Journal of the Korean Operations Research and Management Science Society
/
v.26
no.4
/
pp.133-141
/
2001
Rapid development in computer and network technology these days has created in environment in which decisions for manufacturing companies can be made in a much broader perspective. Especially, better decisions on production and distribution planning(PDP) problems can be made laking advantage of real time information from all the parties concerned. However, since the PDP problem-a core part of the supply chain management- is known to be the so-called NP-hard problem, so heuristic methods are dominantly used to find out solutions in a reasonable time. As one of those heuristic techniques, many previous studios considered genetic a1gorithms. A standard genetic a1gorithm applies rules of reproduction, gene crossover, and mutation to the pseudo-organisms so the organisms can pass along beneficial and survival-enhancing trails to a new generation. When it comes to representing a chromosome on the problem, it is hard to guarantee an evolution of solutions through classic a1gorithm operations alone, for there exists a strong epitasis among genes. To resolve this problem, we propose a hybrid genetic a1gorithm based on Silver-Meal heuristic. Using IMS-TB(Intelligent Manufacturing System Test-bed) problem sets. the good performance of the proposed a1gorithm is demonstrated.
Journal of the Korean Institute of Landscape Architecture
/
v.42
no.2
/
pp.91-102
/
2014
Recent trends in urban policies show the increasing importance of urban parks. Moreover the park policy and planning are increasingly important for the good urban park system. Comparative studies in the operational system and planning contents of the parks and green space plans of the major cities would be timely and meaningful. This study aims to provide a comparative study in operational system and planning contents of the Parks and Green Space Master Plan at urban scale. Sites include London, New York, Berlin, Sydney and Seoul. Analyses are focused on the master plans and strategy reports of each city. Frameworks for analysis are divided into operational system and planning contents. The results are as follows. First, the Parks and Green Space Plans as an open space planning linked to related resources would contribute to both integrated resources management and practice of the fairness. Second, evolution from quantity to quality of the parks and green space plan enhances revitalization and regeneration. Third, shift from the 'supply oriented plan' to 'need based plan' model provides flexible planning model to meet the demographic change, trend change, preference and use. Fourth, planning agents, enlarged opportunities for participation within each phase, diversified of the participants lead the changes from the passive participation to active one. In order to improve the practicability of the parks and green space master plan, a flexible planning strategy including social awareness changes and park governance is required.
Journal of Korean Society of Industrial and Systems Engineering
/
v.40
no.2
/
pp.111-120
/
2017
This paper proposes an improved standard genetic algorithm (GA) of making a near optimal schedule for integrated process planning and scheduling problem (IPPS) considering tool flexibility and tool related constraints. Process planning involves the selection of operations and the allocation of resources. Scheduling, meanwhile, determines the sequence order in which operations are executed on each machine. Due to the high degree of complexity, traditionally, a sequential approach has been preferred, which determines process planning firstly and then performs scheduling independently based on the results. The two sub-problems, however, are complicatedly interrelated to each other, so the IPPS tend to solve the two problems simultaneously. Although many studies for IPPS have been conducted in the past, tool flexibility and capacity constraints are rarely considered. Various meta-heuristics, especially GA, have been applied for IPPS, but the performance is yet satisfactory. To improve solution quality against computation time in GA, we adopted three methods. First, we used a random circular queue during generation of an initial population. It can provide sufficient diversity of individuals at the beginning of GA. Second, we adopted an inferior selection to choose the parents for the crossover and mutation operations. It helps to maintain exploitation capability throughout the evolution process. Third, we employed a modification of the hybrid scheduling algorithm to decode the chromosome of the individual into a schedule, which can generate an active and non-delay schedule. The experimental results show that our proposed algorithm is superior to the current best evolutionary algorithms at most benchmark problems.
Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
International conference on construction engineering and project management
/
2009.05a
/
pp.928-934
/
2009
Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.
Journal of Korea Society of Industrial Information Systems
/
v.15
no.4
/
pp.7-15
/
2010
This study proposes a rad o resource management scheme to maximize the performance of the LTE(Long Term Evolution) uplink, using SC-FDMA(Single Carrier-Frequency Division Multiple Access). Rather than the single-cell SC-FDMA system the existing studies are mainly concerning, this study focuses on multi-cell system which needs considering the interaction among cells. Radio resource management is divided into two phases, planning and operation phases. The former is for the master eNB(e-NodeB) to allocate RBs(radio bearer) to eNB, the latter for eNB to assign RBs to the mobiles in the cell. For each phase, an optimization model and greedy algorithm are proposed. Optimization models aim to maximize the system performance while satisfying the constraints for both QoS and RB continuity. The greedy algorithms, like generic ones, move from a solution to a neighboring one having the best objective value among neighboring ones. From the numerous numerical experiments, the performance and characteristics of the algorithms are analyzed. This study is expected to play a volunteering role in radio resource management for the multi-cell SC-FDMA system.
Journal of the Korean Institute of Intelligent Systems
/
v.21
no.1
/
pp.132-137
/
2011
The walking mobility with stability of 4 legged robots is the distinguished skills for many application areas. Planning gaits of efficient walking for quadruped robots is an important and challenging task. Especially, autonomous generation of locomotion is required to manage various robot models and environments. In this paper, we propose an adaptive locomotion control of 4 legged robot for irregular terrain using HyperNEAT. Generated locomotion is executed and analysed using ODE based Webots simulation for the 4 legged robot which is built by Bioloid.
For the vast majority of geostationary satellites currently in orbit, station keeping activities including orbit determination and maneuver planning and execution are ground-directed and dependent on the availability of ground-based satellite control personnel and facilities. However, a requirement linked to satellite autonomy and survivability in cases of interrupted ground support is often one of the stipulated provisions on the satellite platform design. It is especially important for a geostationary military-purposed satellite to remain within its designated orbital window, in order to provide reliable uninterrupted telecommunications services, in the absence of ground-based resources due to warfare or other disasters. In this paper we investigate factors affecting the robustness of a geostationary satellite's orbit in terms of the maximum duration the satellite's station keeping window can be maintained without ground intervention. By comparing simulations of orbit evolution, given different initial conditions and operations strategies, a variation of parameters study has been performed and we have analyzed which factors the duration is most sensitive to. This also provides valuable insights into which factors may be worth controlling by a military or civilian geostationary satellite operator. Our simulations show that the most beneficial factor for maximizing the time a satellite will remain in the station keeping window is the operational practice of pre-emptively loading East-West station keeping maneuvers for automatic execution on board the satellite should ground control capability be lost. The second most beneficial factor is using short station keeping maneuver cycle durations.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.9
no.5
/
pp.478-495
/
2016
The existing city planning was performed by internal few decision-maker, but the information that an individual could contact with through the evolution of the ICT technology increased in the smart city, and a channel diversified and came to be able to participate in a decision making process by various methods. I show that it is in the collaborative planning process to come to a mutual understanding with residents directly or indirectly if utilize big data in a process of the safe community planning of the smart city. Therefore, I compare the utilization contents between data of Matsubara-shi,Japan and data of certification city of Korea which received the certification of the WHO international safe community. In the area where this study prepares for the approval of the international safe community, it wants you to use it though you utilize the data as the supporting role of the residents participation plan.
The starting point of this study is the concerning of simple behavioral pattern that whoever enters the inner space with taking off his shoes should go out from the position where he laid his shoes. The using of Ondol (floor heating room) and Maru (lifted wood floor) had changed the architectural space from chair-sitting to floor-sitting space, and it also made the behavior of taking off the shoes at the entrance of building and stepping on the lifted floor. This simple behavior has possibility to make lots of changes to the culture of architectural design. With this noticeable point, this paper is talking about the cultural feature of Korean traditional architecture, especially about the influence of tanking off and putting on shoes. The matter of shoes has changed diverse aspects of building and layout planning. It maximized the difference between front and rear part of building and characterized the lateral extension of Korean traditional house. The ritual space also had evolved from chair-sitting to floor-sitting space according to the type of ritual behavioral pattern. The change on the single building level had influenced on the layout planning of architectural complex. For examples, the parallel layout of ChangDeok-gung palace and the long sequential process to the main pavilion of Buddhist temple are the result of the matter of shoes. And NuGak(樓閣), the double-storied pavilion, on the axis of entering sequence's node is one of the unique planning elements that makes possible to go through the building without taking off the shoes and also makes upper level space for staying. In short, Korean traditional architecture that has the chair-sitting spatial origin of the East Asian cultural sphere has pursued new architectural issues and planning methods according to evolution to the floor-sitting culture.
The residential environment is a place which reflects the gradual evolution of human consciousness because it is a cultural space the term, 'houses' is not relevant in this context as it literally means 'contains'. The long history of human living habits cannot be 'contained' within a space, but can be 'expressed' by a space and by the way the space is used. Furthermore, due to the way it is typically constructed, the basic characteristics of the house usually cannot be rapidly changed to accommodate new habits. However, recent changes that have taken place to the characteristics of the traditional master room suggest that traditional societal values associated with patriarchy have diminished. The current trend where priority is given to children's education also affects such a change. Existing researches related to the master room is confined to the behavioral use of the space and the composition of the physical space, while research on the master room its plane type has not been carried out. Therefore, in this study, apartment model houses are selected, and are classified according to the types of master room. An analysis is then carried out of the master room based on the occupants' requirements in terms of consciousness. Any planning modifications where required are then suggested. This research comprises the followings stages. First, an examination is carried out of existing research on the master room in order to understand its background and spatial components. A definitiones of related terms is also provided. Second, an analysis is carried out of the model houses exhibited at Suwan District, examining the typical standard that has been selected for the master room. Third, an analysis is conducted of the topics and questions to be selected for a questionnaire. Fourth, an analysis is carried out of the consciousness, satisfaction and requirements of the residents, as respondents in the questionnaire, related to the master room. and Research is then conducted of the architectural methods for planning the master room. Finally, future countermeasures for planning the master room are described based on the above analysis and research findings.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.