• Title/Summary/Keyword: Evaluation Schedule

Search Result 266, Processing Time 0.024 seconds

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_2
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects (선보상-후시공 제도의 공공건설사업 파급효과 분석)

  • Kim Sang-Bum;Choi Jeong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.245-254
    • /
    • 2004
  • Pre-compensation and post-construction policy'(PCPC) is a part of $\ulcorner$public project performance improvement policies (PPPIP)$\lrcorner$ whose purpose is to reduce the construction project cost by $20\%$. This research focuses on measuring the quantitative and qualitative impacts of PCPC public construction project. The evaluation of PCPC was conducted using five performance indices which are measuring performance improvement in terms of project cost and schedule. The analysis results show that implementation of this policy reduced $4.8\%$ of public construction project budget while playing a positive role in shortening the project schedule.

The Performance Evaluation of a Gas Turbine Combustor (가스터빈 연소기의 성능평가)

  • Ahn, Kook-Young;Kim, Han-Seok;Ahn, Jin-Hyuk;Pae, Hyoung-Su
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.24 no.10
    • /
    • pp.1294-1299
    • /
    • 2000
  • The combustion characteristics have been investigated to develop the 50 kW-class gas turbine combustor. The combustor design program was developed and applied to design this combustor. The combustion air which has the temperature of 45, 200, $300^{\circ}C$ were supplied to combustor for elucidating the effect of inlet air temperature on CO, NOx emissions and flame temperature. The exit temperature and NO were increased and CO was decreased with increasing inlet air temperature. Also, the effect of equivalence ratio was considered to verify the combustor performance. The emissions of CO and NO with inlet air temperature can be analyzed qualitatively by measuring the temperature inside the combustor. The combustion performance with fuel schedule was evaluated to get the informations of the starting and part loading process of gas turbine. The combustion was stable above the equivalence ratio of 0.18. The pattern factor which is the important parameter of combustor performance was satisfied with the design criterion. Consequently the combustor was proved to meet the performance goal required for the target gas turbine system.

Design of a virtual dismantling facility for research reactor (연구로 가상 해체 시설 설계)

  • Park Hui-Seong;Kim Seong-Gyun;Lee Geun-U;O Won-Jin;Park Jin-Ho
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2005.11a
    • /
    • pp.47-55
    • /
    • 2005
  • A design of a dismantling mock-up system have been established based on the result that analyzed a characteristic of modules which need to design a virtual dismantling facility. A unit program composed of a various module such as a decommissioning database system. 3D dosimetric mapping that represents a distribution of a radionuclide contamination, a evaluation module for a dismantling schedule and cost A research of software architecture was carried out in order to Integrate these components that have been independently operated. The result was established an architecture that consis of a visualization module which could be visualized D&D activities and a simulation module which tan he evaluated a dismantling schedule and decommissioning cost.

  • PDF

Development and Analysis of Real-time Distributed Air Defense System Simulator Using a Software Framework (소프트웨어 프레임워크를 이용한 대공유도무기 실시간 분산 시뮬레이터 개발 및 분석)

  • Cho, Byung-Gyu;Youn, Cheong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.8 no.4 s.23
    • /
    • pp.58-67
    • /
    • 2005
  • To overcome limitations of test scope, schedule and cost, M&S(Modeling & Simulation) technique has been applied for T&E(Test and Evaluation) of the state-of-art weapon systems. This paper proposes an air defense simulation software framework to reduce both redundancy an[1 programming errors in system simulator. The proposed framework consists of a 'model' and a 'middleware' The 'middleware' is a reliable communication service layer that supports not only HLA(High Level Architecture) which is an international standard in M&S but also TCP/IP, UDP and etc. The main role of 'model' is to schedule and to run the real-time distributed simulation. The proposed framework has been applied to M-SAM(Middle range Surface to Air Missile) system simulator. The proposed framework's scheduling and communication performance results are satisfactory and were measured by hardwired NTP(Network Timer Protocol) time-stamp with GPS(Global Positioning System) timer for better precision.

An Evaluation of Chiller Control Strategy in Ice Storage System for Cost-Saving Operation (운전비 절감을 위한 빙축열시스템 냉동기 운전기법 평가)

  • Lee, Kyoung-Ho;Choi, Byoung-Youn;Lee, Sang-Ryoul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.2
    • /
    • pp.97-105
    • /
    • 2008
  • This paper presents simulated and experimental test results of optimal control algorithm for an encapsulated ice thermal storage system with full capacity chiller operation. The algorithm finds an optimal combination of a chiller and/or a storage tank operation for the minimum total operation cost through a cycle of charging and discharging. Dynamic programming is used to find the optimal control schedule. The conventional control strategy of chiller-priority is the baseline case for comparing with the optimal control strategy through simulation and experimental test. Simulation shows that operating cost for the optimal control with chiller on-off operation is not so different from that with chiller part load capacity control. As a result from the experimental test, the optimal control operation according to the simulated operation schedule showed about 14 % of cost saving compared with the chiller-priority control.

Proposal and Performance Evaluation of A Scalable Scheduling Algorithm According to the Number of Parallel Processors (병렬 처리장치의 개수에 따른 스케줄링 알고리즘의 제안 및 성능평가)

  • Gyung-Leen Park;Sang Joon Lee;BongKyu Lee
    • Journal of Internet Computing and Services
    • /
    • v.1 no.2
    • /
    • pp.19-28
    • /
    • 2000
  • The scheduling problem in parallel processing systems has been a challenging research issue for decades. The problem is defined as finding an optimal schedule which minimizes the parallel execution time of an application on a target multiprocessor system. Duplication Based Scheduling (DBS) is a relatively new approach for solving the problem. The DBS algorithms are capable of reducing communication overhead by duplicating remote parent tasks on local processors. Most of DBS algorithms assume an availability of the unlimited number of processors in the system. Since the assumption may net hold in practice, the paper proposes a new scalable DBS algorithm for a target system with limited number of processors. It Is shown that the proposed algorithm with N available processors generates the same schedule as that obtained by the algorithm with unlimited number of processors, where N is the number of input tasks. Also, the performance evaluation reveals that the proposed algorithm shows a graceful performance degradation as the number of available processors in the system is decreased.

  • PDF

Development of Navigation Program for Cancer Patients using Mobile application (암환자를 위한 모바일 앱용 네비게이션프로그램 개발)

  • Kwon, Geun-ae;Jeong, Ga-jin;Park, Joo-mi;Jung, Mi-kyoung;Seo, Hwa-jeong;Kim, Jee-yoon;Kim, Yeon-hee;Park, Jeong-yun
    • Quality Improvement in Health Care
    • /
    • v.21 no.2
    • /
    • pp.28-38
    • /
    • 2015
  • Objectives: The objectives of this research were to develop and evaluate a mobile application for navigation program for cancer patients who might experience some difficulties in obtaining and understanding further schedules, directions due to flooding information at a time and scattered educational materials. Methods: A mobile application was developed an educational mobile app for cancer patients based on a systematic instructional design model called ADDIE (Analysis, Design, Development, Implementation, and Evaluation) model. The developed application was evaluated by 76 users through a questionnaire of satisfaction. Results: A mobile app contains educational contents for cancer patients, based on their satisfaction, demand and knowledge about cancer education and information services. It contains management of symptoms, management of my schedule, and information about chemotherapy, FAQ, symptoms dangerous enough to contact the hospital, personal history about how to overcome cancer, hospital convenience facilities and education schedule of cancer center. A result of the evaluation of user's satisfaction showed 59.4% responding 'Satisfied' and 27.4% 'Very satisfied'. Conclusion: The personalized information and education contents for cancer patients by using the mobile application was given to cancer patient and then educational outcomes became more effective. The development of the application which persons can use regardless of time and place enables health care providers to acquire the foundation of the patients-oriented educational system. Education satisfaction and knowledge level was increased, after using mobile application.

Probabilistic Project Duration Estimation by Combination of PERT and PLET in High-Risk Project (고위험 사업에서 PERT와 PLET기법 결합에 의한 확률적 사업공기 추정)

  • Kim, Seon-Gyoo;Kim, Junyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.71-80
    • /
    • 2016
  • PERT(Project Evaluation and Review Technique) is typical method in order to probabilistically establish the schedule plan for large scale complex project or mega project. PERT technique is impossible to estimate relationship of each activity probabilistically when there are overlapping relationships because it is limited to Finish-to-Start(FS) relationship. In order to overcome this kind of limitation of PERT technique, PLET(Probabilistic Linkage Evaluation Technique) has been suggested to probabilistically estimate project duration for various overlapping relationships for each activity. However, estimating project duration by PLET technique only considers uncertainty of relationship between activities and not activity time, thus it is not the perfect duration estimating method. The main objective of this research is to propose the integration model of PERT and PLET and verify its probabilistic validity. By verifying application of time calculation method of integration model in practical case, this research will suggest probabilistic project duration estimating method in schedule plan of high-risk construction industry.