• Title/Summary/Keyword: Feasibility rate

Search Result 1,230, Processing Time 0.024 seconds

Analyzing an Economic Feasibility for Restoration/Creation of Artificial Tidal Flats (인공갯벌 조성에 관한 경제적 타당성 분석)

  • Nam, Kwang-Hyun;Oh, Wee-Yeong
    • Ocean and Polar Research
    • /
    • v.25 no.4
    • /
    • pp.593-601
    • /
    • 2003
  • The purpose of this paper is to investigate economic feasibility of creating artificial tidal flats using cost-benefit analyses. We assumed that the cost factors are associated with designing, construction and monitoring, and the benefit factors are associated with fisheries production, habitation, prevention of disasters, water purification, aesthetic value and existence value. First, for analyzing economic feasibility, the scenario suggests that a design can be made in a year, construction can be completed in three years and monitoring must be made for 20 years. Assuming the discount rate of 7.5%, economic feasibility analyses showed that B/C was 2.26 and IRR was 14.50. This study indicated there is economic validity of implementing creation of artificial tidal flat. In addition, we carried out a sensitivity analysis at the change of discount rate and restoration rate. The result of sensitivity analysis clearly showed that economic validity is low when discount rate is over 15%, and changes in restoration rate did not significantly effect on the economic validity.

Economic Feasibility of Automatic Egg Washer (계란 자동세척기의 경제적 타당성 평가)

  • Lin, Qing-Long;Yeo, Jun-Ho
    • Current Research on Agriculture and Life Sciences
    • /
    • v.32 no.3
    • /
    • pp.165-169
    • /
    • 2014
  • This study assessed the economic feasibility of an automatic egg washer. Based on various cost benefit analysis methods, including the net present value (NPV), internal rate of return (IRR) and benefit cost ratio (B/C Ratio), the automatic egg washer was confirmed to have economic feasibility. The NPVs were 38,565,991 won at 5% discount rate and 32,013,916 won at 10% discount rate, respectively. The IRRs were 1.325 at 5% discount rate and 1.299 at 10% discount rate, respectively. Finally, the B/C ratios were 1.726 at 5% discount rate and 1.699 at 10% discount rate.

A Study on Feasibility Analysis of Sewer Rehabilitation (하수관거 정비사업의 타당성 분석에 관한 연구)

  • Han, Ihnsup;Chang, Daehwan;Woo, Byungha;Lim, Chulhwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.1
    • /
    • pp.89-96
    • /
    • 2009
  • Feasibility which is complimented before Social Overhead Capital Project and National Policy Project is analyzed by economic and political benefits. The projects will be performed if the benefits are bigger than the project cost. In this study, feasibility was examined at various viewpoints on sewer rehabilitation projects implemented with private capitals. To achieve the feasibility analysis, the B/C (Benefit/Cost Ratio), IRR (Internal Rate of Return) and the returns ratio of the Build Transfer Lease project implemented in 2007 at W city were estimated. At the same time, the correlation with B/C and benefit sensitivity of concessionary rate fluctuation were analyzed to evaluate the efficiency and feasibility of the seven sewer rehabilitation projects promoted by a local autonomous entity.

Application Method of the Financial Feasibility study of New Hotels (신규호텔의 재무타당성분석의 적용방안)

  • Choi, Bok-Soo
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.1
    • /
    • pp.407-416
    • /
    • 2009
  • It is evident that a financial feasibility study based on the economic analysis has been theoretically and practically accepted in the aspect of its adequacy. However, it is not easy to apply in the practical business affairs since there exist some difficulties on the economic analysis and the interpretation of the result because of the difficulty of the estimation of the discount rate. This study aims to suggest a method of the financial feasibility study based on the economic analysis. The results of this study are as follows. First, this study can increase the reliance and adequacy of the economic analysis result by suggesting a method of estimating the discount rate by means of the proxy ${\beta}$ method in the practical way. Second, this study can provide the overall frame of the financial feasibility study based on the economic analysis method (namely, Net Present Value Method internal rate of return, profit index method and payback period method)which use discount rate and cash flow. Third, this study can suggest an practical analysis skill required in each step of the financial feasibility study.

A Study of Feasibility Study on Construction a Public Library (공공도서관 건립 타당성 조사에 관한 연구)

  • Lee, Sang-Bok
    • Journal of Korean Library and Information Science Society
    • /
    • v.35 no.4
    • /
    • pp.491-516
    • /
    • 2004
  • The purpose of this study is to analyze the approach of economic feasibility and political and technical feasibility in the construction of a new public library. The results show that the cost-benefit analysis using in economic feasibility have the problems of benefit counting and discount rate, and also political and technical feasibility have the problems of wrong use in the rationalization of construction project. The result of this study is expected to be useful in preparing the feasibility study.

  • PDF

An Economic Feasibility Analysis of Custom Work Service - Case of Bonghwang-myeon, Naju City - (농작업 대행사업 경제성 분석 - 나주시 봉황면 사례를 중심으로 -)

  • Lee, Jeong-Min;Shin, Seung-Yeoub
    • Journal of Agricultural Extension & Community Development
    • /
    • v.28 no.4
    • /
    • pp.167-174
    • /
    • 2021
  • This study analyzed the feasibility of custom work service to deal with the imbalance of farm labor supply due to population aging. The economic feasibility analysis is based on the case of Bonghwang-myeon in Naju-si, where the majority of farm work is entrusted to local agricultural cooperative. To assess the project profitability and economic feasibility based on the projected cash flow for the next ten years, Return On Investment (ROI), Net Present Value (NPV), and Internal Rate of Return (IRR) of the projects were calculated. The results showed that ROI is estimated at 13.7%, and NPV and IRR are KRW 1,504,932,000 and 15.6%, respectively, with a discount rate of 4.5%, indicating a good enough profitability. Furthermore, a sensitivity analysis with government support as part of an assumption showed that without the support, NPV turns negative, implying that the project is not profitable, and that government support for at least 30% of the cost is needed to secure the economic feasibility of a project. Hence, to promote agricultural work entrustment, it is necessary for the government to partly support the agricultural machinery and facility costs, which require a considerable amount of initial investment.

A Study on the Business Feasibility of Marine Leisure Ship

  • Jung-Suk Choi;Kyoung-Hoon Choi
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.3
    • /
    • pp.288-295
    • /
    • 2023
  • The purpose of this study is to evaluate the feasibility of the new marine leisure ships. In order to achieve the research purpose, the cost and income were calculated based on the operating of other marine leisure ships, and the feasibility of the project was empirically analyzed. This study established a research model that applies the values derived by empirically analyzing ships with similar specifications, to the new marine leisure ships. We then calculated the cost-benefit analysis, net present value, and internal return, and evaluated the feasibility of the project based on this. As a result of the business feasibility analysis of investing in marine leisure ship, it was found that economic feasibility exists with a B/C of 1.042 and 1.049 for new and secondhand ships, respectively; however, considering the stability of the ship and the publicity and continuity of the business operation, it is recommended to invest in new ships compared to secondhand ships. The total benefit over the 10-year operating period using a social discount rate of 4.5% was evaluated to be about KRW 292.0 billion, which is higher than the total cost of KRW 256.6 billion. In conclusion, the profitability analysis showed that the B/C was 1.042, the NPV was KRW 193 billion, and the IRR was 2.1%, which indicates that profitability is weakly secured.

An Economic Feasibility Study of Mackerel Offshore Aquaculture Production System (고등어 외해가두리양식의 경제성 분석)

  • Kim, Do-Hoon
    • The Journal of Fisheries Business Administration
    • /
    • v.43 no.3
    • /
    • pp.23-30
    • /
    • 2012
  • This study aimed to analyze the economic feasibility of Mackerel offshore aquaculture production performance in Jeju region, Korea. Based on the collected biological, costs and market price data, farming revenue and expenses during the farming period were evaluated, and the net present value and the internal rate of return of a 10-year cash inflow and cash outflow were estimated to determine the economic feasibility of Mackerel offshore aquaculture production system. Model results indicated that the Mackerel offshore aquaculture production performance would have high profitability under the current production and market situation. This is because of the relatively high survival rate, relatively low feed conversion ratio and good market prices. However, sensitivity analyses of main important biological and economic variables showed that the economic viability of Mackerel offshore aquaculture production system would be highly vulnerable to production and market condition changes.

The Feasibility Analysis of 9.9 MW Biomass Cogeneration System (9.9MW급 바이오매스 열병합발전 타당성 연구)

  • Choi, Jaiyoung;Shul, Yonggun
    • New & Renewable Energy
    • /
    • v.10 no.2
    • /
    • pp.40-47
    • /
    • 2014
  • This study is intended to analyze the appropriate scope for 9.9MW biomass cogeneration, feasibility and sensitivity according to changing market situation. In the study, the heat load is classified into three types to predict heat sales and find out the appropriate scope of thermal business that is operated in CHP 34.42 Gcal/h, PLBwg 70 Gcal/h of cogeneration. the feasibility is estimated based on internal rate of return (IRR) and net present value(NPV). the sensitivity is analyzed in terms of biomass fuel cost, unit price of heating cost, investment cost, SMP unit price and REC unit price.

Economic Feasibility of Circulating Fluidized Bed Combustion Boiler Power Plant for Low Grade Coal (저급탄용 순환유동층 보일러 발전설비의 경제성 평가)

  • Hong, Min-Pyo;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.8 no.1
    • /
    • pp.73-80
    • /
    • 2012
  • The structure and combustion characteristics, and the economic feasibility of the circulating fluidized bed combustion(CFBC) boiler using low grade coal were introduced. The economic feasibility is evaluated by comparing a 500 MW CFBC boiler power plant using low grade coal and a pulverized combustion boiler power plant with high grade coal. As the result of the evaluation, the pulverized coal combustion boiler power plant has an internal rate of return of 12.95%, 1,395.9 billion Korean won of net present value, and 6.26 years of payback period. On the other hand, CFBC boiler power plant has an internal rate of return of 13.54%, 1,704.3 billion Korean won of net present value, and 6.02 years payback period. Therefore, the CFBC boiler power plant has better feasibility in all aspects, as 0.59% higher of internal rate of return, 308.4 billion Korean won of higher net present value and 0.24 year of shorter payback period.

  • PDF