• Title/Summary/Keyword: Expansion Joints

Search Result 142, Processing Time 0.024 seconds

Rapid full-scale expansion joint monitoring using wireless hybrid sensor

  • Jang, Shinae;Dahal, Sushil;Li, Jingcheng
    • Smart Structures and Systems
    • /
    • v.12 no.3_4
    • /
    • pp.415-426
    • /
    • 2013
  • Condition assessment and monitoring of bridges is critical for safe passenger travel, public transportation, and efficient freight. In monitoring, displacement measurement capability is important to keep track of performance of bridge, in part or as whole. One of the most important parts of a bridge is the expansion joint, which accommodates continuous cyclic thermal expansion of the whole bridge. Though expansion joint is critical for bridge performance, its inspection and monitoring has not been considered significantly because the monitoring requires long-term data using cost intensive equipment. Recently, a wireless smart sensor network (WSSN) has drawn significant attention for transportation infrastructure monitoring because of its merits in low cost, easy installation, and versatile on-board computation capability. In this paper, a rapid wireless displacement monitoring system, wireless hybrid sensor (WHS), has been developed to monitor displacement of expansion joints of bridges. The WHS has been calibrated for both static and dynamic displacement measurement in laboratory environment, and deployed on an in-service highway bridge to demonstrate rapid expansion joint monitoring. The test-bed is a continuous steel girder bridge, the Founders Bridge, in East Hartford, Connecticut. Using the WHS system, the static and dynamic displacement of the expansion joint has been measured. The short-term displacement trend in terms of temperature is calculated. With the WHS system, approximately 6% of the time has been spent for installation, and 94% of time for the measurement showing strong potential of the developed system for rapid displacement monitoring.

A Study on the Effect of Applying Water Seepage Lowering Method Using Swelling Waterstop for Expansion Joint in the Concrete Dam (콘크리트 댐에서 수축이음부의 수팽창성 차수재를 이용한 침투저감 공법 적용효과 연구)

  • Han, Kiseung;Lee, Seungho;Kim, Sanghoon;Kim, Sejin;Pai, Sungjin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.10
    • /
    • pp.21-29
    • /
    • 2021
  • Most concrete gravity-type dams in and out of the country were constructed by column method to control cracks caused by concrete hydration heat generated during construction, resulting in a certain level of leakage after impoundment through various causes, such as contraction joints and construction joints. However, due to the characteristics of concrete structures that shrink and expand according to temperature, concrete dams have vertical joints and drains to allow penetration. PVC waterproof shows excellent effects in completion of the dam, which however increases the possibility of interfacial failure due to different thermal expansion. Other causes of penetration may include problems with quality control during installation, generation of cracks due to heat of hydration of concrete, waterproofing methods, etc. In the case of Bohyunsan Dam in Yeongcheon, North Gyeongsang Province, the amount of drainage in the gallery was checked and underwater, and it was confirmed that there are many penetrations from drainage holes connected to vertical joints, and that some of the PVC waterproofs are not fully operated. As a new method to prevent penetration through vertical joints, D.S.I.M. (Dam Sealing Innovation Method) developed by World E&C was applied to Bohyunsan Dam and checked the amount of drainage in the gallery. As a result of first testing three most leaking vertical joints, the drain in the gallery was reduced by 87% on the average and then applied to the remaining 13 locations, which showed a 83% reduction effect based on the total drain in the gallery. Summing up these results, it was found that D.S.I.M. preventing water leakage from the upstream face is a valid construction method to reduce the water see-through and penetration quantity seen in downstream faces of concrete dams. If D.S.I.M. is applied to other concrete dams at domestic and abroad, it is expected that it will be very effective to prevent water leakage through vertical joints that are visible from downstream faces.

Joining of Ceramic and Metal using Active Metal Brazing (활성금속 브레이징을 사용한 세라믹과 금속의 접합)

  • Kee, Se-Ho;Xu, Zengfeng;Jung, Jae-Pil;Kim, Won-Joong
    • Journal of the Microelectronics and Packaging Society
    • /
    • v.18 no.3
    • /
    • pp.1-7
    • /
    • 2011
  • Active brazing of ceramic to metal is reviewed in this paper. As one of the key aspect in joint techniques, active brazing has been developed to simplify the manufacturing procedure of brazed joints between ceramic and metal. The active filler metal includes Ag-Cu-Ti series, Cu-Ti series, Co-Ti series and so on. The active filler metal which supplies the chemical bonds between ceramic and metal, enhances the wetting of filler metal on ceramic surface and eliminates the need for metallization treatments. The residual stress caused by difference of coefficient of thermal expansion between ceramic and metal, holds a direct influence on the bonding strength and even results in a fracture. Good joints of ceramic to metal promote the miniaturization and simplicity of electronic components with multifunction.

Improvement Method of Waterproofing Design in Underground Parts of Apartments (국내 공동주택 지하 부위별 방수설계 개선 방안)

  • Lee, Jung-Hun;Kim, Bum-Soo;Song, Je-Young;Kim, Soo-Yeon;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.129-130
    • /
    • 2017
  • By comparing the survey and the actual situation at hand, the results showed that the lowest floor slab, wall construction joints, and floor expansion joints were the most prone to leakage. A waterproofing design method in underground parts of apartments is proposed to prevent leakage in underground of apartments. Further research is required for the establishment of this detailed design and construction guideline in regards to this study.

  • PDF

A Study on the Protection of Smoke Control Performance in Building Enclosure to Prevent the Expansion of Smoke in Fire (화재시 연기확대 방지를 위한 건축물 구획공간에서의 방연성능 확보에 관한 조사 연구)

  • Jin, Seung-Hyeon;Kim, Hye-Won;Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.91-92
    • /
    • 2019
  • In case of fire in a compartmentalized building area, a number of casualties are caused by smoke production. Accordingly, openings, penetrations and joints in compartmentalized spaces should be secured not only for fire resistance but also for smoke-proofing. However, domestic test regulations stipulate test methods for refractory performance of penetrations and joints, but do not specify separate deferral performance. In the case of openings, the test for the smoke performance exists at room temperature, but the smoke performance at high temperature is not secured, so countermeasures are needed.

  • PDF

Joints: the weak link in bridge structures and lifecycles

  • Yanev, Bojidar
    • Smart Structures and Systems
    • /
    • v.15 no.3
    • /
    • pp.543-553
    • /
    • 2015
  • The condition of the vehicular bridge network in New York City, as represented by ratings obtained during biennial inspections is reviewed over a period of three decades. Concurrently, the bridges comprising the network are considered as networks of structural elements whose condition defines the overall bridge condition according to New York State assumptions. A knowledge-based matrix of assessments is used in order to determine each element's vulnerability and impact within the network of an individual structure and the network of City bridges. In both networks expansion deck joints emerge as the weak link. Typical joint failures are illustrated. Bridge management options for maintenance, preservation, rehabilitation and replacement are examined in the context of joint performance.

Evaluation of Shear Strength of Reinforced Concrete Slabs Connected by Hinged Joints (활절점으로 연결된 철근콘크리트 슬래브의 전단내력평가)

  • Kim Sang-Sik;Choi Kwang-Ho;Chai Hyee-Dai;Lee Jung-Yoon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.639-642
    • /
    • 2004
  • Lately outmoded and functionally obsolete buildings are often remodelled and restored. When existing reinforced concrete(RC) apartments are remodelled, one of main reasons of the remodelling is to expand dwelling space. The experimental or theoretical research on plane expansion of RC apartments is quite scare. In this research, 9 RC slabs connected by hinged joints were tested. The test results indicated that the shear strength of the RC test slabs having various types of dowel bars was about twice that calculated by the ACI 318-02 code.

  • PDF

Design Review of Inter-Modal Terminal Platform for Temperature Load (온도하중을 고려한 인터모달 터미널 플랫폼의 설계 검토)

  • Kim, Kyoung-Su;Kim, Da-Ae;Kim, Heung-Rae;Hyun, Eun-Tack
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.32 no.5
    • /
    • pp.305-311
    • /
    • 2019
  • In this study, we examined the proper spacing between the expansion joints according to the temperature load of the inter-modal terminal platform infrastructure to implement a new inter-modal automated freight transport system, which we intend to introduce in Korea. To review the proper expansion joint spacing of the terminal platforms, we set the maximum expansion joint spacing according to the regional temperature changes using the equation proposed by the Federal Construction Council (FCC) of the United States. Then, the maximum displacement value, which was calculated through the structural analysis program, and the limit of the horizontal displacement of the building structure were compared. The proper expansion joint spacing was selected as the slab length at which the maximum displacement of the structure, due to temperature changes, was below the horizontal displacement limit. Based on the application of maximum expansion joint spacing for each region calculated through the FCC's suggestion, the maximum displacement that could occur within the limit of the lateral displacement of the structure was determined.

A Study on Construction Method for Joints between Old and New Concrete Deck Slabs (콘크리트 교량 바닥판 신구접합부의 시공방안에 관한 연구)

  • Paek Nak Seung;Choi Young Chul;Cha Soo Won;Oh Byung Hwan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.363-366
    • /
    • 2005
  • When widening or repairing concrete deck slab, there is a joint inevitably. However, joining-construction method have following problem, that is the additional stress in existing part of bridge resulting from the specific process of joining-construction and the difference of amount of shrinkage between new and existing bridge. On this study, compared shrinkage stress of the direct joining construction method with the indirect joining construction method, and concluded the proper substitution rate of expansion cement. The rate of replacement was proper at $10\%$. but more than $15\%$, concrete had excessive expansion and weeker compressive strength. The time of placing closure concrete, considering the shinkage stresses and creep, was suitable in $45\~60$ days after placing the new concrete deck slab.

  • PDF

Track Longitudinal Irregularities at Bridge Deck Expansion Joint with ZLR(Zero Longitudinal Restraint) (활동체결장치가 설치된 교량상판 신축이음부에서의 궤도고저틀림에 미치는 영향)

  • Eom, Jong-Woo;Kim, Si-Chul;Kim, In-Jae
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1093-1098
    • /
    • 2007
  • In designing the high-speed railroad track, it is important to utilize appropriate track components to maintain uniform stiffness and ensure track alignment within the tolerance set for that system. In this regard, continuous welded rails (CWRs) were introduced to the Korean railways. Yet the installation of CWRs can result in an adverse impact due to the track/structure interaction on bridge sections yielding variations in the stiffness at the expansion joints. It may also impose additional axial force, generate excessive stress or deflection on track, and loosen the ballast at the ends as a bridge deck contracts or expands owing to a thermally-induced dynamic response. The risk is even greater in a long bridge deck, resulting in track longitudinal irregularities, deteriorating passenger's comfort, and increasing maintenance efforts. This study evaluates the performance of ZLR and their impact on track longitudinal irregularities through the track measuring results on a test section installed the ZLR in order to minimize the thermally-induced responses and the maintenance efforts for the high speed railway bridges.

  • PDF