• Title/Summary/Keyword: Fast-Time 시뮬레이션

Search Result 345, Processing Time 0.023 seconds

A Fast-Decoupled Algorithm for Time-Domain Simulation of Input-Series-Output-Parallel Connected 2-Switch Forward Converter (직렬입력-병렬출력 연결된 2-스위치 포워드 컨버터의 시간 영역 시뮬레이션을 위한 고속 분리 알고리즘)

  • Kim, Marn-Go
    • Journal of Power System Engineering
    • /
    • v.6 no.3
    • /
    • pp.64-70
    • /
    • 2002
  • A fast decoupled algorithm for time domain simulation of power electronics circuits is presented. The circuits can be arbitrarily configured and can incorporate feedback amplifier circuits. This simulation algorithm is performed for the input series output parallel connected 2 switch forward converter. Steady state and large signal transient responses due to a step load change are simulated. The simulation results are verified through experiments.

  • PDF

Vessel Traffic Safety Assessment for the Construction of the Mokpo Bridge (목포 연육교 건설에 따른 선박 통항 안전성 평가)

  • Yang, Chan-Su;Gong, In-Young;Lee, Chang-Min
    • Journal of Navigation and Port Research
    • /
    • v.28 no.8
    • /
    • pp.735-743
    • /
    • 2004
  • A bridge which connects Mokpo North Harbor and Goha Island is going to be constructed until 2009. For the bridges being built in the navigable water area, it is indispensible to carry out vessel traffic safety assessment from the viewpoint of shiphandlers, however, there exist no specific guidelines for the necessary conditions which the bridge designers can rely on. In this paper, traffic safety assessment procedures for the layout of the bridge are briefly introduced, and the conditions which should be taken into account at the initial design stage of the bridge are surveyed For the safety assessment of the bridge design, ship navigation simulations, such as RTS( real time simulation) and FTS(fast time simulation), are carried out, the results of which are statistically analysed to estimate the probability of collision between the ship and the pier of the bridge.

Fast Simulation of Overflow Probabilities in Multi-Class Queues with Class-Transition (계층 전이가 가능한 다계층 대기행렬의 빠른 시뮬레이션)

  • Song, Mi-Jung;Bae, Kyung-Soon;Lee, Ji-Yeon
    • Communications for Statistical Applications and Methods
    • /
    • v.16 no.2
    • /
    • pp.217-228
    • /
    • 2009
  • In this paper, we consider a multi-class queueing system in which different classes of customers have different arrival rates, service rates and class-transition probabilities. We use the fast simulation method to estimate the overflow probability and the expected number of customers of each class at the first time the total number of customers hits a high level. We also discuss the overflow probabilities and the expected number of customers at different loads, respectively.

Computer simulation to determine system parameters of the square-wave adapted fast impedance analyzer for the electrode - electrolyte interface analysis (구형파를 이용한 전극계면 분석용 고속 임피던스 분석기의 설계변수 확정을 위한 컴퓨터 시뮬레이션)

  • Kim Gi-Ryon;Kim Gwang-Nyeon;Shim Yoon-Bo;Jeon Gye-Rok;Jung Dong-Keun
    • Journal of the Korea Society for Simulation
    • /
    • v.14 no.2
    • /
    • pp.45-55
    • /
    • 2005
  • There are electric double layer capacitance, polarization resistance and solution resistance in the interface between electrode and solution. Electrode process could be evaluated by the electrical impedance analysis. The necessities of the electrochemical cell analysis with high speed impedance analyzer are followings: minimization of the effects of electric stimulation on electrochemical cell and the concentration of reactive materials, and optimization of impedance signal resolution. This paper represents the design criteria for the selection and stimulation to develop fast impedance analyzer prototype for a electrochemical cell. It was suggested that the design of 470k sample/s sampling rate, 13 bit ABC resolution, and 140ms recording time is required for high speed impedance analysis system in frequency range between dc and 10kHz.

  • PDF

Simulation Analysis of Part Release Algorithm under Dynamic Tool Allocation in SSMS (SSMS에서 동적 공구할당을 고려한 부품투입 알고리즘의 시뮬레이션 분석)

  • 이충수
    • Journal of the Korea Society for Simulation
    • /
    • v.8 no.1
    • /
    • pp.63-76
    • /
    • 1999
  • Recently in manufacturing environment, manufacturing order is characterized by unstable market demand, shorter product life cycle, a variety of product and shorter production lead time. In order to adapt this manufacturing order, flexible manufacturing systems(FMS) in manufacturing technology advances into the direction that machines become further versatile functionally and that tools are controlled by fast tool delivery device. Unlike conventional FMS to mainly focus on part flow, it is important to control tool flow in single-stage multimachine systems(SSMS), consisting of versatile machines and fast tool delivery device. This research is motivated by the thought that exact estimation of tool competition at part release in SSMS enhances the system performance. In this paper, in SSMS under dynamic tool allocation strategy to share tools among machines, we propose real-time part release and tool allocation algorithms which can apply real factory and which can improve system performance.

  • PDF

SSMS에서 동적 공구할당을 고려한 부품투입 알고리즘의 시뮬레이션 분석

  • 이충수
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.04a
    • /
    • pp.60-64
    • /
    • 1999
  • Recently in manufacturing environment, manufacturing order is characterized by unstable market demand, shorter product life cycle, a variety of product and shorter production lead time. In order to adapt this manufacturing order, flexible manufacturing system(FMS) in manufacturing technology advances into the direction that machines become further versatile functionally and that tools are controlled by fast tool delivery device. Unlike conventional FMS to mainly focus on part flow, it is important to control tool flow in single-stage multimachine systems(SSMS), consisting of versatile machines and fast tool delivery device. In this paper, in SSMS under dynamic tool allocation strategy to share tools among machines, we propose real-time part release and tool allocation algorithms which can apply real factory and which can improve system performance.

  • PDF

Fast locking PLL with time difference detector (시간 차 감지기를 사용한 고속 위상고정루프)

  • Ko, Gi-Yeong;Choi, Hyuk-Hwan;Choi, Young-Shig
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2017.05a
    • /
    • pp.691-693
    • /
    • 2017
  • A novel structure of fast locking phase locked loop (PLL) with time difference detector and Lock status indicator (LSI) is proposed in this paper. Fast locking time is achieved using LSI. It has been simulated and proved by HSPICE in a CMOS $0.18{\mu}m$ 1.8V process.

  • PDF

A Scalable Semi-Implicit Method for Realtime Cloth Simulatio (계산량 조정이 가능한 실시간 옷감 시뮬레이션 방법)

  • Kim Myoung-Jun
    • The KIPS Transactions:PartA
    • /
    • v.13A no.2 s.99
    • /
    • pp.177-184
    • /
    • 2006
  • Since well-known explicit methods for cloth simulation were regarded unstable for large time steps or stiff springs, implicit methods have been proposed to achieve the stability. Large time step makes the simulation fast, and large stiffness enables a less elastic cloth property. Also, there have been efforts to devise so-called semi-implicit methods to achieve the stability and the speed together. In this paper we improve Kang's method (Kang and Cho 2002), and thus devise a scalable method for cloth simulation that varies from an almost explicit to a full implicit method. It is almost as fast as explicit methods and, more importantly, almost as stable as implicit methods allowing large time steps and stiff springs. Furthermore, it has a less artificial damping than the previously proposed semi-implicit methods.

A Fast Discrete-Time-Domain Simulation for the Input- Series -Output-Parallel Connected 2-Switch Forward Converter (직렬입력-병렬출력 연결된 2-스위치 포워드 컨버터에 대한 이산 시간 영옌 고속 시뮬레이션)

  • Kim Marn-Go
    • Proceedings of the KIPE Conference
    • /
    • 2002.07a
    • /
    • pp.533-537
    • /
    • 2002
  • A fast time domain modeling and simulation is performed for the input-series-output-parallel connected 2-switch forward converter Steady-state and large-signal transient responses due to a step load change are simulated. The simulation results are verified through experiments.

  • PDF

Vessel Traffic Safety Assessment for the Construction of the Mokpo Bridge (목표 연육교 건설에 따른 선박 통항 안전성 평가)

  • 양찬수;공인영
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.04a
    • /
    • pp.209-216
    • /
    • 2004
  • In A bridge which connects Mokpo North Harbor and Com Island is going to be constructed until 2009. For the bridges being built in the navigable water area, it is indispensible to carry out vessel traffic safety assessment from the viewpoint of shiphandlers, however, there exist no specific guidelines for the necessary conditions whim the bridge designers can rely on. In this paper, traffic safety assessment procedures for the layout of the bridge is briefly introduced, and the conditions whim should be taken into account at the initial design stage of the bridge is surveyed. For the safety assessment of the bridge design, ship navigation simulations, such as RTS(real time simulation} and FTS(fast time simulation), are carried out, the results of which are statistically analysed to estimate the probability of collision between the ship and the pier of the bridge.

  • PDF