• 제목/요약/키워드: Execution Phase

검색결과 191건 처리시간 0.026초

A SIMULATION MODEL FOR DECIDING AN OPTIMIZED 3D SHAPE OF CONSTRUCTION WORKSPACE CONSIDERING RESOURCES IN BIM ENVIRONMENT

  • Hyoun Seok Moon;Hyeon Seung Kim;Leen Seok Kang;Byung Soo Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.163-168
    • /
    • 2013
  • A construction workspace is considered as a critical factor to secure constructability and safety of a project. Specially, optimized size of each workspace helps to minimize any conflicts between workspaces, works and resources within a workspace in the construction site. However, since an existing method for making a decision workspace's size depends on generally experiences of managers and work conditions of activity, it is difficult to perform safe works considering feasible workspace size. The workspace size is changed according to the quantity of resources allocated into each activity as time progresses. Accordingly, it is desirable that optimized workspace size considering input size of resources is determined. To solve these issues, this study configures an optimized model for deciding standard size of workspaces by simple regression analysis and develops a visualized scenario model for simulating the optimized workspace shape in order to support BIM (Building Information Modeling) environment. For this, this study determines an optimized resource shape size considering maximum working radius of each resource and constructs its visual model. Subsequently, input size of resources for each activity is estimated considering safety execution area of resources and workspaces. Based on this, an optimized 3D workspace shape is generated as a VR simulation model of a BIM system based on the suggested methodologies. Moreover, operational feasibility of the developed system is evaluated through a case study for a bride project. Therefore, this study provides a visualized framework so that project managers can establish an efficient workspace planning in BIM environment. Besides, it is expected that constructability, productivity and safety of the project will be improved by minimizing conflicts between workspace and congestions between resources within a workspace in the construction phase.

  • PDF

BIM 데이터 기반 현장 시공관리 사례 분석 연구 (A Case Study on Construction Management Based on BIM Data)

  • 이동준;현진오;민성규;임지용;신민철;권석현
    • 대한토목학회논문집
    • /
    • 제44권2호
    • /
    • pp.223-229
    • /
    • 2024
  • 국토교통부에서는 설계 BIM 데이터를 시공 단계에 반영하기 위해 『건설산업 BIM 시행지침 시공자 편』을 제시하였다.(이하, '시행지침'이라 함.) 시행지침은 건설산업 전 분야의 전면 BIM 적용을 위하여 발주, 설계, 시공단계에 필요한 최소한의 BIM 업무 방법 및 절차 등의 세부 공통 실행방안의 가이드라인을 제공하기 위한 목적으로 작성되었다. 본 연구에서는 시행지침을 기준으로 간섭 및 설계오류를 검토하고, 장비배치 및 운영계획을 수립했던 다양한 현장에 대해 적용 효과를 파악하였다. 그 결과, 디지털 현장 3D 모델과 계획 모델을 한 공간에서 비교하여 직관적인 검토가 가능하였고, 시공 단계별 시뮬레이션 검토를 통해 최적의 장비배치 및 운용계획을 도출하였다.

Apache Spark을 이용한 병렬 DNA 시퀀스 지역 정렬 기법 구현 (Implementation of Parallel Local Alignment Method for DNA Sequence using Apache Spark)

  • 김보성;김진수;최도진;김상수;송석일
    • 한국콘텐츠학회논문지
    • /
    • 제16권10호
    • /
    • pp.608-616
    • /
    • 2016
  • Smith-Waterman(SW) 알고리즘은 DNA 시퀀스 분석에서 중요한 연산 중 하나인 지역 정렬을 처리하는 알고리즘이다. SW 알고리즘은 동적 프로그래밍 방법으로 최적의 결과를 도출할 수 있지만 수행시간이 매우 길다는 문제가 있다. 이를 해결하기 위해서 다수의 노드를 이용한 병렬 분산 처리 기반의 SW 알고리즘이 제안되었다. Apache Spark을 기반으로 하는 병렬 분산 DNA 처리 프레임워크인 ADAM에서도 SW 알고리즘을 병렬로 처리하고 있다. 하지만, ADAM의 SW 알고리즘은 Smith-Waterman 이 동적프로그래밍 기법이라는 특성을 고려하지 않고 있어 최대의 성능을 얻지 못하고 있다. 이 논문에서는 ADAM의 병렬 SW 알고리즘을 개선한다. 제안하는 병렬 SW 기법은 두 단계에 걸쳐 실행된다. 첫 번째 단계에서는 지역정렬 대상인 DNA 시퀀스를 다수의 파티션(partition)으로 분할하고 분할된 각 파티션에 대해서 SW 알고리즘을 병렬로 수행한다. 두 번째 단계에서는 파티션 각각에 대해서 독립적으로 SW를 적용함으로써 발생하는 오류를 보완하는 과정을 역시 병렬로 수행한다. 제안하는 병렬 SW 알고리즘은 ADAM을 기반으로 구현하고 기존 ADAM의 SW와 비교를 통해서 성능을 입증한다. 성능 평가 결과 제안하는 병렬 SW 알고리즘이 기존의 SW에 비해서 2배 이상의 좋은 성능을 내는 것을 확인하였다.

FPGA를 이용한 유도 전동기의 디지털 전류 제어 시스템 구현 (Implementation of the Digital Current Control System for an Induction Motor Using FPGA)

  • 양오
    • 전자공학회논문지C
    • /
    • 제35C권11호
    • /
    • pp.21-30
    • /
    • 1998
  • 본 논문에서는 FPGA를 이용하여 산업용 구동장치로 널리 사용되고 있는 유도 전동기의 디지털 전류 제어시스템을 구현하였다. 이를 위해 VHDL을 이용하여 FPGA를 설계하였으며 이 FPGA는 PWM 발생부, PWM 보호부, 회전속도 검출부, 프로그램 폭주 방지부, 인터럽트 발생부, 디코더 로직부, 신호 지연 발생부 및 디지털 입·출력부로 각각 구성되어있다. 본 FPGA의 설계시 고속처리의 문제점을 해결하기 위해 클럭전용핀을 활용하였으며 또한 40 MHz에서도 동작할 수 있는 삼각파를 만들기 위해 업다운 카운터와 래치부를 병렬 처리함으로써 고속화하였다. 특히 삼각파와 각종 레지스터를 비교 연산할 때 많은 팬아웃 문제에 따른 게이트 지연(gate delay) 요소를 줄이기 위해 병렬 카운터를 두어 고속화를 실현하였다. 아울러 삼각파의 진폭과 주파수 및 PWM 파형의 데드 타임 등을 소프트웨어적으로 가변 하도록 하였다. 이와 같은 기능들을 FPGA로 구현하기 위하여 퀵로직(Quick Logic)사의 pASIC 2 SpDE와 Synplify-Lite 합성툴을 이용하여 로직을 합성하였다. 또한 Verilog HDL 환경에서 최악의 상황들(worst cases)에 대한 최종 시뮬레이션이 성공적으로 수행되었다. 아울러 구현된 FPGA를 84핀 PLCC 형태의 FPGA로 프로그래밍 한 후 3상 유도전동기의 디지털 전류 제어 시스템에 적용하였다. 이를 위해 DSP(TMS320C31-40 MHz)와 FPGA, A/D 변환기 및 전류 변환기(Hall CT) 등을 이용하여 3상 유도 전동기의 디지털 전류 제어 시스템을 구성하였으며, 디지털 전류 제어의 효용성을 실험을 통해 확인하였다.

  • PDF

전기지상지원장비 및 관제시스템 통합 개발을 위한 유럽 표준안 현황 (ECSS E70 Standard for developing common EGSE and MCS)

  • 허윤구;최종연
    • 항공우주산업기술동향
    • /
    • 제6권1호
    • /
    • pp.56-64
    • /
    • 2008
  • 위성체 총조립 및 시험(AIT; Assembly, Integration & Test)을 위한 전기지상지원장비(EGSE ; Electrical Ground Support Equipment)와 위성 임무 준비 및 운용을 위한 관제시스템(MCS; Mission Control System)은 동일한 시스템은 아니지만 많은 공통점과 호환 가능성을 갖고 있다. 하지만 우주 사업의 핵심 지상시스템인EGSE와 MCS는 사용 시기와 개발 조직이 달라서 오랫동안 별도로 개발 및 발전되어 왔다. 그러나 두 시스템이 기술적인 측면에서 유사한 기능과 역할을 하기 때문에 통합 또는 공통 개발에 대한 요구가 끊임없이 제기되고 있으며, 이미 세계적으로ECSS E70과 같은 관련 표준화 작업과 이를 바탕으로 실제 구현된 핵심 지상운영시스템의 개발이 최근에 기술적인 성숙을 이루고 있어 현재 거의 모든 우주 사업에서 핵심 지상운영시스템을 활용하거나 더 나아가 상용 제품을 적용하여 공통지상시스템을 개발하고 있다. EGSE와 MCS의 공통 기능에 관련된 표준화 작업은 ECSS를 통해 국제 표준(ISO, CCSDS 등)을 바탕으로 한 위성의 지상시스템에 대한 유럽 표준화 작업이 ECSS-E-70 Working Group에서 진행되고 있다. 여기서는 우주 산업에 관련된 표준화 단체인 ECSS에 대한 역사, 정책, 조직 및 문서 구조를 포함하여 ECSS에서 현재 진행되고 있는 지상시스템 및 운용 분야 관련 ECSS E70 표준화 작업의 내용 및 현황에 대해서 살펴보고자 한다.

  • PDF

예비전력 정예화 방안 (A scheme on strengthening of R.O.K reserved force)

  • 김재삼
    • 안보군사학연구
    • /
    • 통권5호
    • /
    • pp.1-45
    • /
    • 2007
  • Reserved forces of ROKA are in charge of replacement of TOE in the wartime and mission of rear area operation. But there is institutional inertia in the law and organization oriented to fill human resources rather than take mission. We need to prepare for the investment and arrangement of reserved forces as military power that would be replaced standing forces. In this portion, to reinforce reserve forces elite, First, efficient mobilization regulations and systems are suggested. I covered a maintenance of relevant mobilization ordinances which need to legislated and approved by national assembly for wartime and development of mobilization system which might lose the appropriate time for mobilization due to complicated declaration procedures and measures to overcome the panic at the initial stage of the war and organization and employment of nationwide transportation system and mobilization center. To ensure efficient resource management and mobilization of reserve forces with a number of approximately 3 million, there's a necessity of organization for integration and conciliation. To make it real, I suggested establishing and employing the mobilization center, on first phase, employ the mobilization center focusing on homeland divisions, on second phase, it is advisable to convert to national level mobilization system and develop to central mobilization center focusing on national emergency planning committee. During peacetime, in conjunction with Mobilization Cell, mobilization center can conduct resource survey and integrate and manage mobilization resources and take charge of mobilization training of subordinate units, and during wartime, in conjunction with mobilization coordination team and Cell, can ensure the execution of mobilization. Second, Future oriented reserve forces management system such as service system of reserve forces and support system of homeland defense operations. Current service and trainings of reserve forces by the year have very low connection, as it is very complex to manage the resources and trainings, and service and training lack the equity, re-establishment of service system is required. Also in an aspect of CSS and cultivation support for reserve forces, as the scope and limitation of responsibility between the armed forces and autonomous organization is obscure, conditions to conduct actual-fighting exercises are limited. Concentrated budgetting is extremely difficult because reserve forces training fields are scattered nationwide, and facilities and equipments are rapidly getting older. To improve all these, I suggest the organization of homeland defense battalion with a unit of "City-Gun-District" and supporting the local reserve forces. Conduct unit replacement or personal replacement for those who have finished their 1 or 2 years and homeland defense operation duty for those with 3-5 years for consistency and simplification. Third, I suggest Future oriented Reserved Training(FRT) and Training Center oriented training management to establish a reliable reserve training. Reserves carry out expansion of unit, conventional combat mission, homeland defense and logistics support during wartime, and actual-fighting exercise, and disaster relief, peace keeping activities. Despite diverse activities and roles, their training condition still stays definitely poor. For these reasons, Modernization of weapons and facilities through gradual replacement and procurement is essential to enhance mobilization support system.

  • PDF

국내건설기업의 해외 프로젝트 입찰단계 우선집중역량 분석 (An Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies)

  • 김지형;김예상
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.23-30
    • /
    • 2014
  • 국내건설기업의 해외건설수주액은 2005년 109억 달러에서 2012년 649억 달러로 단기간에 큰 폭으로 상승하였다. 하지만 양적인 성장에 비해 질적인 뒷받침이 따라가지 못하고 있다는 우려가 크다. 본 연구는 국내건설기업이 해외 진출 시 프로젝트 수주 뿐 만이 아니라 성공적인 프로젝트의 실행을 위해 우선적으로 확보해야 할 역량을 도출하였다. 단계별 역량 평가를 위해 사전 영업 단계, 입찰 준비 단계, 본 입찰 단계, 계약 단계의 4단계로 입찰 단계를 정의하였다. 실무자 면담을 통해 단계별 세부 업무를 도출한 뒤, 국내건설기업의 해외 입찰 담당자 및 해외 현장 투입 인원을 대상으로 세부 업무별 중요성 및 현재 보유 역량에 대해 Likert 7점 척도를 활용한 설문을 실시하였다. 설문값의 IPA 분석 결과, 국내건설기업이 우선적으로 확보해야 할 역량은 내부적 역량으로 철저한 리스크 검토, 합리적인 입찰팀 구성, 현실적인 가실행예산 산정, 외부적 역량으로 발주처 니즈 파악, 현지화 전략, 협력 체계 구축으로 분석되었다. 본 연구에서 도출된 결과를 활용하여 향후 국내건설기업이 프로젝트의 수주 뿐 만이 아니라 실행 단계에서의 수익률 향상을 위한 입찰 전략의 방향을 설정하는데 활용할 수 있을 것으로 기대된다.

문화영향평가제도의 현실적 적용을 위한 개선방안 연구 (A Study on the Improvement for Practical Application of Cultural Impact Assessment System)

  • 고정민;박지혜
    • 문화경제연구
    • /
    • 제20권1호
    • /
    • pp.51-80
    • /
    • 2017
  • 본 연구는 2016년 문화영향평가 시행과정에서 나타난 다양한 이슈와 문제점을 분석하고 평가 단계별 개선점을 도출하는 것이다. 분석결과 문화영향평가제도를 시행함에 있어서 평가지표가 일반 사람들이 이해하기 어려운 점, 사전평가는 미비한 사업계획서와 판단할 수 있는 근거자료가 부족하다는 점, 다양한 방법론 보다는 설문조사를 중심으로 평가를 진행한 사례가 많다는 점, 평가척도와 가중치 적용의 문제점, 평가결과의 활용보다는 평가 그 자체에 다소 치중되어 있다는 점 등이 지적되었다. 이에 대한 개선방안으로는, 먼저 평가기획단계에서는 사업시행 전, 사업진행, 사업완료 시점에 따라 평가결과를 비교하여 결과를 도출하는 방식을 도입하고, 또한 평가대상 정책 사업의 담당자와 평가기관이 공동으로 평가지표를 개발하며, 시스템다이내믹스와 같은 인과적 추론을 위한 지표개발이 필요할 것으로 보았다. 평가추진단계에서는 주민참여 다각화, 풍부한 사례조사, 계량적 방법론의 적용 등 복합적 방법론을 도입하고, 기술과 지식이 풍부한 전문가 평가단을 좀 더 운영하고 활용할 필요가 있다는 것을 제안하였다. 평가활용단계에서는 인과관계를 파악할 수 있는 방법론을 활용함으로써 활용성을 제고시키면서, 평가결과를 기반으로 하여 철저하게 컨설팅을 제공할 필요가 있다는 점이다.

쉴드TBM 터널 시공 사례 : 인천도시철도1호선 검단연장선 1공구 (Case Study of Shield Tunnel Construction : Incheon Metro Line 1 Geomdan Extension Phase 1 Project)

  • 박병관;주채만;허도학;송현섭;주광수;김도훈;이민상
    • 터널과지하공간
    • /
    • 제34권3호
    • /
    • pp.185-195
    • /
    • 2024
  • 인천도시철도 1호선 검단연장선 1공구 건설공사는 국내 최초로 로드헤더와 TBM 장비가 함께 적용되었다. 쉴드TBM 터널 구간은 1,057 m이며, 대부분 암반으로 구성 되어있으며 공항철도 및 경인아라뱃길 하부 터널 구간 공사를 포함하고 있다. 굴진을 위해 7.8 m 토압식 쉴드TBM 장비가 투입되었으며, 상·하선 구간의 평균 월굴진율은 239.1 m이고, 최대 월굴진율은 334.5 m이다. 본 기술기사에서는 인천도시철도 1호선 검단연장선 1공구 쉴드TBM 터널 굴진 실적을 중심으로 쉴드TBM의 생산성을 종합적으로 평가해 보았으며, 성공적인 쉴드TBM 터널 공사 수행에 있어서 유용한 자료를 제공하고자 한다.

웹/모바일-어플리케이션 접속 지표와 TCS 교통량의 상관관계 연구 (Exploring the Temporal Relationship Between Traffic Information Web/Mobile Application Access and Actual Traffic Volume on Expressways)

  • 류인곤;이재영;최기주;김정화;안순욱
    • 대한교통학회지
    • /
    • 제34권1호
    • /
    • pp.1-14
    • /
    • 2016
  • 최근 스마트폰의 빠른 보급으로 누구나 언제 어디서든 자유로운 네트워크 접속이 가능해졌다. 이는 통행 전은 물론 통행 중 교통정보 검색이 매우 편리해졌음을 의미한다. 고속도로 교통정보 탐색 행태의 기반이 되는 상관성 분석을 위하여, 웹과 모바일-앱의 접속 지표에 대한 정상성 여부를 검증하고, TCS 교통량과의 상관관계를 실증적으로 분석하는 것이 본 연구의 목적이다. 그 결과 첫째, 시간대별 웹/모바일-앱의 접속 지표에 대한 ADF-검정, PP-검정 결과, 로그변환이나 차분변환 없이도 시계열의 정상성 조건을 만족하는 것으로 나타났다. 둘째, 고속도로 진출입 교통량과의 피어슨 상관계수를 검토한 결과, 웹/모바일-앱의 모든 접속 지표는 뚜렷한 양적 상관관계를 보였다. 단, 트럭의 TCS 진입 교통량은 상관관계가 거의 없는 것으로 나타났다. 셋째, 시계열 변수 사이에 존재하는 발생시간의 시차 관계(동행성, 선행성, 후행성)를 규명하기 위해 교차분석을 수행한 결과, 모바일 이용자는 모든 웹 접속 지표보다 선행하고 있었으며, 모바일 실행횟수는 모든 웹 접속 지표와 동행함을 발견하였다. 넷째, 고속도로의 진입 교통량에 선행하는 웹/모바일-앱 접속 지표는 존재하지 않았으며, 웹 페이지뷰/방문자/신규방문자/재방문자, 모바일 실행횟수는 오히려 고속도로 진입 총 교통량과 비교시 1시간의 후행 시차에서 상관관계가 가장 높게 나타났다. 향후 분석의 공간적 범위와 시간적 범위를 세분화하고 교통정보 이용자의 위치정보를 활용할 수 있다면, 경로 전환 시점/비율과 같은 개별 통행행태까지도 예측할 수 있게 될 것으로 판단된다.