• Title/Summary/Keyword: Existing subway

Search Result 190, Processing Time 0.022 seconds

Effect of Reducing Squeal Noise at Railway of Curve Section by using the Watering (살수를 이용한 철도곡선구간 스퀼소음 저감효과에 관한 연구)

  • Ji, Hae-Young;Koo, Dong-Hoe;Jeon, Seung-Woo
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2928-2933
    • /
    • 2011
  • The urban railway has been planned not only the subway, but also the elevated railway in Seoul, South Korea. Therefore, it is steadily increasing civil complaints for railway noise passing through that residential district. In this paper, we focused on noise of squeal characteristics induced by interaction between railway vehicle's wheel and rail. Then we selected the point that carried out scattering water droplet to the rail and compared the noise level of the watering test results before and after. Scattering water test results showed that level of the noise reduced intermittently occurring high frequency characteristics of squeal noise as well as overall noise level. In the future, we will apply the sensor to the sprinkling system for noise reduction where the place of existing squeal noise is, and make a suggestion of this solution will be more economical, environmental-friendly, and appropriate to reduce the squeal noise occurred by railway vehicle than others.

  • PDF

Suggestion for Train Vibration Equations based on Change in Track System (궤도구조 변경에 따른 열차 진동 추정식 제안)

  • 김응록;박연수;강성후;박선준;김흥기
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.1
    • /
    • pp.48-54
    • /
    • 2002
  • This research estimated decreased vibration level as quantitative according to change of track system on Seoul Subway Line No. 1 from existing ballasted track system(Pandrol type clip) to concrete track system(Youbgdan type isolation rubber clip). Following change to concrete system, vibration level at tunnel floor decreased between 4-8dB(V). Vibration equations suggested in this paper consider the velocity of train and can estimate quantitative vibration response. These are divided by ultimate limit state($\beta$=0), serviceability limit state($\beta$=1.28) and safety state($\beta$=3), respectively. The reliability index, $\beta$=0, means 50% data line obtained by least squares best-fit line. The reliability index $\beta$=1.28 and 3 represent boundaries below 90% and 99.9% respectively.

A Study on Performance Evaluation of On-board Electric Device of TTX(Tilting Train Express) (틸팅열차(TTX)의 정장품 성능평가 연구)

  • Han, Seong-Ho;Lee, Su-Gil;Seo, Sung-Il
    • Proceedings of the Korean Society For Composite Materials Conference
    • /
    • 2005.11a
    • /
    • pp.239-242
    • /
    • 2005
  • This paper introduced an approach of improvement of performance of Electric device for EMU type Train like as TTX. The electric equipments are characterized by insulation, Noise, cooling system etc. and Their weight arc decided by these factors. There are two kinds of power source in EMU train. First, DC voltage source, 1500 volt, 750 volt is used for subway system. Second, AC power source 25000 volt is applied to high speed train and existing main lines. Composite material has the protection of inrush current and high frequency noise. We can use this material to minimize weight of train. Additionally we can get energy saving when operator service TTX.

  • PDF

A study of open cut box curvert tunnel strengthening systems in domestic underground railway (도시철도 개착식 터널의 내진성능보강시스템 개발에 대한 연구)

  • Kim, Ki-Hong;Kwon, Min-Ho;Kim, Jin-Ho;Hur, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1132-1137
    • /
    • 2010
  • There are execute of new laws about prevent of earthquake diaster in nation because of some increments of big earthquake occurence frequency. Now develope new composit plate by ductile fiber with strong mechanic materials, which compose of strengthening systems for the underground structures subject to forced displacements. This study is to focus to develop the retrofitting system for the cut and cuver tunnels built without earthquake type load scenario, so that it can provide the safety of existing urban subway system against earthquakes.

  • PDF

The Study on the Prediction and Measurement for the Behaviour of Structures and Weathered Soil & Rock in Excavating the Ventilation Shaft (지하철 개착구 굴착시 주변자반과 구조물에 대한 거동예측과 실측의비교평가)

  • 김융태;안대영;김득기;한창헌
    • Tunnel and Underground Space
    • /
    • v.4 no.1
    • /
    • pp.63-76
    • /
    • 1994
  • This paper discusses contents of the existing design, the behaviours prediction on the strut and retaining wall around subsurfaces, and also evaluates the measured results in comparison with the management criterion during excavation period of ventilation shaft at Pusan-Subway 220. Field measurements showed that maximum displacement 23.74 mm at boundary site of multistratification and the weathered rock to be formed at 0.2~0.6 H of total excavating depth(H), 68 ton of maximum axial force and 4.4X102 kg/cm2 of stress on strut. The measured axial force exceeds prediction levels by up to 50 percent at the weathered soil & rock, and the others come under the category of their levels. The great gap of both field measurements and prediction on behaviour makes a difference of the site situation at the design stage and the practical working. This measured value is greatly safety in comparison with that of the safety criterion, but axial force at 4~5 strut of ventilation shaft l is higher than the prediction.

  • PDF

A study on the Multipurpose Usage of Incheon International Airport Railway - Focusing on the Improvement of Connecting Systems - (인천국제공항철도의 다목적 활용방안 - 연계체계 개선을 중심으로)

  • Park Jeong-Soo;Won Jai-Mu;Han Woo-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.6 s.31
    • /
    • pp.610-616
    • /
    • 2005
  • The Incheon International Airport Express(I'Rex) is the railroad that connects Incheon International Airport, Gimpo Airport and Seoul Station. I'Rex is now under construction, and it will be connected to Gimpo Airport by 2007, to Seoul Station by 2010. However, there has been no discussion on how th connect different routes of railway Systems. Therefore it seems likely that rail passenger demand will be lower than that of limousine bus. Therefor, this paper proposes 4 effective connecting methods for I'Rex - (1) Shuttle transport, (2) Short-distance connecting transport (Inside I'Rex, Seoul Subway Line 9, 'Han-River line') (3) Mid-distance connecting transport (Jung-ang, Tae-baek, Young-dong line) (4) Long-distance connecting transport (Korean Train Express (Korean high speed railroad)) These methods can increase the connectivity of I'Rex with existing railroads and the competition power of I'Rex against a highway.

Study on the Prediction of Ground-Borne Vibration with Distance induced by Subway Transit System (지하철에 의한 거리별 지반진동 예측에 관한 연구)

  • 김득성;김형곤;장서일
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.597-602
    • /
    • 2002
  • This study reviews several of the procedures that have been used to predict ground-born vibration. The vibration responses are measured at three sites that have different soil qualities. The measured vibration levels are compared with the predicted results by previously used vibration level prediction models. In this study a numerical method, which is based on explicit differential method, is used to compensate tot existing prediction models. Although numerically computed results are not quantitatively in good agreement with the measured results, the trends are comparable in the sense that vibration level does not decrease monotonically with distance. Also, The site with the deepest tunnel gives the highest vibration level.

  • PDF

Construction of a 300-Meter Vertical City: Abeno Harukas

  • Mizutani, Kenichi;Hirakawa, Kiyoaki;Nakashima, Masato
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.3
    • /
    • pp.199-207
    • /
    • 2015
  • Abeno Harukas is the tallest building in Japan and is located in Abeno, which is one of the three main railway transport nodes in Osaka. This building has a height of 300 meters, and its lowest levels are 30 meters below ground. It contains a department store, museum, offices, a hotel, and an observatory. In this urban renewal project, a section of the department store that encloses the station was dismantled and replaced by a supertall building complex, while infrastructure was simultaneously constructed, including: upgrades to the station and the existing department store, improved connections to the subway and pedestrian bridges, and a new pedestrian walkway over the road. In this paper, the ingenious erection processes, newly developed technologies, and precise construction management techniques are introduced for Japan's tallest building.

The Study for execution procedural to apply CBTC(Communication Based Train Control) on the subway (통신을 이용한 열차제어시스템의 기존 도시철도 적용을 위한 시행절차연구)

  • Kim, You-Ho;Lee, Hoon-Koo;Lee, Soo-Hwan;Kim, Jong-Ki;Baek, Jong-Hyen
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.357-360
    • /
    • 2003
  • Improvement is required to solve problems depending on long term use of signal equipment in the existing city railroad and to raise quality of passenger services. Accordingly, for more efficient improvement, we examined the procedure of executing construction of the communication based train control system in Korean city railroads, which is globally studied. The procedure of executing construction of the system is to present a plan for construction first of ail and then to prepare a strategy for construction of the system. It is required to establish a procedure for execution in each step depending on the prepared strategy and then to establish a detailed execution plan. We studied such an execution procedure, divided the execution procedure for application of the train control system through five steps to prepare the execution procedure.

  • PDF

A Study on the Vibration Characteristics of Subway Structure by Train Load (열차 하중에 의한 지하철 구조물의 진동 특성에 관한 연구)

  • Park, Sung Woo;Park, Seung Su;Hwang, In Baek
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.4
    • /
    • pp.107-115
    • /
    • 2011
  • In this study, the vibration analysis of the underground box structures induced train movement is studied. In order to perform these analysis, dynamic data, which was measured when subway is in service, are gained by attaching accelerometers on the structure such as lower beam, lateral wall and upper slab. Also, accelerometers are attached on the lower beams and side walls of the gravel ballast and concrete ballast sections in order to compare vibration due to ballast materials. The vibration results of upper slabs and lower beams reveal that the vibration on the upper slabs is greater than the lower beams. Also, the results of the crack gauge on the upper slab show that crack width dose not change due to vibration, These means that the effect of the vibration on the structure is very limited. In order to evaluate the vibration of the structure, acceleration unit is converted to velocity unit comparing with the existing velocity data gained from the platforms.