• Title/Summary/Keyword: Excavation condition

Search Result 345, Processing Time 0.025 seconds

Conservation of Golden Decorative(Jikgeumdan) Jeogori and Chima of Costumes Excavated from Hangju Gi' Tomb of Angang, Kyungsangbukdo Province - Re-adhesion of Gold Leaves in Gilt Paper Strips - (경상북도 안강 행주 기씨 묘 출토 직금단 치마와 저고리 보존처리 - 직금단 편금사의 금박 재접착을 중심으로 -)

  • Oh, Joon-Suk;Noh, Soo-Jung
    • Journal of the Korean Society of Costume
    • /
    • v.57 no.9
    • /
    • pp.67-75
    • /
    • 2007
  • The purpose of this research is to conserve of golden decoration(Jikgeumdan) of Chima(skirt) and Jeogori(Korean jacket) of the costumes excavated from Hangju Gi' tomb(17th Century) of Joseon dynasty$(1392{\sim}1910)$ and to focus on the development of conservation skill to prevent flakings of gold leaves in gilt paper strips. Up to the present, in case of golden decorations of costumes excavated from tombs of Joseon dynasty, some of gold leaves in gilt paper strips of costumes were flaked away by deterioration of adhesives in tombs. However, most of gold leaves were flaked away and totally lost by wet cleaning for eliminating contaminants after excavation. In order to prevent flaking, preliminary experiments for re-adhesion of gold leaves have been carried out. Firstly, simulation was performed using gold leaf which was available in the market. Adhesives used in this research were water-soluble adhesives(hide glue(cow, rabbit), glue made from air bladders of sciaenoid fish and Primal AC-3444 of acrylic emulsion) and solvent-soluble adhesives(acrylic adhesive Paraloid B-67 and B-72). Because of difficulty in wetting and spreading of adhesive solutions into the interface between gold leaf and Korean paper, water-soluble adhesives were not proper for adhesion of gold leaf and Korean paper. Solvent-soluble adhesives were easily infiltrated into interface between gold leaf and Korean paper and the adhesive force was also satisfied. From this result, the researchers chose more flexible Paraloid B-72$(Tg\;40^{\circ}C)$ 1% solution than Paraloid B-67$(Tg\;50^{\circ}C)$ for adhesion of gold leaf and Korean paper. Secondly, using Paraloid B-72 1% solution, the estimations of re-adhesions of gold leaves in gilt paper strips of Jeogori were carried out. When Paraloid B-72 1% solution was injected three times into the interface between gold leaf and Korean paper, the re-adhesion was most effective. On the basis of the results in these preliminary experiments, re-adhesions of gold leaves in gilt paper strips of Chima and Jeogori were carried out on condition of three times injections of Paraloid B-72 1% solution before wet cleaning. After wet cleaning, the most of the gold leaves were survived, which was confirmed by both the examination with the naked eye and the microscopic examination.

Refurbishment of a 3.6 m earth-pressure balanced shield TBM with a domestic cutterhead and its field verification (국산 커터헤드를 장착한 직경 3.6 m 토압식 쉴드TBM의 제작과 현장적용성 분석)

  • Bae, Gyu-Jin;Chang, Soo-Ho;Choi, Soon-Wook;Kang, Tae Ho;Kwon, Jun-Yong;Shin, Min-Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.4
    • /
    • pp.457-471
    • /
    • 2015
  • A domestic cutterhead with the diameter of 3.6 m was designed and manufactured in this study. Then, it was attached to an existing earth-pressure balanced shield TBM to excavate a cable tunnel with the length of 1,275 m. Especially, the procedures for TBM cutterhead design and its corresponding performance prediction were also summarized. From field data analyses of the refurbished shield TBM, its maximum advance rate was recorded as 14.4 m/day. Penetration depths of disc cutters were found to be approximately 4 mm/rev, which is equal to the maximum penetration depth designed for the strongest rock strength condition in the target tunnel. Every TBM operating thrust and cutter normal force during TBM driving was much smaller than their corresponding maximum capacities. When cutter acting forces recorded in the field were analyzed, their prediction errors by the CSM model were very high for weak rock conditions. In addition, rock strength showed very close relationships with cutter normal force and penetration depth.

Evaluation methods of shotcrete lining stresses considering steel rib capacities by two-dimensional numerical analysis (이차원 수치해석에 의한 강지보 성능을 고려한 숏크리트 라이닝의 부재력 평가 방법)

  • Ha, Tae-Wook;Kim, Dae-Young;Shin, Young-Wan;Yang, Hyung-Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.3
    • /
    • pp.269-282
    • /
    • 2008
  • In general, the effects of steel ribs are not considered in the numerical analysis of tunnel design. However, attempts have been increased recently to consider these effects in the analysis of shallow tunnels in soft ground, based on the fact that the steel ribs embedded in the shotcrete take a role to support some portion of the redistributed load due to excavation. In such analyses, the steel ribs can be considered in four different methods: (1) a conventional method where the steel ribs are not considered, (2) a method using the equivalent composite cross section in which the bending moment of shotcrete is not considered, (3) a method using the equivalent composite cross section in which both the compressive stress and the bending moment for the shotcrete and steel rib are considered, and (4) a method using beam elements for the shotcrete and the steel rib, respectively. These methods are adopted in the numerical analysis using FLAC 2D to investigate stresses of both the shotcrete and the steel rib. The overall results show that the analyses are more practical and economical when the effects of steel rib are considered fer the methods (2), (3), and (4). Since the results of those analyses considering steel rib capacity may be different according to the ground condition, it will be necessary to consider the appropriate method among them in accordance with design conditions.

  • PDF

A Study on the Stress Induced Brittle Failure around Openings with Cross-sectional Shape by Scaled Model Test and DEM Simulation (모형시험과 개별요소법을 이용한 단면 형상에 따른 공동 주변 취성파괴에 관한 연구)

  • Bae, Seong-Ho;Jeon, Seok-Won;Park, Eui-Seob
    • Tunnel and Underground Space
    • /
    • v.17 no.5
    • /
    • pp.389-410
    • /
    • 2007
  • For moderately jointed to massive rock masses, the failure and deformation behaviors around an excavated opening are absolutely influenced by the initial rock stress and strength of in-situ rock mass. The localized and progressive brittle failure around an opening does not mean whole collapse of an excavated opening. But, for many cases, it may induce temporary stopping of excavation works and reexamination of the current supporting system, which can result in delay of the entire construction works and additional construction cost. In this paper, the characteristics of the brittle failure around an opening with stress level and tunnel shape was studied by the biaxial compressive test using scaled specimen and by the numerical simulation with $PFC^{2D}$. The biaxial test results were well coincided with the stress induced failure patterns around the excavated openings observed and monitored in the in-situ condition. For the circular part of the opening wall, the stress induced cracks initially occurred at the wall surface in the direction of the minimum principal stress and contributed to the localized notch shaped failure region having a certain range of angle. But for the corner and straight part of the opening wall, the cracks initiated at sharp corners were connected and coalesced each other and with existing micro cracks. Further they resulted in a big notch shaped failure region connecting two sharp corners.

Numerical Analysis of EPB TBM Driving using Coupled DEM-FDM Part II : Parametric Study (개별요소법과 유한차분법 연계 해석을 이용한 EPB TBM 굴진해석 Part II: 매개변수 해석)

  • Choi, Soon-wook;Lee, Hyobum;Choi, Hangseok;Chang, Soo-Ho;Kang, Tae-Ho;Lee, Chulho
    • Tunnel and Underground Space
    • /
    • v.30 no.5
    • /
    • pp.496-507
    • /
    • 2020
  • A prediction of the performance of EPB TBM is significant for improving the constructability of tunnels. Thus, various attempts to simulate TBM excavation by the numerical method have been made until these days. In this paper, to evaluate the performance of TBM with different operating conditions, a parametric study was carried out using coupled discrete element method (DEM) and finite difference method (FDM) EPB TBM driving model. The analysis was conducted by changing the penetration rate (0.5 and 1.0 mm/sec) and the rotational speed of screw conveyor (5, 15, and 25 rpm) while the rotation velocity of the cutter head kept constant at 2 rpm. The torque, thrust force, chamber pressure, and discharging with different TBM operating conditions were compared. The result of parametric study shows that the optimum driving condition can be determined by the coupled DEM-FDM numerical model.

TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application (막장전방 예측기법에 근거한 TBM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Park, Jeongjun;Lee, Kang-Hyun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • When utilizing a Tunnel Boring Machine (TBM) for tunnelling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These include fractured zones or mixed ground conditions that are likely to reduce the stability of TBM excavation, and result in considerable economic losses such as construction delays or increases in costs. Minimizing these potential risks during tunnel construction is therefore a crucial issue in any mechanized tunneling project. This paper proposed the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are then evaluated based on their occurrence probability and impact. A TBM risk management system that can suggest proper solution methods (measures) for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method (optimal measure) to handle risk events. Lastly, an actual construction site, at which there was a risk event during Earth Pressure-Balance (EPB) Shield TBM construction, is analyzed to verify the efficacy of the proposed system.

Development of a Fleet Management System for Cooperation Among Construction Equipment (건설장비 협업을 위한 플릿관리 시스템 개발)

  • Ahn, Seo-Hyun;Kim, Sung-Keun;Lee, Kwan-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.573-586
    • /
    • 2016
  • In construction jobs, a combination of various kinds of machinery is used to perform earthworks at a large-scale site. Individual equipments essentially cooperate with each other on task such as excavation, load, transfer and compaction. While other area have studied cooperation system, related study in domestic construction is in poor condition. In this study, construction equipment fleet management system is developed for solving this problem and find way to improving efficiency in earthworks site. The entire concept of the fleet management system, including its components and process, has been systematically outlined in this paper. An operational methodology has also been suggested, where a number of machines, such as the excavators, trucks and compactors, are chosen and further grouped into a cluster. A case study verify fleet management system's effectiveness on performing task package by comparing existing work method with methodology in this study. Fleet management system in this study is expected to curtail fuel consumption by the reduction of working time and moving distance. Furthermore, it can be anticipated to declining carbon emission effect.

A Case Study on Elephant Foot Method for Railway Tunneling in Large Fault Zone (대규모 단층대구간에서의 철도터널 우각부 보강공법 적용성 연구)

  • Lee, Gilyong;Oh, Jeongho;Cho, Kyehwan;Lee, Doosoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1161-1167
    • /
    • 2016
  • In this study, an attempt was made to conduct a case study on the development of ground expansive displacement due to lack of bearing capacity of original ground in spite of applying reinforcement treatments that intended to enhance the stability of big size high-speed rail tunnel in large fault zone. For the purpose of this, in-situ measurements made in the middle of excavation stage were analyzed in order to characterize ground responses and numerical analysis was performed to evaluate the effectiveness of reinforcement technique such as elephant foot method applied for this site via comparing with field monitoring measurements. In addition, further numerical studies were carried out to investigate the influence of leg pile installation angle and length, which is one of types of elephant foot method. The results revealed that the optimum condition for the leg pile installation is to maintain 45 degree of installation angle along with 6 meter of embedment depth.

Numerical analysis of pre-reinforced zones in tunnel considering the time-dependent grouting performance (터널 사전보강영역의 경시효과를 고려한 수치해석 기법에 관한 연구)

  • Song, Ki-Il;Kim, Joo-Won;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.2
    • /
    • pp.109-120
    • /
    • 2007
  • Auxiliary support systems such as the reinforced protective umbrella method have been applied before tunnel excavation to increase ground stiffness and to prevent the large deformation. However, determination procedure of geotechnical parameters along the construction sequence contains various errors. This study suggests a method to characterize the time-dependent behavior of pre-reinforced zones around the tunnel using elastic waves. Experimental results show that shear strength as well as elastic wave velocities increase with the curing time. Shear strength and strength parameters can be uniquely correlated to elastic wave velocities. Obtained results from the laboratory tests are applied to numerical simulation of tunnel considering its construction sequences. Based on numerical analysis, initial installation part of pre-reinforcement and portal of tunnel are critical for tunnel stability. Result of the time-dependent condition is similar to the results of for $1{\sim}2$ days of the constant time conditions. Finally, suggested simple analysis method combining experimental and numerical procedure which considering time-dependent behavior of pre-reinforced zone on tunnel would provide reliable and reasonable design and analysis for tunnel.

  • PDF

Characteristics of the Earth Pressure Magnitude and Distribution in Jointed Rockmass (절리가 형성된 암반지층에서 발생된 토압의 크기 및 분포특성)

  • Son, Moorak;Yoon, Cheolwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6C
    • /
    • pp.203-212
    • /
    • 2011
  • This paper investigates the caharactheristics of the earth pressure magnigue and distribution in jointed rockmass for a safe and economic design and construction of earth retaining structures installed in rock stratum. For this purpose, this study will first investigate the limitations and problems of the existing earth pressure studies and then to overcome them th study will conduct the discontinuum numerical parametric studies based on the Discrete Element Method (DEM), which can consider the joint characteristics in rock stratum. The controlled parameters include rock type and joint conditions (joint shear strength and joint angle), and the magnitude and distribution characteristics of earth pressure have been investigated considering the interactions between the ground and the retaining structures. In addition, the comparison between the earth pressures induced in rock stratum and Peck's earth pressure for soil ground has been carried out. From the comparison, it is found that the earth pressure magnitude and distribution in jointed rockmass has been highly affected by rock type and joint condition and has shown different characteristics compared with the Peck's empirical earth pressure. This result would hereafter be utilized as an important information and a useful data for the assessment of earth pressure for designing a retaining structures installed in jointed rockmass.