• Title/Summary/Keyword: External loading

Search Result 561, Processing Time 0.026 seconds

In-vitro development of a temporal abutment screw to protect osseointegration in immediate loaded implants

  • Garcia-Roncero, Herminio;Caballe-Serrano, Jordi;Cano-Batalla, Jordi;Cabratosa-Termes, Josep;Figueras-Alvarez, Oscar
    • The Journal of Advanced Prosthodontics
    • /
    • v.7 no.2
    • /
    • pp.160-165
    • /
    • 2015
  • PURPOSE. In this study, a temporal abutment fixation screw, designed to fracture in a controlled way upon application of an occlusal force sufficient to produce critical micromotion was developed. The purpose of the screw was to protect the osseointegration of immediate loaded single implants. MATERIALS AND METHODS. Seven different screw prototypes were examined by fixing titanium abutments to 112 Mozo-Grau external hexagon implants (MG Osseous$^{(R)}$; Mozo-Grau, S.A., Valladolid, Spain). Fracture strength was tested at $30^{\circ}$ in two subgroups per screw: one under dynamic loading and the other without prior dynamic loading. Dynamic loading was performed in a single-axis chewing simulator using 150,000 load cycles at 50 N. After normal distribution of obtained data was verified by Kolmogorov-Smirnov test, fracture resistance between samples submitted and not submitted to dynamic loading was compared by the use of Student's t-test. Comparison of fracture resistance among different screw designs was performed by the use of one-way analysis of variance. Confidence interval was set at 95%. RESULTS. Fractures occurred in all screws, allowing easy retrieval. Screw Prototypes 2, 5 and 6 failed during dynamic loading and exhibited statistically significant differences from the other prototypes. CONCLUSION. Prototypes 2, 5 and 6 may offer a useful protective mechanism during occlusal overload in immediate loaded implants.

A STUDY ON THE VARIOUS IMPLANT SYSTEMS USING THE FINITE ELEMENT STRESS ANALYSIS (수종의 임플랜트 시스템에 따른 유한요소법적 응력분석에 관한 연구)

  • Yu Seong-Hyun;Park Won-Hee;Park Ju-Jin;Lee Young-Soo
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.44 no.2
    • /
    • pp.207-216
    • /
    • 2006
  • Statement of Problem: To conduct a successful function of implant prosthesis in oral cavity for a long time, it is important that not only structure materials must have the biocompatibility, but also the prosthesis must be designed for the stress, which is occurred in occlusion, to scatter adequately within the limitation of alveolar bone around implant and bio-capacity of load support. Now implant which is used in clinical part has a very various shapes, recently the fixture that has tapered form of internal connection is often selected. However the stress analysis of fixtures still requires more studies. Purpose: The purpose of this study is to stress analysis of the implant prosthesis according to the different implant systems using finite element method. Material and methods: This study we make the finite element models that three type implant fixture ; $Br{\aa}nemark$, Camlog, Frialit-2 were placed in the area of mandibular first premolar and prosthesis fabricated, which we compared with stress distribution using the finite element analysis under two loading condition. Conclusion: The conclusions were as follows: 1. In all implant system, oblique loading of maximum Von mises stress of implant, alveolar bone and crown is higher than vertical loading of those. 2. Regardless of loading conditions and the type of system. cortical bone which contacts with implant fixture top area has high stress, and cancellous bone has a little stress. 3. Under the vertical loading, maximum Von mises stress of $Br{\aa}nemark$ system with external connection type and tapered form is lower than Camlog and Frialit-2 system with internal connection type and tapered form, but under oblique loading Camlog and Frialit-2 system is lower than $Br{\aa}nemark$ system.

Influence of Implant Abutment Systems on Detorque Value and Screw Joint Stability (임플랜트 지대주 종류가 나사풀림력과 연결부의 안정성에 미치는 영향)

  • Bae, Byung-Ryong;Choi, Yu-Sung;Cho, In-Ho
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.26 no.2
    • /
    • pp.97-109
    • /
    • 2010
  • Purpose : This study was designed to evaluate the influence of implant abutment materials on detorque value and screw joint stability before and after dynamic fatigue test. Materials & Methods : The external hexagonal fixture and three different groups of abutment (titanium abutments, zirconia abutments, and UCLA abutments) were used. The detorque value before loading and after loading (cyclic loading up to $10^5$ cycles) of the abutment screw were measured. Result : 1. There was no significant difference in detorque value before loading among the each group. 2. There was no significant difference in detorque value after loading among the each group. 3. Detorque values before and after cyclic loading in each group were not significantly different. 4. There was no significant difference in loss percentage of removal torque before loading among the each group. 5. There was no significant difference in loss percentage of removal torque after loading among the each group. 6. There was no significant difference in loss percentage of removal torque according to loading among the each group. Conclusion : Short term screw loosening of three types of abutment was not significantly different. When bite force was applied, there was no significant difference in screw loosening between before loading and after loading.

Retrospective study on marginal bone resorption around immediately loaded implants (즉시 하중 임플란트에서 변연골 흡수량에 관한 후향적 연구)

  • Lee, Sung-Hoon;Jung, Ji-Hye;Lee, Jin-Han;Cho, Hye-Won
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.56 no.2
    • /
    • pp.114-119
    • /
    • 2018
  • Purpose: Patients who treated implant immediate loading within a week after implant placement at Wonkwang University Dental Hospital Implant Center were evaluated marginal bone resorption. These retrospective analyses are intended to reinforce the clinical evidence for the implant immediate loading. Materials and methods: Medical history and radiographic data were investigated, which were the patients' who treated implant immediate loading and restoration with provisional prostheses between January 2005 and June 2016, at Wonkwang University Dental Hospital Implant Center. Total number of implants was 70, marginal bone resorption was measured according to implant length, diameter and connection type. To measure marginal bone resorption, periapical radiographs were taken when the implants were placed and after 6 month. Statistical analysis was done in Mann-whitney U test and Kruskal-wallis test with SPSS 22.0 software (P<.05). Results: Mean marginal bone resorption around immediately loaded implants according to implant connection type was shown $1.24{\pm}0.72mm$ in internal hexagon connection type and $1.73{\pm}1.27mm$ in external hexagon connection type. There was no statically significant difference in marginal bone resorption with implant length and diameter. Conclusion: Implants with immediated loading in internal hexagon connection type showed less marginal bone resorption significantly than in external hexagon connection type.

Organic Matter Sources in a Reservoir (Lake Soyang); Primary Production of Phytoplankton and DOC, and External Loading (식물플랑크톤의 세포외배출유기물을 고려한 소양호의 1차생산과 유기물 부하)

  • Nam, Kung-Hyun;Hwang, Gil-Son;Choi, Kwang-Soon;Kim, Chul-Goo;Kim, Bom-Chul
    • Korean Journal of Ecology and Environment
    • /
    • v.34 no.3 s.95
    • /
    • pp.166-174
    • /
    • 2001
  • The autochthonous and allochthonous organic carbon loading were measured in Lake Soyang, to estimate the amount of carbon loading into the lake and the contribution of their sources to tile lake's carbon loading. Autochthonous carbon loading was estimated from phytoplankton primary production with the extracellular organic carbon (EOC). Allochthonous loading was determined by measuring dissolved organic carbon (DOC) and particulate organic carbon (POC) concentration in the main inflowing Soyang River. Both autochthonous and allochthonous organic carbon loading were high during the svmmer, from July to September, and accounted for 43.2% and 71.7% of the annual loading, respectively. Primary productivity was elevated up to $1,000\;mgC\;m^{-2}\;d^{-1}$ during summer and lowest in winter. EOC production from phytoplankton was also large in summer, resulting in a high DOC concentration in the lake water. Primary production of phytoplankton and allochthonous organic matter loading from the watershed contributed to 53.6% and 46.4% of total loading, respectively. The EOC production accounted far $4.4{\sim}21.2%$ of POC primary production, implying that EOC production of phytolankton must be considered in estimation of primary production.

  • PDF

Nitrogen Removal Characteristics in Two-Sludge System of SBR Type Using Sewage Wastewater of Low C/N Ratio (낮은 C/N 비에서 운영되는 SBR 유형의 Two-Sludge 공정의 질소 제거 특성)

  • Ryu, Hong-Duck;Kim, Hak-In;Lee, Sang-Ill
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.28 no.1
    • /
    • pp.7-14
    • /
    • 2006
  • In this study, nitrogen removal characteristics of SBR3 process, which is two-sludge system of sequencing batch reactor(SBR) type, were investigated, with comparison of those of SBR1 process, which is conventional SBR process, and SBR2 process, which was designed to enhance denitrification efficiency through step-feeding of wastewater, using domestic wastewater. SBR3 process of two-sludge type can perform external nitrification, on which nitrification occurs in separated reactor, and enhanced denitrification using biosorbed organics. In the results with domestic wastewater, T-N removal efficiency of SBR3 process was better than those of SBR1 and SBR2 processes. It was observed that bigger difference of T-N removal efficiency between SBR3 process and SBR1 & SBR2 processes was showed at low C/N ratio than that at high C/N ratio resulting from more efficient use of organics by biosorption mechanism in denitrification of SBR3 process than those of SBR1 and SBR2 processes. In addition, T-N removal efficiency of SBR3 process according to influent T-N loading rate was better than those of SBR1 and SBR2, even though influent T-N loading rate of SBR3 process was higher than that of SBR1 and SBR2 process resulting from operation of SBR3 process in short hydraulic retention time(HRT) by external nitrification.

Experimental study on all-bolted joint in modularized prefabricated steel structure

  • Wu, Zhanjing;Tao, Zhong;Liu, Bei;Zuo, Heng
    • Structural Engineering and Mechanics
    • /
    • v.73 no.6
    • /
    • pp.613-620
    • /
    • 2020
  • The research study is focuses on a form of all-bolted joint with the external ring stiffening plate in the prefabricated steel structure. The components are bolted at site after being fabricated in the factory. Six specimens were tested under cyclic loading, and the effects of column axial compression ratio, concrete-filled column, beam flange sub plate, beam web angle cleats, and spliced column on the failure mode, hysteretic behavior and ductility of the joints were analyzed. The results shown that the proposed all-bolted joint with external ring stiffening plate performed high bearing capability, stable inflexibility degradation, high ductility and plump hysteretic curve. The primary failure modes were bucking at beam end, cracking at the variable section of the external ring stiffening plate, and finally welds fracturing between external ring stiffening plate and column wall. The bearing capability of the joints reduced with the axial compression ratio increased. The use of concrete-filled steel tube column can increase the bearing capability of joints. The existence of the beam flange sub plate, and beam web angle cleat improves the energy dissipation, ductility, bearing capacity and original rigidity of the joint, but also increase the stress concentration at the variable section of the external reinforcing ring plate. The proposed joints with spliced column also performed desirable integrity, large bearing capacity, initial stiffness and energy dissipation capacity for engineering application by reasonable design.

Fatigue tests of damaged tubes under flexural loading

  • Ghazijahani, Tohid Ghanbari;Jiao, Hui;Holloway, Damien
    • Steel and Composite Structures
    • /
    • v.19 no.1
    • /
    • pp.223-236
    • /
    • 2015
  • Despite the proliferation of the industrial application of steel tubes, the effect of collision on the surface of steel tubes subject to cyclic loading has largely remained untouched. This paper studies the fatigue behavior of steel tubes which are impacted by an external object. A dent imperfection caused by a collision was modeled and fatigue tests were conducted using a MTS machine. Fatigue life as well as the failure modes were thoroughly discussed in a way that the fatigue life of the dented tubes with similar geometrical specifications at full-scale can be generalized.

Fractions of Phosphorus in the Surficial Sediment of Dongjin Sea Area (동진강 해역 표층 퇴적물 중 인의 화학적 형태별 함량)

  • Lee, Hyun-Jeong;Son, Jae-Gwon;Park, Bong-Ju;Cho, Jae-Young
    • Journal of Korean Society of Rural Planning
    • /
    • v.11 no.4 s.29
    • /
    • pp.25-31
    • /
    • 2005
  • The present study was carried out to investigate the P fractions of surfical sediment of Dongjin sea area. Furthermore, potential released loading of adsorbed and non-apatite inorganic phosphorus were investigated in the sediment of Dongjin sea area. The contents of phosphorus fractions of the surficial sediment in Dongjin sea area were adsorbed-P 0.06%, nonapatite inorganic-P 13.02%, apatite-P 60.22%, and residual-P 26.70%. The most abundant fraction was apatite-P, residual-P, nonapatite inorganic-P, and adsorbed-P followed it. Potential released loading of adsorbed and non-apatite inorganic phosphorus surveyed 2.6 and 597ton respectively. These results show that sediment-managing and interception from external pollution are needed for water environmental maintenance of Dongjin sea area.

Automatic Landing System of Container Spreader (컨테이너 스프레더의 자동 랜딩 시스템)

  • 박경택;박찬훈;박영근
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1688-1692
    • /
    • 2003
  • The automatic Landing system is used for the automatic functions of automatic transfer crane in the automated container terminal. It confirms and adjusts the alignment and pose between spreader and container and accomplishes the automatic loading/unloading job of containers in yard. Specially, it is required in the automated container terminal and is well adapted under the coarse external environments. This system used the laser sensors to recognize the alignment between spreader and container. In this paper the algorithm of recognition of the alignment and pose is presented and the result of its simulation is shown.

  • PDF