• Title/Summary/Keyword: Excavation Works

Search Result 128, Processing Time 0.024 seconds

A Study on Machine Learning-Based Real-Time Automated Measurement Data Analysis Techniques (머신러닝 기반의 실시간 자동화계측 데이터 분석 기법 연구)

  • Jung-Youl Choi;Jae-Min Han;Dae-Hui Ahn;Jee-Seung Chung;Jung-Ho Kim;Sung-Jin Lee
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.1
    • /
    • pp.685-690
    • /
    • 2023
  • It was analyzed that the volume of deep excavation works adjacent to existing underground structures is increasing according to the population growth and density of cities. Currently, many underground structures and tracks are damaged by external factors, and the cause is analyzed based on the measurement results in the tunnel, and measurements are being made for post-processing, not for prevention. The purpose of this study is to analyze the effect on the deformation of the structure due to the excavation work adjacent to the urban railway track in use. In addition, the safety of structures is evaluated through machine learning techniques for displacement of structures before damage and destruction of underground structures and tracks due to external factors. As a result of the analysis, it was analyzed that the model suitable for predicting the structure management standard value time in the analyzed dataset was a polynomial regression machine. Since it may be limited to the data applied in this study, future research is needed to increase the diversity of structural conditions and the amount of data.

Risk Assesment of Subsidence which utilized Fuzzy-FMEA (Fuzzy-FMEA를 활용한 지반함몰 위험도 평가)

  • Deacheon Kim;YoungMin Jung;Dongil Shin
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.2
    • /
    • pp.313-325
    • /
    • 2023
  • Purpose: According to the recent occurrence statistics of ground accidents, ground subsidence and subsidence have become social problems as the frequency has increased centering around the downtown areas. This study tried to clarify risk of detailed factors which have an effect on subsidence. Method: For the study, detailed risk factors of 28 foundations were mainly drawn through the materials, precedent studies, and research reports shown by analyzing JIS' accident cases from 2016 to September 6, 2022 and by taking advice from an excavation expert. And risk was assessed by conducting a survey on 12 subsidence experts from the universities, research institutes, and industries and applying Fuzzy-FMEA to it. Result: It has found that damage of sewer pipes is 24.99% of overall risk, followed by excavation work (17.34%), water pipes (14.84%), and poor compaction (refill) (13.93%). And it has found that risk of damaging utilities (water pipes, sewer pipes, and other utilities) is highest, followed by poor construction works (excavation work, damage of sewer and water pipes, and other utility work) and poor compaction (refill). Conclusion: This shows that risk of subsidence factors judged by experts is similar with JIS' cases of ground subsidence.

The Behavior of a Cut Slope Stabilized by Use of Piles (억지말뚝으로 보강된 절개사면의 거동)

  • Hong, Won-Pyo;Han, Jung-Geun;Lee, Mun-Gu
    • Geotechnical Engineering
    • /
    • v.11 no.4
    • /
    • pp.111-124
    • /
    • 1995
  • On development of mountaneous or hilly area, stability of cut slope should be provided to prevent undesirable landslides. When piles are used as a countermeasure to stabilize existing landslide, stabilities for both piles and slope should be simultaneously satisfied to obtain the whole stability of the slope reinforced by piles. In order to confirm the effect of stabilizing piles on slope stabilization, it is necessary to investigate the behavior of the slope, in which the piles are installed. In this paper, first, the countermeasures used commonly to control unstable slope in Korea were summerized systematically. Nezt, the behavior of piles and slope soil was investigated by instrumentation installed into a cut slope for an apartment stabilized by a row of piles. Instrumentation could present sufficient effect of piles on slope stabilization Construction works in front of the row of piles affected the displacement of piles and slope. The construction works were divided into four stages, i.e. initial cutting stage of slope, excavation stages for retaining wall and parking space, and construction of retaining wall. As the result of research, the applicability of the proposed design method could be confirmed sufficiently.

  • PDF

A study of tunnel face reinforcement (터널 막장보강효과에 대한 연구)

  • Peila, Daniele;Oreste, Pier Paolo;Pelizza, Sebastiano;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.3
    • /
    • pp.259-267
    • /
    • 2004
  • The practice of introducing and grouting reinforced fiber glass pipes or bar into the core to be excavated to maintain stable the tunnel face during excavation has been applied to many tunnels, where difficult geotechnical conditions are present, with good results in terms of safety and speed of works. This reinforcing technique, initially developed to be used jointly with the mechanical precut in clay, has been widely used with other geotechnical conditions as the only type of reinforcement or joined with other ground consolidation and/or reinforcement techniques (i.e. steel pipes or jet-grouting umbrella). At present same numerical researches have been carried out to find which are the real working conditions of the reinforcing elements but no final results have been obtained for the definition of the best design approaches. In this work the results of a three dimensional parametric numerical model is presented.

  • PDF

Travel of the Park G$\ddot{u}$ell in Spain Barcelona which were designed and made a construction by Antoni Gaudi, as a genius artist, and review the works of residential development-Park G$\ddot{u}$ell, and also bridge made by stone bricks in the compound (기행문 - 스페인에서 본 천재 예술가(藝術家) 가우디(Antoni Gaudi)가 설계.시공한 구엘공원(Park G$\ddot{u}$ell) 주거단지와 경내(境內)에 건설한 석조교량(石造橋梁)에 대한 소고(小考))

  • Jo, Gyu-Yeong
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.55
    • /
    • pp.37-51
    • /
    • 2012
  • There is a shround of mystery surronnding Gaudi. In all probability, the first mist preventing us from gaining acess to his work is the intrinstic mysteriousness of all genius and, at the end of the day, of all human spirit. The situation is complicated by the well-known fact that Gaudi wished to creat an aura of silence around his persona, while, at the same time as maintaining this secretiveneness - in other words, the annihiliation of his fundamental values-gave expression and symbolisation to his moods and incerdible mental power. On a piece of land on the Muntanya Pelada, in the Barcelona district of La Salut, Eusebi G$\ddot{u}$ell Wanted to build an urbanisation inspired by the concepe of the garden city. in this he sought to return to nature, health and an escape from the insalubrous industrial city. Gaudi worked on the construction of this park between 1900 and 1914, and even moved his home there in 1906. An outstanding feature of park G$\ddot{u}$ell is the integration of architecture with nature. In other to save the natural slopes, Gaudi built viaducts from brick pillars, which he covered with stone obtained from the excavation.

  • PDF

Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit (철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구)

  • Hwang, Young-Ho;Shon, Jung-Chul;Baek, Jong-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF

Leveraging the Smart device for waterworks manhole management (상수도맨홀 관리를 위한 스마트 관리장치의 활용)

  • Chun, Haebok;Kim, Yeongkwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.2
    • /
    • pp.141-148
    • /
    • 2017
  • The waterworks company is in charge of managing water facilities buried underground, and the management has been centered on manholes. However, since there is no standard management manual, it has been impossible to introduce and operate a systemized managing tool by water service providers and managers, and manhole management has been carried out by individual data recording personnel for each water service provider. When the management is carried out individually, the data to be shared by other waterworks managers tend to be privatized, and consequently, it may become a big obstacle to proceed with many civil works such as emergency leak repair, road excavation, replacement of old buildings. This report introduces RFID (Radio Frequency Identification) system which is based on the magnetic field capable of IOT. It also describes the necessity of leveraging the system for smart managing of pipe management record that has been done by hand writing. The RFID system includes RFID marker, data reader, portable computer operating program, and data base server operating program. In this system, the data is managed with a single communication device, and it would be possible to share the information on the underground facilities and water treatment facilities. This RFID technology is expected to provide water service providers with opportunities to develop more scientific and modernized underground facilities information systems.

A study on the change of strength parameters reinforced rock bolt in the ground around tunnel (록볼트로 보강된 터널주변지반의 강도정수 변화에 대한 연구)

  • Kim, Sang-Hwan;Bang, Gyu-Min
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.1
    • /
    • pp.51-61
    • /
    • 2005
  • In general the strength parameter of the ground will be changed by reinforcing the ground around tunnel. In this case, the concept of tunnel design, such as supporting system, excavation, lining and so on, should be modified based on the failure criteria or the ground changed by the reinforcement. This paper presents the variation mechanism of strength parameters and new failure criteria of the reinforced ground. In order to perform this research, theoretical and experimental works were carried out. It was clearly founded that the cohesion of strength parameters is only increased by reinforcement of ground, especially by rock bolting.

  • PDF

Structure-From-Motion Approach to the Reconstruction of Surfaces for Earthwork Planning

  • Nassar, Khaled;Jung, Young-Han
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.1-7
    • /
    • 2012
  • The reconstruction of surfaces from unorganized point clouds can provide very useful information for construction managers. Although point clouds are generally created using 3D scanners, they can also be generated via the structure-from-motion technique using a sequence of images. Here we report a novel surface reconstruction technique for modeling and quantifying earthworks that can be used for preliminary planning, project updates and estimating of earthwork quantities, as well as embedded planning systems in construction equipment. The application of structure-from-motion techniques in earth works is examined and its advantages and limitations identified. Data from 23 earthwork excavation construction sites were collected and analyzed. 3D surface reconstructions during the construction phase were compared to the original land form. Similar experiments were conducted with piles of earth and the results analyzed to determine appropriate ranges of use for structure-from-motion surface reconstructions in earthwork applications. The technique was found to be most suited to pile of materials with volumes less than 2000 m3. Piles up to 10 m in height and with base areas up to $300m^2$ were also successfully reconstructed. These results should be of interest to contractors seeking to utilize new technology to optimize operational efficiency.

Analytical Technique and Load Transfer Features on Pile Using Finite Difference Method (유한차분법을 이용한 말뚝의 하중전이특성 및 해석기법)

  • Han, Jung-Geun;Lee, Jae-Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.9 no.5
    • /
    • pp.10-21
    • /
    • 2006
  • For analyze of the bearing capacity, skin friction and settlements of pile on axial compressive loading, both Load transfer tests of pile and pile loading test in field have application to commonly before pile installing. A bearing capacity of pile was affected by the characteristics of surrounding ground of pile. Especially, that is very different because of evaluation of settlement due to each soil conditions of ground depths. The ground characteristics using evaluation of bearing capacity of pile through load transfer analysis depends on N values of SPT, and then a bearing capacity of pile installed soft ground and refilled area may be difficult to rational evaluation. An evaluation of bearing capacity on pile applied axial compressive loading was effected by strength of ground installed pile, unconfined compressive strength at pile tip, pile diameter, rough of excavated surface, confining pressure and deformation modules of rock etc and these are commonly including the unreliability due to slime occurred excavation works. Load transfer characteristics considered ground conditions take charge of load transfer of large diameter pile was investigated through case study applied load transfer tests. To these, matrix analytical technique of load transfer using finite differential equation developed and compared with the results of pile load test.