• 제목/요약/키워드: Evaluation of Economic Feasibility

검색결과 311건 처리시간 0.035초

자립형 철골 접합부를 이용한 철골설치 방식의 경제성 평가에 관한 연구 (A Study on Economic Evaluation Method of Steel Erection Work using by Self-supported Steel Joint)

  • 김창기;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.3-7
    • /
    • 2009
  • Construction projects are being the skyscraper and the large size by limited site condition and developing construction technology. Therefore, Steel structure work is steadily increasing caused by easy to work and structural safety. However, steel-frame work has the large incidence of heavy accident potentially. Recently a research group has recently developed newly designed self-supported steel joint for enhancing safety of steel erection work. Before applying the steel joint in a construction site, economic evaluation should be performed. Thus, we proposed the method for measuring economic efficiency of the new steel joint and verified economic feasibility of the steel joint method through a case study. As a result, Steel erection method using by self-supported steel joint showed economic rather than the one using by H-beams.

  • PDF

물량저감 중공 철근콘크리트 교각의 설계프로그램과 경제성 평가 (Design Program and Economic Evaluation for Hollow RC Bridge Columns with Reinforcement Details for Material Quantity Reduction)

  • 김태훈;손윤기;양남석;이승훈
    • 한국전산구조공학회논문집
    • /
    • 제27권5호
    • /
    • pp.403-412
    • /
    • 2014
  • 이 연구에서는 물량저감 철근상세를 갖는 중공 철근콘크리트 교각 시스템의 전용 설계프로그램과 소성설계 적용 결과를 제시하였다. 개발된 물량저감 철근상세는 경제성과 합리성을 갖으며 공사기간의 단축을 가져올 수 있다. 물량저감 중공 철근콘크리트 교각의 적용을 통해 경제성 평가를 수행하였다. 평가 결과 개발상세가 기존상세에 비해 구조적 합리성, 시공성, 그리고 경제성 등이 우수함을 확인하였다.

전지전력저장시스템의 경제성분석 (Economic Evaluation of BESS (Battery Energy Storage System))

  • 김재철;최준호;김응상;최병수;이영하;황용하
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1091-1093
    • /
    • 1998
  • The BESS has a major advantages such as load leveling, quick response emergency power (spinning reserve), frequency and voltage control, improvement of reliability, and deferred generation and transmission capacity construction. However, the economic feasibility of these systems requires justification from the customer side of meter. In this paper, we proposed the economic evaluation model of BESS which is modified and complemented the SYSPLAN model[2]. In addition, we analyzed a economic evaluation from the economic measures such as payback period, overall benefit, ROI, and ROR.

  • PDF

리모델링 프로젝트의 효율적 경제성 평가방안 (An Efficient Economic Evaluation Method for Remodeling Project)

  • 김경중;우경섭;박찬식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.261-266
    • /
    • 2001
  • 개발의 시각이 보존으로 바뀌면서 리모델링의 개념이 도래하였다. 경험이 부족한 국내 리모델링사업에서 경제성 검토단계는 사업주체에게 있어서 정확한 분석이 필요한 분야라 할 수 있다. 이에 본 연구는 리모델링 사업수행 시 경제성검토 단계에서 리모델링 전과 후의 가치를 비교할 수 있는 방법들을 다양한 시각으로 고찰하여 건물의 실제가치를 평가할 수 있는 방안제시를 목적으로 수행하였다. 이를 위해 기존의 건축분야와 부동산분야의 경제성 평가기법들을 조사하고 그 문제점 및 장·단점을 분석하였다. 이를 바탕으로 건축분야에서 사용되고 있는 기존의 경제성 평가기법에 부동산분야의 감정평가기법을 응용한 혼합형 평가 기법을 구축하여 그 절차와 방법을 제시하고, 실제 사례에 적용하여 타당성을 검토하였다.

  • PDF

FEASIBILITY STUDIES FOR INFRASTRUCTURE CONSTRUCTION PROJECTS: HOW GOOD ARE THEY?

  • Khalied H. Hyari
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.820-829
    • /
    • 2007
  • This paper presents an evaluation of feasibility studies conducted to justify investments in infrastructure projects. An analysis of a previous feasibility study for a highway construction project is presented in this paper with an emphasis on the estimates and forecasts presented in that study in order to weigh expected benefits from the project against expected costs. The forecasted numbers are compared with actual data collected during the operation phase about the usage of the facility. The comparison reveals a huge difference between estimated numbers and actual numbers. Based on the lessons learned from the analyzed case study, recommendations are presented to improve feasibility studies for infrastructure projects including: peer review of feasibility studies; before-and-after feasibility studies; and defined scope and methodology for feasibility studies. Decision makers are advised to take outcomes of feasibility studies for infrastructure projects with extreme caution as some studies may provide erroneous and misleading input to their decisions regarding investment in infrastructure projects.

  • PDF

장수명주택에 적합한 지하주차장 PC구조시스템의 경제성분석에 관한 연구 (Economic Evaluation of Underground Parking Lot PC Structural System that is Suitable for Long-Life Housing)

  • 조민주;김종성
    • 한국주거학회논문집
    • /
    • 제26권2호
    • /
    • pp.103-110
    • /
    • 2015
  • Precast Concrete (PC) construction method can be the one that is suitable for long-life housing due to its merit in respect of maintenance and durability based on crack-free from mass production with indirect construction cost-saving-effect due to shortening construction period comparing to the conventional construction method, but it has the problem that causes the raise of direction construction costs. So, this study analyzed its economic feasibility of PC method whose maintenance and durability are excellent for underground parking lot of apartment house for accomplishing cost-saving long-life housing by applying the various structural system. In evaluation of unit module structural system, two-way PC system requires 10 to 28% more costs for frame work than RC rigid frames, and, one-way PC system 98~112%. Although it varies depending on the method, the costs are similar to RC rigid frame structure, provided a proper method is adopted. Also, Model 11, which was most economical in the evaluation, was applied to an real parking lot and about 2 to 6% of construction costs was reduced than RC rigid frames. This seems to be because, although PC system has a higher production cost, introduction of P.S (prestress) reduces member depth and, therefore, height, as well as the number of members per unit module.

국내 풍력발전의 경제성 분석에 관한 연구 (Analysis on Economic Feasibility of Offshore wind power)

  • 신영은
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 추계학술대회 초록집
    • /
    • pp.149.2-149.2
    • /
    • 2011
  • This paper conducted an analysis of economic effects of offshore wind power in Korea with benefit/cost analysis. The existing feed-on tariff, which was too low to support wind power development, was recently replaced with a Renewable Portfolio Standard(RPS), effective from 2012. According to the new regulatory policy, The Korean government has announced a strategy to draw investments worth for offshore wind farms with a total capacity of 2.5 GW over the next eight years, which is expected the change of cost and benefit. After overview the offshore wind power development status, The effects on cost can be divided by economic, environmental and social factors. Each factor will be calculated and combined by both evaluating index and using Quantification methods. At the end, the implication for the evaluation of feasibility of offshore wind power of Korea will be done.

  • PDF

저급탄용 순환유동층 보일러 발전설비의 경제성 평가 (Economic Feasibility of Circulating Fluidized Bed Combustion Boiler Power Plant for Low Grade Coal)

  • 홍민표;문승재
    • 플랜트 저널
    • /
    • 제8권1호
    • /
    • pp.73-80
    • /
    • 2012
  • The structure and combustion characteristics, and the economic feasibility of the circulating fluidized bed combustion(CFBC) boiler using low grade coal were introduced. The economic feasibility is evaluated by comparing a 500 MW CFBC boiler power plant using low grade coal and a pulverized combustion boiler power plant with high grade coal. As the result of the evaluation, the pulverized coal combustion boiler power plant has an internal rate of return of 12.95%, 1,395.9 billion Korean won of net present value, and 6.26 years of payback period. On the other hand, CFBC boiler power plant has an internal rate of return of 13.54%, 1,704.3 billion Korean won of net present value, and 6.02 years payback period. Therefore, the CFBC boiler power plant has better feasibility in all aspects, as 0.59% higher of internal rate of return, 308.4 billion Korean won of higher net present value and 0.24 year of shorter payback period.

  • PDF

리모델링 사업의 경제성 평가 방안 -임대 아파트를 중심으로- . (An Economic Evaluation Method for Remodeling Project - focusing on the rental apartment -)

  • 김해정;강현규;한충희;김선국
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.359-362
    • /
    • 2001
  • 노후한 아파트들에 대한 사업 대안은 대부분이 재건축이었다. 그러나 건설자원의 고갈과 건설환경의 변화로 리모델링 사업은 노후한 건물의 새로운 관리방안으로 도입되고 있다. 이는 재건축의 사업 추진여부가 건물의 물리적 노후화에 기인하기보다는 기능적, 경제적 이유로 추진되었기 때문에, 리모델링을 통해 건물의 조기 재건축을 방지만 수 있으리라 예상되기 때문이다. 리모델링 사업을 성공적으로 수행하기 위해서는 사업 계획단계에서 합리적인 경제성 검토가 선행되어야 한다. 그러나 국내 리모델링 사업은 초기단계로 경제성 평가에 대한 사례 및 연구가 매우 미비한 실정이다. 따라서 본 연구에서는 고충 임대아파트를 중심으로 주택부문의 리모델링 사업에 대한 합리적 경제성 평가 방안을 제시하고자 한다.

  • PDF

도로공사로 인한 부(-)의 편익 반영 및 경제성 분석 (Estimation of Road User Costs Caused by Work Zones and Economic Analysis in the Feasibility Study)

  • 이승현;이재영;최기주
    • 대한토목학회논문집
    • /
    • 제30권5D호
    • /
    • pp.461-465
    • /
    • 2010
  • 본 연구의 목적은 예비타당성조사에서 수행한 도시부 간선도로 확장공사로 인한 부(-)의 편익을 산정하고 이것이 경제성 평가에 미치는 영향을 분석하는 것이다. 북부간선도로 태릉-구리 간 확장사업의 실제 예비타당성조사 단계에서 통상적인 편익 산출 방법론을 적용하였으며, 공사로 인한 차량운행비용, 통행시간, 교통사고, 환경비용의 부(-)의 편익을 산출하였다. 분석 결과, 부(-)의 편익의 적용여부는 사업의 경제적 타당성 평가에 많은 영향을 주는 것으로 나타났다. 하지만 공사기간, 공사의 종류, 공사구간 및 교통량 등에 따라 부(-)의 편익에 많은 영향을 주는 감소되는 용량 및 자유속도가 현저하게 다를 수 있으며, 향후에는 이러한 요소와 용량 및 자유속도에 대한 상세한 연구가 필요할 것이다.