In the situation of bringing out of social problem about the medical accident and medical dispute, from 1988 the enactment activity for a legislative bill on conciliation of dispute has promoted, a legislative bill on prevention and relief of medical accident was again proposed in December, 2005. This bill has been faced rough going in review process of National Assembly. Because the purpose of this legislative bill is the conciliation of interest of between medical service consumer and medical service supplier, an item of issues of law is no-fault compensation scheme. However, as no-fault compensation scheme runs counter to the principle liability with fault in our civil law, as expected, whether the inducement is valid or, if induced, the problem is not must be totally reviewed. First of all, the general of principle liability without fault and especially the medical system in foreign countries are reviewed, by reviewing an issue and the pros and cons of the inducement of no-fault compensation scheme, this article draws the conclusion. After all, considering that the necessity adapting Gefahrdungschftung in medical accident as much as other industrial fields exists, the many provisions of the principle liability without fault exists in civil law and special law of our law system, and no-fault compensation scheme let legislative purpose be, to what extent, achieved by conciliating patient and doctor, the inducement of principle liability without fault in medical field is reasonable in the aspect of politic and legal system.
Journal of the Korea Institute of Information and Communication Engineering
/
v.13
no.4
/
pp.737-746
/
2009
In this study, we have developed one chip system IC for preventing the overload, detecting an abnormal conditions, and controlling the fire prevention in the intelligent home appliances. For the purpose, a circuit detectable an electric leak for preventing an electric shock, and a circuit detectable arc that has effect directly on the fire are designed. The circuits designed on every block are verified by comparing simulation with bread-boarding using a standard transistors. The system IC is fabricated by using 34 V 2 metal $1.5{\mu}m$ bipolar transistor process from evaluation results. The electrical performances of IC application circuits and the system IC equipped on PCB board are evaluated. It is confirmed that the system IC is well operated for arc and ground fault(GF) signal.
Proceedings of the Safety Management and Science Conference
/
2005.05a
/
pp.279-290
/
2005
The purpose of this study is to attempt a Analysis of a pointed-end Equipment Arm Safety-Accident for Fault Tree Analysis. Three major techniques were used first problem is Z-Model by which accident Analysis & prevention of a pointed-end Industry can be made, Fault Tree Analysis(FTA) bywhich quantification of a pointed-end Equipment accident Analysis can be made it 5 years in past and the third, manual-written by which minimal cut set to accident can be Identified. A example has been made of issue point a pointed-end Equipment that the Arm in loader happen to Injuries. According to the Analysis lack of safety knowledge, unsafety-behavior seem to be the primal cause of accident. Comparision of the accident cause to actual report demonstratesthat the FTA a efficient tool for Industrial Accident prevention.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.11
/
pp.1752-1757
/
2012
With the development in industry, power demand has increased rapidly. As consumption of power has increased, Demand for new power line and electric capacity has risen. However, in the event of fault, problems occur in extending the range of fault coverage and increasing fault current. In these reasons, protection devise is recognized as the prevention of an accident and fault current. This paper dealt with minimizing fault propagation and limiting fault current by adjusting fault current limiter (FCL) with fast interrupter. At this point, we compared and analyzed characteristics between non-inductive resistance and fault current which is limited by superconducting units. In normal state of the power system, power was supplied to the load, but when fault occurred, the interrupter was operated as CT which detected the over-current. Its operation made the limitation of fault current through a FCL. We concluded that the limiter using superconducting units was more efficient with the increase of power voltage. Superconducting fault current limiter with the fast interrupter prevented the spread of a fault, and improved reliability of power system.
Modern production systems are very complex by request of automation, and failure modes that occur in thisautomatic system are very various and complex. The efficient fault diagnosis for these complex systems is essential for productivity loss prevention and cost saving. Traditional fault diagnostic system which perforns sequential fault diagnosis can cause catastrophic failure during diagnosis when fault propagation is very fast. This paper describes the Real-time Intelligent Multiple Fault Diagnosis System (RIMFDS). RIMFDS assesses current machine condition by using sensor signals. This system deals with multiple fault diagnosis, comprising of two main parts. One is a personal computer for remote signal generation and transmission and the other is a host system for multiple fault diagnosis. The signal generator generates various faulty signals and image information and sends them to the host. The host has various modules and agents for efficient multiple fault diagnosis. A SUN workstation is used as a host for multiple fault modules and agents for efficient multiple fault diagnosis. A SUN workstation is used as a host for multiple fault diagnosis and graphic representation of the results. RIMFDS diagnoses multiple faults with fast fault propagation and complex physical phenomenon. The new system based on multiprocessing diagnoses by using Hierarchical Artificial Neural Network (HANN).
The Journal of the Korea institute of electronic communication sciences
/
v.3
no.4
/
pp.260-265
/
2008
The arc-fault occurring in the customer system becomes the direct cause of electric fire. However, it is very difficult to identify the arc-fault using the existing fault detection mechanism because the magnitude of the fault current is very small. Accordingly, this paper analyzes the causes of arc fault and designs the basic detection mechanism of arc fault. And then, it proposes an signal processing-based arc-fault determination methodology which can enhance the of accuracy of the arc-fault determination by applying DFT/DWT to the voltage and current waveform. Finally, this paper showed the application methodology of the proposed signal processing based fault determination method by applying and analyzing DFT/DWT to an high voltage in-rush current waveform.
The Transactions of The Korean Institute of Electrical Engineers
/
v.62
no.6
/
pp.876-880
/
2013
The major causes of electrical fire are classified to short circuit fault, overload fault, electric leakage and electric contact failure. The principal factor of the fire is electric arc or spark accompanied with such electric faults. Earth Leakage Circuit Breaker (ELB) and Molded_case Circuit Breaker (MCCB), that is, Residual Current Protective Devices (RCDs) used on low voltage distribution lines cut off earth leakage and overload, but the RCD can not cut off electric arc or spark to be a major factor of electrical fire. As the RCDs which are applied in low voltage distribution panel are prescribed to rated breaking time about 30[ms] (KS C 4613), the RCDs can't perceive to the periodic electric arc or spark of more short wavelength level. To improve such problems, this paper studies on an arc fault circuit interrupter (AFCI) using the distorted voltage wave in electric arc faults. The proposed voltage sensing type AFCI is an electrical fire prevention apparatus of new conception that operates a circuit breaker with sensing the instantaneous voltage drop of line voltage at electrical faults occurrence. The proposed AFCI is composed of control circuit topology using some semiconductor switching devices. Some experimental tests of the proposed AFCI confirm practicality and the validity of the analytical results.
Proceedings of the Korea Institute of Fire Science and Engineering Conference
/
2007.11a
/
pp.205-210
/
2007
This study on the prevention of electric fire. Generally the electric fire is caused by break or disconnection of the power line, short circuit and poor contact, arcing fault ect. In these causes, this paper is studied on the detection of poor contact and arcing fault. The arcing fault is caused by poor contact mainly. The arcing fault can occurs a electric fire by interaction of flammable gas and materials and it can be caused of tracking and carbonization. These phenomenons is also caused of electric fire. Therefore this paper is studied on the detection of arcing fault and poor contact.
Recently, the scale of distribution system is being enlarged by increasing power demand. When system fault occurs, fault currents and damage power facilities increase, so system stability decreases. Effective prevention of system from fault extention becomes influential as a subject in distribution system operation. In this study, exact settings of relays are obtained from program for fault calculation and coordination of relays in distribution system. In order to make smooth coordination between relays even when power system conditions vary, operation time and sensitivity of relays are optimized. As a result, reliability of distribution system is increased with rapid and exact operation of relays when fault occurs.
The chemical composition and noble gas isotopes of 10 deep groundwater samples were analyzed to know the circulation of groundwaters in the Yangsan fault and the Gampo fault. The chemical types of groundwaters show the $Ca-HCO_3$ type and $Ca-SO_4(Cl)$ type, and show indistinct relationship with geology. Noble gas isotopic data of most groundwaters were plotted along the air-crust mixing line on $^3He/^4He$ vs. $4^He/^{20}Ne$ diagram, and show dominant $^3He$ of air origin except one sample that shows helium mixing of crust origin. This indicates that groundwater actively circulates along fault, and fault could not play an role of upward pathway of a deep-seated helium gas. A comparatively high $^4He$ indicates that groundwater flows in an aquifer assuring relatively enough water-rock interaction.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.