• 제목/요약/키워드: FMAS system

검색결과 5건 처리시간 0.015초

Thermodynamic Evaluation of Fe Effect on Alumina Solubility in Orthopyroxene coexisting with Garnet

  • Lee, Han-Yeang
    • 한국지구과학회지
    • /
    • 제25권1호
    • /
    • pp.39-47
    • /
    • 2004
  • In the FMAS system the effect of iron on alumina solubility in orthopyroxene has been determined by experiments with crystalline starting mixtures of garnet and orthopyroxene of known initial compositions at 20 kb, 975$^{\circ}C$ and 25 kb, 1,200$^{\circ}C$. These data have been modeled to develop a thermodynamic method for the calculation of Al$_{2}$O$_{3}$ in orthopyroxene as a function of P, T and composition. The direct application of the alumina solubility data in the MAS system to natural assemblages could lead to significant overestimation of pressure, probably by about 5kb for the relatively common garnet-lherzolites with abot 25 mol per cent Ca + Fe$^{2+}$ in garnet and about 1 wt. per cent Al$_{2}$O$_{3}$ in orthopyroxene since the effect of Fe is similar to that of Ca and Cr$^{3+}$in reducing the alumina solubility in orthopyroxene in equilibrum with garnet relative to that in the MAS system.

ASRI-FMS/CIM 을 위한 운용 소프트웨어의 구축 (Development of an Operation Software for the ASRI-FMS/CIM)

  • 박찬권;박진우;강석호
    • 산업공학
    • /
    • 제6권2호
    • /
    • pp.53-65
    • /
    • 1993
  • This paper deals with the development of a software module for production planning and scheduling activities of an existing Flexible Machining and Assembly System (FMAS). The Production Planning Module uses the hierarchical and sequential scheme based on "divide and conquer" philosophy. In this module, routes are determined based on the production order, orders are screened, tools are allocated, and order adjustments are executed according to the allocated tools. The Scheduling Module allocates the resources, determines the task priority and the start and completion times of tasks. Re-scheduling can be done to handle unforeseen situations such as lumpy demands and machine breakdowns. Since all modules are integrated with a central database and they interface independently, it is easy to append new modules or update the existing modules. The result of this study is used for operating the real FMAS consisting of a machining cell with 2 domestic NC machines and a part feeding robot, an assembly cell with a conveyor and 3 robots, an inspection cell, an AGV, an AS/RS, and a central control computer.

  • PDF

석류석-사방휘석 지질온도계와 지질학적 응용 (Garnet-Orthopyroxene Geothermometer and Geological Applications)

  • 이한영
    • 자원환경지질
    • /
    • 제21권1호
    • /
    • pp.29-44
    • /
    • 1988
  • 석류석과 사방휘석의 평형관계를 20-45kb, $975-1400^{\circ}C$, FMAS시스템에서 상호역반응 실험을 통해서 연구하였으며 반응 촉매제로써 사용한 PbO와 0.55 $PbF_2$의 혼합물은 매우 효과적이었다. Fe-Mg의 교환반응은 이 실험온도, 압력범위 내에서는 조성성분의 영향을 받지 않는다. 실험결과와 석류석의 혼합 모델을 사용한 석류석-사방휘석의 지질온도계는 다음과 같다. $$T^{\circ}C=(1971+11.91P(Kb)+1510(X_{Ca}+X_{Mn})^{Gt}/(lnK_D+0.96)-273$$.

  • PDF

Part flow control in a FMS with assembly subsystem

  • Lee, Young-Hae;Iwata, K.
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1991년도 춘계공동학술대회 발표논문 및 초록집; 전북대학교, 전주; 26-27 Apr. 1991
    • /
    • pp.77-89
    • /
    • 1991
  • One of the important problems concerning the efficient operation of an automated manufacturing system is the flow control problem. Most research papers about scheduling and control of a FMS consider fabrication, machining and assembly independently. In this paper an effective flow control strategy for a FMS with an assembly subsystem which may be called FMAS (Flexible Machining and Assembly System) is designed using the operation-oriented and, combined Push and Pull control method. The flow control system to be described here could meet production demands with a minimum makespan while satisfying assigned due-dates and keeping a low volume of work-in-process at the same time. The control mechanism also considers machine failures and rush jobs.

  • PDF

부품투입정책이 시스템 성능에 미치는 영향에 관한 연구 (Effects of Part RElease Policies to Performance of Manufacturing Systems)

  • 우상복
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 1994년도 추계학술발표회 및 정기총회
    • /
    • pp.9-9
    • /
    • 1994
  • FMS를 비롯한 대부분의 제조시스템의 운용을 위해서는 크게 전략적 의사결저오가 전술적 읫사결저이 필요하며, 이 중 전술적 의사결증은 부품 선택, 생산율 결정, 부하할당, 부품 투입, 일정계획 문제등과 관련되어 있다. 본 연구에서는 부품투입시점과 부품투입순서에 의해 결정된 부품투입 정책이 시스템 성능에 미치는 영향을 알아보기 위해서, 서울대학교부설 자동화시스템공동연구소(ASRI)내의 FMS/CIM Center를 대상으로 시뮬레이션을 수행하였다. ASRI-FMS /CIM Center 는 기계가공과 조립이 동시에 이루어지는 FMAS(Flexible Mauufacturing & Assembly System) 형태의 모형공장이며, 현재 세 종류의 모터 등을 생산할 수 있다. 본 연구에서는 고려한 부품투입시점 전략으로는 고정 WIP(Work-in-process)유지전략 , 병목기계 전략, 일정비율 투입전략 등이며, 부품 투입순서 전략으로는 크게 주기적 투입전략과 비주기적 투입전략을 고려하였다. 또한 이러한 부품 투입정책들이 시스템 내에서 적용할 수 있는 여러 가지 우선순위규칙 등과 함께 사용될 때, 나타나는 상호관계를 파악하기 위한 연구가 수행되었다. 아울러 병목기계 추가도입, 물류운반시간의 감소 등과 같이 가능한 범위에서 현재의 시스템 조건이 바뀐 상황에 대해서도 시뮬레이션을 수행함으로써, 추후 변경된 시스템에서도 본 연구의 결과가 적응될 수 있도록 하였다.

  • PDF