1. NATM design changed into open type excavation on the 8 meter overburden of subway construction. (지하철 선로부 토피 8m의 경우 NATM공법설계를 개착공법으로 대체한 실례)

  • Huh Ginn
    • Explosives and Blasting
    • /
    • v.10 no.2
    • /
    • pp.3-7
    • /
    • 1992
  • Concerning to Taeku city subway construction project(1-4 site), the original design was adapted NATM Tunnel method to the 8 meter thickness of overburden. Surveyor checked sity and design material and finally decided to change into Open Cut method because overburden is not only below 1 1/2 times thickness of comparate Tunnel width but there is no traffic conjunction in job site.

  • PDF

Analysis of Tunnel Behavior Using Progressive Rockmass Failure Technique (암반의 진행성 파괴 기법을 이용한 터널거동 분석)

  • 이성민;이윤규;신성렬
    • Tunnel and Underground Space
    • /
    • v.9 no.4
    • /
    • pp.288-295
    • /
    • 1999
  • Concentrated stresses due to the underground tunnel excavation easily cause many problems such as yielding, popping, and failure at the immediate roof, wall and floor of tunnel. Therefore, it is very important to predict the possibility of these problems when a tunnel is excavated underground. There are two typical methods to predict these problems. The one is to predict problems from the analysis of field monitoring data and the other is to predict them from computer simulations using good site investment data. Using the second method, this study attempted to describe the time-dependent or progressive manner of immediate roof and wall due to the underground tunnel excavation. An iterative technique was used to represent progressive failure of rockmass with the Hoek and Brown theory. By developing and simulating three different shapes of twin tunnels, this research estimated the proper size of critical pillar width between tunnels, distributed stresses on the tunnel walls, and convergences of tunnel crowns. Moreover, results out of progressive failure technique based on the Hoek and Brown theory were compared with the results out of Mohr-Coulomb theory.

  • PDF

Restoration Study of Woljeong-gyo (월정교의 복원적 고찰)

  • Nam, Si-Jin
    • Journal of architectural history
    • /
    • v.16 no.4
    • /
    • pp.77-93
    • /
    • 2007
  • According to documentary records Woljeong-gyo(stone bridge) is built in 760(Silla the 35th King Gyeongdeok 19) and used as original function until 1280(Goryeo the 25th King Chungryeol 6) as Chunyang-gyo. But in those days "Donggyeongjapgi" was published in 1669(Joseon Hyeonjong 10) we assume that it was lost its original function. There are four pier in the type of a ship with the same distance in the middle of river. We can see it is the site of bridge as parts of stonework of bridge are remained. In 1975 the abutments and piers are surveyed and in 1984 stone investigation twice and excavation three times which were to plan restoration were done. Now the restoration of abutments both ends are worked. For restoration of Woljeong-gyo studied documentary records and excavation recoeds were collected and examined. It helped to see the bridge in southern China twice to restore the bridge. Unearthed articles such as yeonham(a kind of member to support roof tiles) and giwa(roof tile) gave decisive clues to assume upper structure of the bridge and from Chinese bridges are helped to type of the bridge. It is certain Woljeong-gyo was ranggyo which means that upper structure was made with wooden members and the stone piers shaped of a ship below and near the abutments both ends another buildings were. Youngjocheok(the architectural measure) of this bridge is similar to gokcheok(the metal measure, 301.84mm) used now that the length of piers is 46choek(尺), the width of that is 9choek(尺), the length between two piers is 42choek(尺), the length between abutment and pier is 38choek(尺). Also we can see that entirely the length of the bridge is 210choek(尺), width is 40choek(尺).

  • PDF

Reduction of Differential Settlements due to Deep Excavation Using the Micro-piling Method (마이크로 파일을 이용한 가설 벽체 인접 구조물의 침하 억제에 관한 연구)

  • Huh, In-Goo;Hwang, Tae-Hyun;Lee, Sang-Ryeong;Shin, Jong-Ho;Kwon, Oh-Yeob
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.10
    • /
    • pp.71-81
    • /
    • 2008
  • Wall displacements caused by earth pressure, rainfalls, rise in ground water level, inappropriate deep excavation and structural defects of the wall may produce differential settlements to existing buildings, which often result in damages and/or collapses of the building structures. In this case, measures to protect the walls and nearby structures would be required. One of the recent measures to reduce differential settlements and protecting walls is to reinforce the ground using micro-piles. In this study physical model tests were carried out to evaluate the performance of the micro-pile method. It is revealed that reduction of the settlement was maximized when the length of micro-pile is twice of the foundation width, distance between piles is twice of the pile diameter and the distance to wall is one tenth of the foundation width. Based on the test results some design recommendations were made.

A Study on the Determination of Design Load for Buried Hume Pipeline (매설흄관의 설계하중 결정에 관한 연구)

  • O, Chi-Nam;Jeong, Seong-Gyo;Jang, Gi-Tae
    • Geotechnical Engineering
    • /
    • v.5 no.2
    • /
    • pp.19-32
    • /
    • 1989
  • The vertical loads of buried Hume pipes were calculated using the finite element method, in which the hyperbolic soil model, the nonlinear hysteretic stress path model and soil-structure interface model were used. The obtained results were compared and discussed with those from the classic methods such as Marston-Spangler's theory and so on. The effects of excavation width and depth to the top of pipe along with soil parameters and type of excavation, which have not been included in the classic methods, were investigated. In addition, a calculation method of the vertical load for buried Hume pipes was proposed and it is presumed to be easily applied in the practical fields.

  • PDF

A Study on Tunnel Excavation by Controlled Blast Vibration at Particular Environment Conditions (발파진동 제어에 의한 특수구간 터널굴착에 관한 연구)

  • Choi, Hyung-Bin;Lim, Han-Uk
    • Journal of Industrial Technology
    • /
    • v.20 no.A
    • /
    • pp.257-267
    • /
    • 2000
  • It was difficult to apply conventional excavation methods in some sections from Seoul to Pusan high speed rail road construction of 1 lot 2, due to highway concrete road, gas pipe, water pipe and nearby factories with automatic control system machine. To excavate safely and efficiently in these sections new blast patterns were employed within allowable blast vibration level, by test blast and controlled vibration by sequential blast. Behaviors of the rock mass including convergence and displacement around tunnel were measured with construction works and the crack width in concrete wall was also monitored for controlling allowable limits. The results can be summarized as follow : 1. The allowable blast vibration level in structure site is less 1.0cm/sec for highway concrete, 0.5 cm/sec for gas pipe, water pipe and building housing and 0.3 cm/sec for automatic control system machine. 2. The convergence displacement, single rod extensometer and multi rod extensometer around tunnel and cracks in concrete wall were measured, it was confirmed that the measured values were converged within allowable level. 3. The empirical formular of ground vibrations with 90% confidence lines for PD-3 was given as follow. $$V_{90%}=45.549({\frac{D}{\sqrt{W}}})^{-1.353}$$

  • PDF

Stability Estimation Method for Pillar Considering the Reinforcement Method during Twin-Tunnel Excavation (병설터널 굴착시 필라부의 보강을 고려한 안정성 평가기법)

  • Jang, Bu-Sik;Hwang, Jung-Soon;Ryu, June-Won;Lee, Eung-Ki;Kim, Hong-Taek
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.980-987
    • /
    • 2006
  • Recently, twin-tunnel is often designed considering the aspects of disaster prevention and economic reasons. However, the design cases and the studies are relatively insufficient. By the twin-tunnel excavation, deviate stresses of pillar between tunnels are increased and the increased stresses induce the instability of the twin-tunnel. In this study, numerical analyses about the twin-tunnel behaviour are conducted while varying ground strength, width of pillar and depth of earth cover and a series of regression analyses are carried out by using the results of numerical analyses for the twin-tunnel. Based on the numerical analyses, an estimation method of derived stresses is suggested though the regression analyses. Also, based on the results of regression analyses, an quantitative estimation method considering the reinforcement effects is also suggested. Then various parametric studies are conducted to be considered the reinforcement type and various design parameters. Finally, the efficiency of the suggested method is verified through the results of parametric studies.

  • PDF

Behavior of the tunnel under the influence of a existing building during the adjacent ground excavation (근접굴착 시 기존건물의 영향을 받는 터널의 거동)

  • Lee, Jong-Min
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.609-623
    • /
    • 2018
  • If the ground is excavated in a depth which is deeper than the adjacent existing tunnel, the behavior of the braced wall is known to be greatly affected by the presence of the tunnel. By the way it is expected to be also affected by the structure on the ground surface, There are not many examples of studies which are conducted on this subject. As a result, largel scale model tests and analysis were conducted, to measure the behavior of the tunnel under the building whose location on the ground surface was varied during the adjacent ground excavation. For this purpose, the location of a building load was varied in 0 m, 1D, 2D on ground surface. In this paper, the behaviors of braced wall and adjacent tunnel was studied. Model tests in 1 : 10 scale were performed in real construction sequences. The size of test pit was $2.0m(width){\times}6.0m(height){\times}4.0m(length)$ in dimension. As a result, it was found that the stability of the existing tunnel under the influence of the building load on the ground surface adjacent to the braced wall.

Sensitivity analysis of tunnel stability with a consideration of an excavation damaged zone (암반손상대를 고려한 터널 안정성 민감도 분석)

  • Kim, Jin-Soo;Kwon, Sanki
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.1
    • /
    • pp.91-104
    • /
    • 2014
  • An Excavation Damaged Zone (EDZ), in which rock properties are permanently changed due to blasting impact or stress redistribution, can influence the behavior and stability of structures. In this study, the mechanical stability of an underground opening was simulated by using FLAC, which is a two-dimensional modeling code, with a consideration of EDZ. A sensitivity analysis was also carried out with fractional factorial design. From the modeling, it was found that the behavior and the stability of an underground tunnel are strongly dependent on the existence of the EDZ. The sensitivity analysis showed that the key parameters affecting the factor of safety around the tunnel are in-situ stress ratio, depth, cohesion, reduction ratio, internal friction angle, and height and width of the tunnel. It is necessary to consider the EDZ, which can significantly affect mechanical stability in tunnel design.

A Terrain Surface Approximation Using the Hermite Function (Hermite함수를 이용한 지형곡면근사)

  • 문두열;정범석;이용희
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.20 no.3
    • /
    • pp.265-272
    • /
    • 2002
  • By this time, many methods have been developed for computing the pit excavation volumes, ranging from a simple formula to more complicated numerical methods. Earlier the standard methods for pit excavation volume computation requires that the considered area be divided the boundary ranges of x and y directions into a rectangular grid. whereas these methods may not calculate the estimation of pit excavation volume that is often required in many surveying situation exactly. In Easa methods(1998), the rectangular grid is divided into the same linear in the range x and y directions respectively. This method employs a cubic Hermite polynomial for individual intervals in both directions of the grid. Because the height data over the same boundary of x and y interval ranges have to be exist, it is not possible to choose the governing points of the terrain boundary such as points of maximum and minimum height. In this study, a method of volume computation, that combines the advantages of Easa methods(1998) and avoids the drawbacks of it, is presented. The proposed method employs a cubic Hermite polynomial for individual intervals in both directions of the non-grid, the all over intervals of it may be unequal grid x in width and y in length y, partially. The new proposed method should produce better accuracy than the other conventional methods.