The incentive and reasons to publish FIDIC Conditions of Contract for Design, Build and Operate Projects(DBO Form) are manifold. It is partly a response to the increasing need for sophisticated project delivery methods in both the public and private sectors and the already widespread use of the FIDIC Yellow Book with operation and maintenance obligations and partly a response to the challenge to decrease maintenance cost to a minimum by means of a new procurement route. As a result, FIDIC has developed a new model form to meet this market place requirement. On the other hand, FIDIC did not simply adapt the Yellow Book but has developed a new form from it, whilst preserving the style of the already known FIDIC Forms and maintaining the wording where it was not necessary to change it for the purposes of a DBO Form. Moreover DBO Form fills up supposed gaps in other FIDIC Forms and ameliorates the claim management and dispute management framework. FIDIC DBO approach may be shortly summarized as follows. First, DBO Form provides for single project responsibility. Second, DBO Form has the clear objective of ensuring the use of a most reliable and efficient technology at the lowest life-cycle cost. Third, DBO Form is intended to operate as an effective quality increase in the design and construction of projects. Fourth, DBO Form is intended to provide significant benefits with regard to system integration and reduction of risks. Fifth, DBO Form accelerates and enhances completion schedule compliance. Sixth, DBO takes care of all three supporting pillars of sustainability(including economical, environmental and social elements). DBO Form is obviously a good starting point for negotiations and the preparation of calls for tenders, thus saving the parties time and money. However, existing cultural and legal differences, particular local conditions and the particular needs of some branches of the industry may require the form to be adapted according to the particular needs of a project. And Civil law practitioners are strongly recommended to verify carefully the underlying legal concepts and background of each clause of the General Conditions in order to avoid unnecessary and sometimes unnatural changes and amendments being made. Note that when preparing the Particular Conditions ensure that terminology is consistent and that existing inherent concepts should not be ignored.
건설 클레임은 여러 가지 원인에 의해 야기되지만 선진국의 경우 대부분의 클레임에서 가장 근본적인 문제는 공기지연이며, 국내의 경우에도 이로 인한 분쟁이 증가할 것으로 예상된다. 이와 같이 건설공사에서는 공기지연으로 인해 발생하는 건설 클레임이 가장 빈번하지만 발생 형태가 복잡하여 분석하기가 매우 어려운 상황이다. 이러한 상황은 국제화, 개방화시대에 있어서는 해외뿐만 아니라 국내에서도 클레임에 의한 비용손실, 공기지연 등과 같은 문제점을 야기하게 될 것이다. 따라서 국제 계약실행과 국제계약에서 통용되는 조항에 대한 정확한 이해를 통하여 클레임 발생시 이에 대한 합리적 판단과 해결 방안을 모색해야 한 것이다. 본 연구의 목적은 국내 계약조건인 회계예규를 국제계약조건으로 발전시키기 위해 국제 계약조건인 FIDIC계약조건과 비교하여 그 문제점과 개선방안을 제시하는데 있다.
Many Korean construction companies have been performing a variety of overseas construction projects since the 1970s. It is unfortunate that in many cases they have had to suffer big losses caused by errors and defects in the design and construction of the projects. In the author's opinion, however, there were losses that could have been avoided if they had understood better the feature and content of the particular construction contract. Few lawyers and scholars in Korea have been interested in the research and study of international construction contracts. This is mainly because they do not have access to practical sources outside of Korea for them to research and study since the contracts undertaken have been dealt with by law firms in other jurisdictions to which the disputes apply. This article is aiming primarily at the introduction of the issues which the practitioners are likely to confront in the process of reviewing and performing the international construction contract. In some cases solutions are sought about these issues based upon the FIDIC standard terms and conditions, the actual experience of practice, and UNIDROIT Principles, etc. It is reasonable to say that all the issues related to the international construction contract cannot be covered in a short article like this. The author wishes this article could induce subsequent studies on international construction contracts for further research. It has to be noted that from time to time Korean construction practices have been compared to the international ones for better understanding. This article mostly includes cases where the Korean construction companies go overseas for their projects, while there are some cases where foreign developers and financial investors participated in domestic projects in which international construction contracts forms were adopted. A few precedent domestic writings about international construction contracts seems to lack emphasis on the points that there are several standard construction contract forms and that they are different. The differences are mainly in accordance with who bears the design responsibility, how the owner has to make progress payments to the contractor and who the funding source for the project is. This article tries to make it clear that there are significant differences between the standard contract forms, e.g. a simple construction form, a design-build form and an EPC/turnkey form of contract. Again, the author hopes that this article can arouse the interest in the international construction contracts from both academic and practical fields, so that many subsequent advanced articles can help our construction industry become much more competitive in the world through awareness of the methods of procurement and administration of the contracts.
The 6th International Conference on Construction Engineering and Project Management
/
pp.629-630
/
2015
'Sabine Pass Liquefaction Project (SPL Project)', a case study in this report, is the first construction project of a U.S. liquefaction facility for shale gas export overseas. This study analyzes the SPL Project to give understanding and a guideline to Korean EPC companies by benchmarking about effective risk-sharing strategies on EPC contracts. This study consists of three parts. The first summarizes the liquefaction process adopted on the SPL Project, named the 'ConocoPhillips Optimized Cascade Process', and compares it with other competitive liquefaction processes. The second introduces the unique features of the SPL EPC contract by comparing it with two other EPC forms of contracts: a FIDIC Silver Book for onshore plant projects and a contract of an offshore oil production (FPSO) project. The third focuses on the complexity of project financing (PF), especially lenders control and impact on the EPC contract such as covenant provisions to constrain variations and changes on the EPC Contract. From these conclusions, it is anticipated that this case study can provide a guideline for successful performance of Korean EPC contractors overseas.
Since the 1970s, international construction employers have commonly requested first demand guarantees upon their contractors as a form of security for due performance of their works. Contractors prefer the greater protection offered by more traditional forms of security requiring presentation of an arbitral award or other evidence of the caller's entitlement to compensation. Many contractors nonetheless feel that they have no alternative but to provide these unconditional guarantees in order to compete. However, these unconditional first demand guarantees are controversial and have given rise to numerous disputes both in arbitration and litigation. Disputes arising from first demand guarantees can be broken down into a) applications to prevent a perceived fraudulent or otherwise unfair or improper calling of a guarantee, b) claims arising from such abusive calls and c) claims relating to the consequences of such calls even if the call itself may not be abusive as such. The contractors should carefully assess the risk of an abusive call being made bearing in mind the difficulties he may face in seeking to prevent such a call. He should also bear in mind the difficulties, delays and cost he is likely to encounter in seeking to recover any monies wrongfully called. One option would be to provide that the call can only be made once and to the extent that the employer's damages have been assessed or even incurred or even for the default to have been established by an arbitral tribunal or court. Another option would be to provide that any call be accompanied by a decision of a competent and impartial third party stating that the contractor is in breach. For example, such a requirement could be incorporated into a construction contract based on the FIDIC Conditions by submitting this decision to a Dispute Adjudication Board. Another option would be to provide for the "ICC Counter-Guarantee Scheme". In sum, there would appear to be room for compromise between the employer and the contractor in respect of first demand guarantees by conditioning the entitlement to call such guarantees to the determination of a competent and impartial third party.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.