• 제목/요약/키워드: Event Scheduling

검색결과 106건 처리시간 0.027초

이산적 시뮬레이션 모델을 이용한 생산 스케쥴 (APPLICATION OF DISCRETE EVENT SIMULATION TO PRODUCTION SCHEDULING)

  • 박영홍
    • 한국시뮬레이션학회논문지
    • /
    • 제10권1호
    • /
    • pp.1-12
    • /
    • 2001
  • This article describes the application of discrete event simulation in a process industry (coffee manufacturing) as a daily production-scheduling tool. A large number of end products (around 300), sporadic demand, and limited shelf life of coffee (90 days) make it difficult to generate feasible production schedules manually. To solve this problem, an integrated system was developed incorporating discrete event simulation methodology into scheduling process. The integrated system is comprised of two components: a scheduling program and a simulation model. The scheduling program is used to generate daily schedules for roasting, grinding, and packing coffee. The simulation model uses the generated schedules to simulate the production of coffee and regenerates a modified production schedule. In this paper, each of the components will be described in detail, evaluated in terms of performance factors, and validated with a set of real production data. Although this article focuses on a specific system, we will share our experiences and Intuitions gained and encourage other process industries to develop simulation-based scheduling tools.

  • PDF

이벤트 지향 DEVS 실행 환경의 설계, 구현 및 성능 비교 (Design, Implementation and Performance Analysis of Event-oriented Execution Environment for DEVS)

  • 권세중;김탁곤
    • 한국시뮬레이션학회논문지
    • /
    • 제20권1호
    • /
    • pp.87-96
    • /
    • 2011
  • DEVS는 이산 사건 시스템을 명세하는 집합론에 근거한 수학적인 틀이다. 이러한 DEVS를 통해 시스템을 시뮬레이션할 때는 명세된 DEVS로부터 구현된 모델과 시뮬레이션 엔진으로 이루어진 실행 환경이 필요하다. 시뮬레이션 엔진은 스케줄링 알고리즘을 통해 모델을 해석하고 실행하는데, 주로 DEVS의 계층적이고 모듈러한 특성을 따라 계층적인 스케줄링 방법을 사용한다. 그러나 이 방법은 계층적인 구조로 인해 시간 관리와 메시지 패싱에 있어서 오버헤드가 존재한다. 본 논문에서는 이러한 오버헤드를 해결하기 위해 이벤트 지향 시뮬레이션을 적용한다. 이벤트 지향의 시뮬레이션은 이벤트에 의해서 모델이 실행되며 이벤트 리스트에 의해 이벤트가 관리된다. 이벤트 리스트에 의해서 시간 관리가 되고 메시지 패싱이 이루어지기 때문에 계층적인 오버헤드를 줄이고 성능 향상을 이룰 수 있다. 본 논문은 이벤트 리스트를 이용한 실행 환경을 제안하고 이러한 실행 환경을 위한 모델 구현 방안에 대해 논하며, 각 실행 환경의 성능을 비교, 분석한다.

조선 선체 생산설계 일정 계획을 위한 상세 이산사건 모델링기반 비즈니스 프로세스 시뮬레이션 (High-level Discrete-event Modeling-based Business Process Simulation for the Scheduling of the Ship Hull Production Design)

  • 손명조;김태완
    • 한국CDE학회논문집
    • /
    • 제18권3호
    • /
    • pp.224-233
    • /
    • 2013
  • For the scheduling and the job assignment of the ship hull production design which is a process-based work, we suggest the simulation-based scheduling using the discrete-event-based business process simulation. First, we analyze the ship hull production design process from the perspective of a job assignment to make it into the simulation model using DEVS (Discrete Event System Specification) which is the representative modeling method for a discrete-event simulation. Based on the APIs of the open-source discrete-event simulation engine, we implement the simulation using the Groovy script. We develop the scenario generator in which the user defines detail information of the construction drawing and its member blocks, and design engineers information, and the various setting for the simulation including the job assignment strategy. We use the XML files from this scenario generator as inputs of simulation so that we can get simulation result in forms of Gantt chart without changes of the simulation model.

DESIGN AND IMPLEMENTATION OF THE MISSION PLANNING FUNCTIONS FOR THE KOMPSAT-2 MISSION CONTROL ELEMENT

  • Lee, Byoung-Sun;Kim, Jae-Hoon
    • Journal of Astronomy and Space Sciences
    • /
    • 제20권3호
    • /
    • pp.227-238
    • /
    • 2003
  • Spacecraft mission planning functions including event prediction, mission scheduling, command planning, and ground track display have been developed for the KOMPSAT-2 mission operations. Integrated event prediction functions including satellite orbital events, user requested imaging events, and satellite operational events have been implemented. Mission scheduling functions have been realized to detect the mission conflicts considering the user specified constraints and resources, A conflict free mission scheduling result is mapped into the spacecraft command sequences in the command planning functions. The command sequences are directly linked to the spacecraft operations using eXtensible Markup Language(XML) for command transmission. Ground track display shows the satellite ground trace and mission activities on a digitized world map with zoom capability.

A Study on the Performance Improvement of Message Transmission over MVB(Multifunction Vehicle Bus)

  • Choi, Myung-Ho;Park, Jae-Hyun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2003년도 ICCAS
    • /
    • pp.2198-2202
    • /
    • 2003
  • The data transmission of MVB(Multifunction Vehicle Bus) of TCN(Train Network Communication) is divided into the periodic transmission phase and the sporadic transmission phase. TCN standard defines the event-polling method for the message transfer in the sporadic phase. However, since the event-polling method does not use pre-scheduling to the priority of the messages to be transmitted, it is inefficient for the real-time systems. To schedule message transmission, a master node should know the priority of message to be transmitted by a slave node prior to the scheduling the sporadic phase, but the existing TCN standard does not support any protocol for this. This paper proposes the slave frame bit-stuffing algorithm, with which a master node gets the necessary information for transmission scheduling and includes the simulation results of the event-polling method and the proposed algorithm.

  • PDF

Discrete event systems modeling and scheduling of flexible manufacturing systems

  • Tamura, Hiroyuki;Hatono, Itsuo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1991년도 한국자동제어학술회의논문집(국제학술편); KOEX, Seoul; 22-24 Oct. 1991
    • /
    • pp.1564-1569
    • /
    • 1991
  • In this paper we describe Flexible Manufacturing Systems (FMS) using Petri nets, since Petri nets provide a powerful tool for modeling dynamical behavior of discrete concurrent processes. We deal with off-Line and on-Line rule-based scheduling of FMS. The role of the rule-base is to generate appropriate priority rule for resolving conflicts, that is, for selecting one of enabled transitions to be fired in a conflict set of the Petri nets. This corresponds to select a part type to be processed in the FMS. Towards developing more Intelligent Manufacturing Systems (IMS) we propose a conceptual framework of a futuristic intelligent scheduling system.

  • PDF

이산적 시뮬레이션 모델을 이용한 커피 생산 스케줄

  • 박영홍
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 2000년도 추계학술대회 논문집
    • /
    • pp.28-33
    • /
    • 2000
  • This article describes the application of discrete event simulation in a process industry (coffee manufacturing) as a daily production-scheduling tool. A large number of end products (around 300), sporadic demand, and limited shelf life of coffee (90 days) make it difficult to generate feasible production schedules manually. To solve this problem an integrated system was developed incorporating discrete event simulation methodology into scheduling process. The integrated system is comprised of two components: a scheduling program and a simulation model. The scheduling program is used to generate daily schedules for roasting, grinding, and packing coffee. The simulation model uses the generated schedules to simulate the production of coffee and regenerates a modified production schedule. In this paper, each of the components will be described in detail, evaluated in terms of performance factors, and validated with a set of real production data. Although this article focuses on a specific system, we will share our experiences and intuitions gained and encourage other process industries to develop simulation-based scheduling tools.

  • PDF

실시간 내장형 시스템의 설계를 위할 비선점형 고정우선순위 스케줄링 (Non-Preemptive Fixed Priority Scheduling for Design of Real-Time Embedded Systems)

  • 박문주
    • 한국정보과학회논문지:컴퓨팅의 실제 및 레터
    • /
    • 제15권2호
    • /
    • pp.89-97
    • /
    • 2009
  • 유비쿼터스 환경에서 널리 사용되고 있는 내장형 시스템에서는 메모리 사용량의 감소와 신뢰성 등의 이유로 쓰레드 기반 프로그래밍 모델보다는 이벤트-구동형 프로그래밍 모델을 채용하는 경우가 많다. 그러나 내장형 시스템의 소프트웨어가 점점 더 복잡해지면서, 내장형 시스템을 위한 소프트웨어를 이벤트-구동형 프로그래밍 모델의 단일 이벤트 핸들러로 프로그램 하는 것은 매우 어려운 과제가 되고 있다. 본 논문에서는 내장형 시스템의 설계에 비선점형 스케줄링 기법을 도입하기 위하여, 다항시간의 스케줄 가능성 평가를 위한 충분조건과 이를 이용한 효율적인 스케줄 가능성 검사 방법을 제시하며, 또한 내장형 시스템에서의 서브-태스크의 활용이 비선점형 스케줄링을 채용했을 때의 단점인 낮은 처리기 이용률을 극복할 수 있는 방안임을 보인다.

변동성을 고려한 탑재프로세스 모델링과 시뮬레이션에 관한 연구 (A Study on the Erection Process Modeling and Simulation considering Variability)

  • 임현규;이용길;김병철;우종훈
    • 대한조선학회논문집
    • /
    • 제53권2호
    • /
    • pp.101-107
    • /
    • 2016
  • Generally, the shipbuilding industry has finite resources and limited workspace. Due to finite resources, limited workspace and state of block preparation, erection process in shipbuilding industry is frequently delayed than erection process scheduling which is planned at long-term plan stage. In this study, considering variability of block reserve ratio, the degree of delay in real erection process is measured and compared to scheduling which is planned at long-term plan stage in shipbuilding industry including finite capacity and variative lead time. Also, the erection process scheduling which has minimum lead time can be checked through simulation. The results of this study could be improved the accuracy of erection process scheduling by checking the main event compliance ratio by block reserve ratio and calculating the optimum erection pitch for the main event compliance.

TCN을 통한 메시지 전송 능력 향상에 관한 연구 (Performance Improvement of Message Transmission over TCN(Train Communication Network))

  • 최명호;문종천;박재현
    • 대한전기학회논문지:시스템및제어부문D
    • /
    • 제53권10호
    • /
    • pp.720-726
    • /
    • 2004
  • The data transmission over MVB(Multifunction Vehicle Bus) of TCN(Train Communication Network) is divided into the periodic transmission phase and the sporadic transmission phase. TCN standard recommends the event-polling method as the message transfer in the sporadic phase. However, since the event-polling method does not use pre-scheduling to the priority of the messages, it is inefficient for the real-time systems. To schedule message transmission, a master node should know the priority of message to be transmitted by a slave node prior to the sporadic phase, but the existing TCN standard does not support any protocol for this. This paper proposes the slave frame bit-stuffing algorithm, with which a master node gets the necessary information for scheduling and includes the simulation results of the event-polling method and the proposed algorithm.