• 제목/요약/키워드: Factors of Difficulties in Management

검색결과 292건 처리시간 0.026초

해외 온실가스 감축 사업 촉진 요인 분석 (Analysis of Factors Promoting Overseas Greenhouse Gas Reduction Projects)

  • 김지훈;임성수
    • 한국유기농업학회지
    • /
    • 제32권2호
    • /
    • pp.161-182
    • /
    • 2024
  • The purpose of this study is to highlight overseas reductions as one of the measures to achieve Korea's 2030 NDCs, and to derive factors to promote overseas greenhouse gas reduction projects. To this end, a survey was first conducted on greenhouse gas management companies, which are the main entities for reducing greenhouse gas emissions. The contents of the survey are divided into three categories: awareness of greenhouse gas reduction projects, institutional and technical sectors, and government support and difficulties. Specifically, the perception section on greenhouse gas reduction projects examined the greenhouse gas reduction methods currently implemented or under consideration in the future. In the area of government support and difficulties, difficulties in promoting overseas greenhouse gas reduction projects were investigated. The results of the analysis using the probability selection model are as follows. First, the greater the greenhouse gas intensity, the degree of dedicated manpower, and the larger the size according to the company's business field, the higher the interest in overseas reduction projects. Second, there was discrimination in the method of reducing greenhouse gas emissions according to the size variables of the company, the degree of greenhouse gas intensity, the degree of having dedicated manpower, and the business field. Lastly, in the case of small businesses, difficulties in business promotion due to the lack of greenhouse gas reduction technology were found to be the biggest cause than other problems. Therefore, it is necessary to induce the reduction of greenhouse gas emissions by introducing foreign technologies to support greenhouse gas reduction technologies for small and medium-sized enterprises, and to provide support such as training courses for professional manpower and the operation of portals for information provision at the government level.

What are the Risks of using Smart Technology in the Construction Phase?

  • Lee, Baul;Park, Seung-Kook
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.103-110
    • /
    • 2022
  • In the era of the 4th Industrial Revolution, smart technology being considered to improve productivity breakthroughs is in the spotlight as a means to replace traditional construction technology in the construction industry. However, various problems are occurring in construction sites using smart technology and causing negative impacts on construction projects. Therefore, the objective of this study is to identify risk factors that occur when smart technologies are used in construction projects. To achieve this purpose, this study investigated the difficulties at construction projects using smart technology, and risk factors were derived based on site surveys and literature. The risk factors were measured by experts, and then a total of 19 risk factors was derived by exploratory factor analysis. As a result, risks were classified as 5 factors, the institutional factor is the most difficult response, and the government needs anticipative system improvement and a long-term plan. The research findings provide practical implications for construction experts trying to apply smart technology in construction sites and construction policy-makers to revitalize smart technology.

  • PDF

일 종합병원 입원 환자의 간호서비스 만족도와 간호사의 간호 행위 특성간의 관계 연구 (The Correlational study of Nursing Service Satisfaction and Nurse's Nursing activity Styles)

  • 조양희;김소인;한금선;임지영
    • 간호행정학회지
    • /
    • 제7권3호
    • /
    • pp.439-446
    • /
    • 2001
  • The purpose of this study was to identify the relationship of nursing service satisfaction and nurse's nursing activity styles in a hospital settings. The subjects of this study were 150 admitted patients in a hospital. The data was collected with Nursing Service Satisfaction Scale developed by Tomas(1996) and modified Nurse's Nursing activity styles Scale developed by Coeling(1993). The results were as follows: 1. The mean score for the level of nursing service satisfaction was 65.00(SD=14.10). The mean score for subcategories of nurse's nursing activity styles were as follow; work difficulties management 9.47(SD=2.02), effective work attitude 23.53(SD=3.14), interpersonal relationship 48.82(SD=6.18), keep regulation 23.24(SD=3.62), professional values 48.28(SD=5.27), and professional development 24.41(SD=3.07). 2. The correlations of nursing service satisfaction and subcategories of nurse's nursing activity styles were revealed a positive significant correlation; work difficulties management(r=0.17, p=0.03), effective work attitude(r=0.44, p=0.00), interpersonal relationship(r=0.51, p=0.00), keep regulation(r=0.44, p=0.00), professional values(r=0.31, p=0.00), professional development(r=0.30, p=0.00). 3. Stepwise multiple regression analysis revealed that the most powerful predictor of nursing service satisfaction was effective interpersonal relationship. A combination of effective work attitude, work difficulties management account for 38% of the variance in nursing service satisfaction of the patient in a hospital. In conclusion, this study revealed that the effective work attitude, interpersonal relationship, and work difficulties management in nursing activity were important factors to improve the level of nursing service satisfaction.

  • PDF

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

Difficulties in ERP integration in Umm Al Qura University: A Case Study

  • Abdullah A H Alzahrani
    • International Journal of Computer Science & Network Security
    • /
    • 제24권4호
    • /
    • pp.35-43
    • /
    • 2024
  • The development and integration of Enterprise Resource Planning (ERP) systems have consistently attracted attention from software engineering researchers. Many studies have examined the factors that influence successful ERP integration, while others have focused on introducing integration models that address issues and challenges that affect the successful integration of ERP. However, it is crucial to recognize that the key player in successful integration is the individual involved. This paper aims to investigate how individuals based on departmental attachments and experiences have viewed the factors that affected the success of ERP integration. A case study was conducted at one large organization namely Umm Al Qura University, Saudi Arabia. Five departments were involved namely: Financial management, purchasing management, warehouse management, human resources management, and the Deanship of Information Technology. The results of 78 participants were collected and analyzed. Furthermore, it was different how individuals from different departments involved in the ERP integration viewed the factors that affected the success of integration. In addition, it was noticed that individuals with different experiences have various views on the factors. Moreover, it was evident that departmental attachments and individual experience might play a role in the successful integration of ERP.

중소제조업체의 정보시스템 개발 실패 요인에 관한 실증연구 (An Empirical Study on Failure Factors of Information System Development Projects for SMEs)

  • 홍순구;최일용
    • 한국IT서비스학회지
    • /
    • 제8권4호
    • /
    • pp.41-55
    • /
    • 2009
  • Due to the global business environments and severe competitions, SMEs have carried out IS projects for their competitive advantages. However, numerous organizations have faced with difficulties in the IS project management such as large amounts of IT expenses and uncertainties in project implementations. Thus, this study is intended to discover critical risk factors in the IS project management. To achieve this research goal, we have mailed questionnaires to SMEs and SI companies that experienced IS project failures and 63 usual data were collected. The result of analysis with step wise regression showed that 6 factors are related with IS project failures. The study contributes to the literature in two ways. First, this paper empirically identifies IS risk factors for SME manufactures. Second, this research result can be utilized as a checklist for the successful IS implementations. Limitations and future research topics are also discussed.

암과 관련된 수면장애 (Cancer-Related Sleep Disorders)

  • 서완석
    • 수면정신생리
    • /
    • 제16권1호
    • /
    • pp.10-15
    • /
    • 2009
  • Sleep problems and disorders are common in patients with cancer. Sleep of the cancer patients is affected by various factors, including thermoregulatory changes associated with chemotherapy and radiotherapy, cancer related symptoms, such as pain, fatigue, and emotional difficulties. As one of the most common symptoms in cancer patients, fatigue is positively correlated with sleep difficulties. Cytokine is also frequently associated with chemotherapy and radiotherapy. It provokes excessive daytime sleepiness and hypersomnia. Medications for controlling pain, depression, and anxiety can affect sleep of the cancer patients. Medications as well as behavior therapy are reported to be effective for controlling sleep problems, and the physicians need to be accustomed to use the modalities appropriately. This paper reviews causative factors, evaluation, and management of sleep problems and disorders, experienced by cancer patients.

  • PDF

Online 의료웹서비스 품질과 지식제공성과의 관계 연구 (Relationships between Online Web Service Quality and Knowledge Transfer)

  • 김상만;엄기현;오재영
    • 지식경영연구
    • /
    • 제11권1호
    • /
    • pp.1-17
    • /
    • 2010
  • As information technology had shown tremendous development in late 20th century, various service opportunities appeared in many industries. Also, new types of service are becoming available such as, reservation, teleconsultation, telemedicine. In health care industry, in which, many hospitals are faced operational difficulties and competing impetuously, a web site has become a effective tool to attract patients and transfer tremendous health information to the patients. This study is based on many previous researches on online service quality, try to figure out e-service quality factors of health information sites, and the factors' effect on users' satisfaction on the web site via providing knowledge and trust on the web site. As a result, usability, site aesthetic, responsiveness and security are the 4 factors to measure e-service quality of health information web site. All factors except site aesthetic have significant effects on providing knowledge, security only effects on trust on the web site.

  • PDF

개성공단 사업의 추진현황과 효율적 활성화 방안에 관한 연구 - 입주기업의 실태조사와 주요 경영상 애로요인 분석을 중심으로 (A Study on the Current Status and Efficient Activation Plan for the Kaesong Industrial Complex Project - Focusing on the survey of South Korean companies in the Kaesong Industrial Complex and an analysis of the main causes of management frustration)

  • 김양수;양해술
    • 디지털융복합연구
    • /
    • 제11권12호
    • /
    • pp.69-82
    • /
    • 2013
  • 본 연구는 경제특구 개성공단사업이 한반도의 정치 군사적 긴장을 완화시키고 남북경제협력 활성화에 걸림돌이 되는 일이 없도록 문제점을 진단하고, 해결 방안으로써 정책적 대안을 제시하며, 성공적으로 이 사업이 추진될 수 있도록 입주기업 및 개성공단 전체의 입장에서 필요한 지속 가능한 발전 전략을 제시하는데 목적이 있다. 이를 위해 본 연구를 수행 한 결과, 개성공단의 개관과 개성공단 사업의 기대효과를 통해 개성공단의 긍정적 효과를 되짚어 볼 수 있는 계기가 되었다. 또한, 본 연구의 핵심과제인 입주기업의 실태조사를 통해 개성공단 입주기업의 현황을 깊이 있게 볼 수 있었으며 입주기업의 경영상 애로요인의 상관관계를 통계적 방법으로 검증한 결과, 유의함을 알 수 있었다.

Delay Factors Affecting the Completion of the Government Construction Projects in Vietnam

  • Kim, Soo-Yong;Nguyen, Viet Thanh;Luu, Van Truong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.161-165
    • /
    • 2015
  • The delay in construction is the challenge often faced in the course of executing construction projects. To the government projects, the delays become very serious. This problem directly affects the lives, social welfare of the people, and the other negative social impacts. However, the government projects have not been much interest. The questionnaire surveys in Vietnam were conducted to determine the causes of the delay and to find solutions for dealing with the delay. The average index was used to rank the delay factors and the solutions. This study identified the 5 most highly ranked delay factors and the 8 best solutions from a list of 31 delay factors and 19 solutions for the delay. The five most highly ranked delay factors were: information delays and lack of information exchange between the parties; incompetent owner; incompetent supervision consultant; incompetent contractor; and difficulties in financing project by owner. The findings of the study can help the parties involved the government construction projects and practitioners to give appropriate strategies for countering the delay in their projects.

  • PDF