International conference on construction engineering and project management
/
2007.03a
/
pp.820-829
/
2007
This paper presents an evaluation of feasibility studies conducted to justify investments in infrastructure projects. An analysis of a previous feasibility study for a highway construction project is presented in this paper with an emphasis on the estimates and forecasts presented in that study in order to weigh expected benefits from the project against expected costs. The forecasted numbers are compared with actual data collected during the operation phase about the usage of the facility. The comparison reveals a huge difference between estimated numbers and actual numbers. Based on the lessons learned from the analyzed case study, recommendations are presented to improve feasibility studies for infrastructure projects including: peer review of feasibility studies; before-and-after feasibility studies; and defined scope and methodology for feasibility studies. Decision makers are advised to take outcomes of feasibility studies for infrastructure projects with extreme caution as some studies may provide erroneous and misleading input to their decisions regarding investment in infrastructure projects.
Eom, Jin Ki;Lee, Kwang Sub;Lee, Jun;Moon, Dae Seop
International Journal of Railway
/
v.5
no.4
/
pp.144-147
/
2012
New transport technologies have been rapidly developed and various transport systems are ready to introduce. However, there no exists effective decision making tools for pre-feasibility studies on transport systems. The pre-feasibility studies should provide reliable solutions about whether a certain transport system is feasible or not by cost-benefit analysis and effectiveness test of enhancing regional economy. This study introduces the smart transport investment/information system (SMARTIS) for supporting decision making with ease, fast and reliable methods. The SMARTIS incorporates travel demand estimates into the process of feasibility studies with automatic data processing methods to give reliable solutions quickly. The SMARTIS is expected to be informative for transit agencies, planners, and operators.
On the contrary to the expansion of feasibility studies on public construction and development projects, there is few feasibility studies on S&T, especially large-scale basic research facilities. Based on this critical mind, we tried the first feasibility study on large-scale basic research facilities, that is, the 4th Generation Light Source. First, it is validated whether the construction of 4th Generation Light Source is economically feasible and second, if economically feasible, the optimal place and time for construction are analyzed by using Analytical Hierarchy Process. This research shows that the construction is economically feasible irregardless of scenarios on future bio-medicine industry growth and to construct at Pohang in 2006 is optimal strategy. On the basis of this analysis, the feasibility studies on large-scale basic research facilities are expected to be more expanded and developed.
The purpose of this study is to introduce in detail an universal methodology of wind resource and energy yield assessment for feasibility studies of offshore wind projects. To conduct a preliminary feasibility study for offshore wind projects, an assessment of wind resources and energy yield are usually performed at an early stage, and this can be an essential process for deriving an economic feasibility evaluation of the project. However, many domestic case studies and preliminary feasibility studies are still conducted using methodologies that lack valid evidence and professionalism. Accordingly, this study introduces methods for general wind resource assessments, wind farm layout (design), and energy yield assessments, and gives detailed reasons why the analysis procedure is necessary. In other words, it was carried out to support to improve the quality and level of basic research related to domestic offshore wind studies.
Before the Conference of Parties (COP) 21 of the United Nations Framework Convention on Climate Change (UNFCCC) in 2015, most parties of UNFCCC had submitted their intended nationally determined contributions (INDCs) and to achieve their voluntary targets, some parties consider using international market mechanisms. As one of such mechanisms, Japan promoted its own bilateral mechanism called Joint Crediting Mechanism (JCM). In this study, feasibility studies and projects under JCM have been analyzed by project type, sector, country and region, which could provide some implications in designing Korea's future climate policy to achieve Korea's targets of 11.7% using international market mechanism in INDC. Since 2010, JCM has promoted 542 projects and feasibility studies in 44 countries according to the Institute for Global Environmental Strategies (IGES) database. Among 542 projects, about 80% were feasibility studies implying that JCM was more focused on project identification. However, current trends of JCM show that more projects will be soon implemented based on these feasibility studies. For sectoral categorization, projects were categorized into seven sectors-energy technology, energy efficiency, renewable energy, waste management, city, strategic planning and projects related to the country's efforts to reduce emissions from deforestation and forest degradation (REDD+). JCM projects were mitigation focused with more than 70% of projects were related to energy efficiency, renewable energy and energy technology. At the regional and country level, JCM is highly focused on Asia and especially, more than 100 projects were developed in Indonesia. Based on the analysis of JCM, in order to develop bilateral international mechanism for Korea, it is worthwhile to emphasize that Korea considers Asian countries as her partner. In addition, Korea may consider the collaboration with Multilateral Development Banks (MDBs) to implement projects identified by Korea and Asian partner countries. Furthermore, strategically, it is recommendable to develop jointly with Japan who has already capacity and networks with other Asian countries to mitigate GHG emissions. Such financial resources from MDBs and Japan may contribute to meet the 11.3% of GHG reduction target from abroad according to INDC of Korea.
International conference on construction engineering and project management
/
2009.05a
/
pp.847-855
/
2009
While many studies on feasibility analysis for housing projects have been released, the main focus was on economic feasibility and factors related to developers were not clearly identified enough to be used in practice. In order to establish a feasibility analysis model for apartment development projects requested by developers in Korea, 31 driving factors behind projects' success were identified under seven different categories. Criterions of the each factor were also developed, and weight of each factor was assigned by applying the Analytical Hierarchy Process(AHP). Finally, based on the Monte Carlo simulation, the feasibility analysis model was established, providing probability distribution of project's grade. The model was applied to 12 housing projects to verify its reliability, and found that the model properly filtered projects that are unlikely to be profitable, indicating reasonable reliability of the model. The model can be a useful tool for contractors, especially with less experience in analyzing project development feasibility.
Journal of the Korea Institute of Building Construction
/
v.9
no.3
/
pp.117-125
/
2009
With construction industry recession, many construction companies are increasingly conducting the development projects by themselves. However, housing projects requested by developers still stand large portion. Although many studies on feasibility analysis were released, they mainly focused on economic feasibility and lacked research on factors and criterions of overall project. Also, because previous studies overly break downed factors related to project, they rarely used in practice. Therefore, this study developed the feasibility analysis model of housing development projects to help main contractors to easily and effectively decide if it is feasible enough to promote the projects requested by developers, and verified the reliability of the model. In this study, thirty one driving factors were identified under seven different categories and the criterion of each factor was also developed. The survey on important index of each factor found 'salability', 'economic feasibility', 'site location' and 'method of raising fund' significant. 12 projects were tested by the model and its results showed resonable reliability.
In order to promote the IT business efficiently, the Preliminary Feasibility Study has been conducted since 2004. It is to verify the feasibility of a large-scale IT project in advance and to determine whether to reflect the budget. It is more difficult to analyze the benefits of the IT project than other projects, because the IT project is carried out by combining tangible and intangible assets and human resources. For this reason, the Standard Guideline for Preliminary Feasibility Study in the IT field suggests a framework to support in estimating the benefits of the IT project. However, it includes the following problems : 1) level discrepancy among the benefit categories, 2) lack of types of benefit items, 3) no consideration of benefit inducing factors. So the framework is facing a low utilization. This study develops a new framework through a three-step research process. The new framework can be used not only for preliminary feasibility studies but also for estimating the benefits of general IT projects.
The starting point of successful building production process is the feasibility study of the project. If the feasibility study is poor which is affected in direct production processes such as designing and engineering, it incurs a great unrecoverable loss to the company. The government institutionalized the feasibility study for projects that budgets over 50billion won in an effort to ensure competitiveness of the construction industry after IMF; however, the system and effort to created systematic studies or guidance preparation for private construction development projects are lacking in great deal. Therefore, the objective of this study is to establish the analysis factors of feasibility study and evaluation standard by systematic analysis in consideration of the changes of various variables and mutual relationships using system dynamics technique for office buildings among commercial buildings.
Korean Journal of Construction Engineering and Management
/
v.11
no.5
/
pp.3-14
/
2010
This study investigated and analyzed feasibility analysis case studies, carried out by contractor of EPC LSTK projects in the planning stage to suggest the strategies to solve problems for project improvement. For this, five feasibility analysis case studies of gulf cooperation council (GCC) countries were reviewed and investigated. The results can be summarized as follows: 1) Those factors needed to be analyzed, including cost increase, project delay, quality decrease were insufficiently considered when assessing feasibility. 2) And improvement strategies for three problems mentioned above were suggested based on findings in feasibility analysis. 3) Lastly the process of the project feasibility analysis that can be applied to overseas plant construction project was suggested step by step.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.