• 제목/요약/키워드: Faulted loop voltage

검색결과 2건 처리시간 0.017초

Loop Selective Direction Measurement for Distance Protection

  • Steynberg, Gustav;Koch, Geyhard
    • Journal of Electrical Engineering and Technology
    • /
    • 제1권4호
    • /
    • pp.423-426
    • /
    • 2006
  • Distance relays achieve selective tripping by measurement of all short circuit fault conditions inside set reaches. The direction of the fault, forward or reverse is commonly determined with a dedicated measurement to ensure selectivity under all conditions. For the direction decision (measurement) a number of alternatives are available. This paper describes a loop selective direction measurement and illustrates by means of a typical fault why this is superior to a non loop selective direction measurement such as that based on negative sequence quantities.

안정적 전력공급을 위한 154kV 변전소 배전선로간 연계운영에 관한 연구 (A Study on Loop operation of 154kV Substation Distribution line for Stable power supply)

  • 김광호;손명권;정종찬
    • 산업기술연구
    • /
    • 제29권B호
    • /
    • pp.221-228
    • /
    • 2009
  • For a stable supply of electric power, periodical inspection of the electric facilities and repair of the distribution lines are required. In case of any unexpected accidents, looped operation among distribution lines may be necessary in order to supply electricity through the sound lines, separating the faulted lines. As a result of this study, it was found that normal looped operation became impossible when phase difference of the looped distribution lines is more than 3 degrees compared with the voltage supply of the distribution lines. Therefore, for a stable supply of electric power to Chuncheon, it is judged to be desirable that looped operation of the distribution lines coming from the same substation M. Tr Bank shall be performed in principle and in case of looped operation with the substation of different system, looped operation among the lines shall be performed after voltage regulation of the substation M. Tr Bank, maintaining similar voltages and load supply volume in order to avoid phase difference through checking the operation conditions of each substation M. Tr Banks. And when looped operation among the distribution lines is scheduled, voltage regulation schedule has been established so far by calculating maximum supply volume through the transformer of the substation and the maximum load volume through the distribution lines but in the future, looped operation of the distribution lines shall be carried out by removing voltage difference with regulating tap or load of the surrounding transformers, with giving prior notice to the substation operators.

  • PDF