• Title/Summary/Keyword: Facility wiring management

Search Result 5, Processing Time 0.022 seconds

Analysis of the Insulation Resistance Trend according to the Installation Environment of the Electric Wiring of the Melting Furnace (용해로 전기배선의 설치환경에 따른 절연저항 추이 분석)

  • Suk Bong Ko;Doo-Hyun Kim;Sung-Chul Kim
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.2
    • /
    • pp.15-22
    • /
    • 2023
  • In this study, the process and the environment of a melting furnace, located in Workplace A in Chungnam Province was inspected, and the insulation resistances of electrical circuits and motors were measured, and their changes over five years (2017-2021) were analyzed. It was found that the exhaust fan, oil pumps #A and #B, and heater were installed in 2010. Their insulation resistances decreased from 2017. Specifically, the insulation resistance of Oil Pump #A decreased from 100 (㏁) in 2018 to 20(㏁) in 2021, an 80% reduction. The fast decrease in insulation resistance was due to the high temperature of the melting furnace affecting surrounding the electrical facilities. A safety management scheme on the electrical facility of the melting furnace was proposed.

Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing (적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

A Study about False Alarm of Automatic Fire Detection System (자동화재 탐지설비의 비화재보 감소방안)

  • Lee, Jong-Hwa;Lee, Chun-Ha;Kim, Shi-Kuk;Kong, Ha-Sung
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.41-49
    • /
    • 2011
  • The automatic fire detection system is an important facility installed with focusing on minimizing the damage from a fire. This paper presents in the followings as the methods to reduce the false alarm of the automatic fire detection system; first, to prepare for legal standard so that revised legal standard can be applied to the fire fighting property prior to revision; second, to introduce the performance based fire detection protection design in the law based fire protection design; third, to maintain the wiring of worn-out detector; forth, to introduce an evaluation system to the education for the fire warden; fifth, to extend the standard of MTBF(meantime between failure) of the detector; sixth, to extend of installing the analog type detector; seventh, to improve the structure of reset switch.

A Study of the Development of a Modular, Lightweight Steel Ceiling System (유닛형 경량철골 천정시스템 개발에 관한 연구)

  • Kim, Hyeyeon;Bae, Sanghwan
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.5
    • /
    • pp.269-277
    • /
    • 2017
  • This study consists of an analysis of pre-existing ceiling construction systems as well as the development of a replacement unitary, lightweight steel ceiling system and related legal standards. Based on the material conditions and progression of the study, appropriate components were chosen and details were modified by mock-up test. A final study model was evaluated for performance and adaptability based on four parameters (indoor environment, constructability, budget economy, and aesthetics) and compared to the pre-existing ceiling system. As a result of the initial study, a lightweight steel design was created consisting of a reinforced structure with modular bars and entry holes for components. This system was hung directly on the suspension structure. The new design increased lighting and acoustic performance adapted to an indoor environment. Moreover, the speed of construction was increased by approximately 30%, the cost was decreased by approximately 20%, and ceiling aesthetics were improved.

Actual Status of and Measure for False Alarm of Electronic Security in Korea (한국 기계경비업무의 오경보 대응책)

  • Park, Dong-Kyun;Kim, Tae-Min
    • Korean Security Journal
    • /
    • no.30
    • /
    • pp.33-60
    • /
    • 2012
  • False alarm of Electronic security causes various serious side effects such as decrease of electronic security guard's morale caused by unnecessary mobilization, increase of fatigue caused by workload increase, increase of electronic security company owner's management burden and decrease of electronic security service utilization rate caused by customer's distrust. Therefore, the study considered the Korean regulation related with false alarm of electronic security and proposed actual status of false alarm and measure for it. The study proposed systematic resolution assignments and political assignments in relation with the measure for false alarm. Systematic resolution assignments are as follows. First, electronic security company should construct electronic security system accurately from the initial step of security consulting and security planning related with target facility. Second, it is necessary to encourage installation and operation of video monitoring system. Third, sensor wiring should be separated. Fourth, the measures for false alarm depending on main system causes should be prepared. It is necessary to encourage the installation of 'arming disarming alarm sound' generator. In addition, the measures for false arm depending on the characteristics of sensor should be prepared and standardized. Fifth, system maintenance should be reinforced. Political assignments related with the measures for false alarm are as follows. First, it is necessary to reinforce education & training. Individual nurturing & education process should be run by electronic security company or the education focusing on the measure for false alarm should be performed in job training defined in "Security Industry Act". Second, it is necessary to establish and reinforce legal regulation and establish device. If police authority standardizes the documents related with false alarm, provides their forms and requires them for periodical reports or documents, it is expected that good measures for false alarm will be prepared on the basis of actual data in the future. Third, cooperation organization to discuss the measures for false alarm like 'Conference for False Alarm of Electronic Security' should be organized and operated. Fourth, interest and role of electronic security company and electronic security supervisor should be enlarged.

  • PDF