고 있다. 본 자료는 GS건설에서 현재 구축한 TPMS의 개념을 소개하고, 이를 실제 구축한 사례를 보여줌으로써, 새로운 건설문화를 선도하고, 건설산업의 경쟁력을 높이는 데 일조 하고자 한다.

  • PDF

신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 - (Improvement method of process management on new han-ok style public building project)

  • 서정승;김영훈;곽동엽
    • KIEAE Journal
    • /
    • 제17권3호
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

신개념 마이크로파일 개발 및 현장시험시공 (Development of New Micropiling Technique and Field Installation)

  • 최창호;구정민;이정훈;조삼덕;정재형
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.571-578
    • /
    • 2009
  • Recently, micropiling techniques are increasingly applied in foundation rehabilitation/underpinning and seismic retrofitting projects where working space provides the limited access for conventional piling methods. Micropiling techniques provide environmental-friendly methods for minimizing disturbance to adjacent structures, ground, and the environment. Its installation is possible in restrictive area and general ground conditions. The cardinal features that the installation procedures cause minimal vibration and noise and require very low ceiling height make the micropiling methods to be commonly used for underpin existing structures. In the design point of view, the current practice obligates the bearing capacity of micropile to be obtained from skin friction of only rock-socketing area, in which it implies the frictional resistance of upper soil layer is ignored in the design process. In this paper, a new micropiling method and its verification studies via field installation are presented. The new method provides a specific way to grout bore-hole to increase frictional resistance between surrounding soil and pile-structure and it allows to consider the skin friction of micropiles for upper soil layer during design process.

  • PDF

Top-Down 공사의 공정관리 방법 연구 (A Study on the Construction Process Management of the Top-Down Construction Method)

  • 강현정;임홍철;이강;윤대중;김상일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.133-136
    • /
    • 2006
  • The top-down construction method is an excavation and substructure construction method by excavating earth and building slabs from the ground level to the bottom of a building. The top-down method can be categorized into several types by its process and other technical details. Some of commonly used top-down methods in Korea today are S.O.G., N.S.T.D., and S.P.S. Among these, one method is chosen depending on construction field conditions, cost, construction time and so on. This study explores several factors that may affect the selection of a top-down method. This paper reports preliminary survey results with 54 top-down construction experts and comparison results of 5 top-down construction sites.

  • PDF

조강콘크리트를 사용한 구조물의 공기단축 관련 현장적용에 관한 연구 (A Study on Field Application of Early Strength Concrete for Construction Work Period Reduction)

  • 김민정;김동진;이상호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2009년도 춘계 학술대회 제21권1호
    • /
    • pp.155-156
    • /
    • 2009
  • 본 연구에서는 자사에서 실시 된 관련 연구의 조강콘크리트 시험결과를 근거로 이를 현장에 적용하기 위하여 공기단축에 의해 발생될 수 있는 공정 및 장비 변경, 공사에 소요되는 금융비용 절감 효과를 검토하였다.

  • PDF

철골공사 현장조사를 통한 설계프로세스 개선방안 (The Improvement Plan of Design Process by Case Study of Steel Structural Work)

  • 방성원;오승준;김진호;임남기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.121-126
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying tine and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

  • PDF

현장조사를 통한 철골공사 설계프로세스 개선방안 (The Improvement Plan of Design Process by Case Study of Steel Structural Work)

  • 방성원;김진호;임남기
    • 한국건축시공학회지
    • /
    • 제3권2호
    • /
    • pp.111-118
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying time and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

의복구성분야 교육과정 비교분석을 통한 패션산업 활성화 방안 -4년제 국내 대학을 중심으로- (Comparative Analysis of Domestic University's Curriculum in the Field of Clothing Construction for Activating Fashion Business)

  • 홍성애;이진희
    • 한국의류학회지
    • /
    • 제35권11호
    • /
    • pp.1399-1408
    • /
    • 2011
  • This study analyzes the current educational curricula in the field of clothing construction to provide some fundamental information for developing more appropriate educational courses and to activate the fashion business. A total of 82 different departments related to fashion and apparel were selected from four-year domestic universities and the curricula recently posted on their internet websites were analyzed by descriptive statistics. More than half (53.7%) of the 82 departments were offering classes in the clothing construction field for 3 credits and 4 class hours. College affiliation of the departments that offered curricula in the clothing construction field was classified into 5 categories: the arts (34), human ecology (22), natural sciences (14), humanities/culture (9), and others (3). Human ecology category showed the highest results in the average class hours (3.9), the number of classes in the clothing construction field (7.6), and the percentage of the classes in the clothing construction field out of all major classes offered by the clothing department (19.9%). All 82 departments were classified into 3 categories of: fashion design (32), clothing (28), and fashion business (22). The clothing category showed the highest results in the average credits (2.8), class hours (3.8), the number of classes offered by the clothing construction field (7.6), and the percentage of the classes that offer clothing construction education out of all major classes offered by the clothing department (19.9%). The educational contents of clothing construction area were classified into 8 different categories of: basic theory and sewing, clothing construction, flat pattern, draping, tailoring and advanced clothing construction, pattern CAD, sewing science and apparel manufacturing process, and clothing construction for special needs. Among these categories, the draping category constituted 21.7% as the largest part. In addition, the distribution of classes offered by 4 academic years were analyzed into 8 different categories.

건설 시뮬레이션과 베이시안 기법을 이용한 공정관리 데이터베이스 구축 (Database Development For Efficient Construction Process Management Using Construction Simulation Technique and Bayesian Approach)

  • 고용호;박민하;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.94-95
    • /
    • 2014
  • Construction industry has become higher, larger and more complicated. It has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly and some were made based on historical data. However, such plans have been investigated that require numerous revisions during construction which means that the plans made through such methods are not reliable. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to overcome such limitations. It has been analyzed that many studies have focused on suggesting prediction models only that cannot be used for both actual planning prior to construction and process monitoring during construction. Therefore, this study suggests a methodology that effectively manages construction productivity by applying simulation methodology combined with bayesian approach focusing on the high-rise curtain wall operations.

  • PDF