• Title/Summary/Keyword: Estimation CBR

Search Result 38, Processing Time 0.025 seconds

Case-Based Reasoning Cost Estimation Model Using Two-Step Retrieval Method

  • Lee, Hyun-Soo;Seong, Ki-Hoon;Park, Moon-Seo;Ji, Sae-Hyun;Kim, Soo-Young
    • Land and Housing Review
    • /
    • v.1 no.1
    • /
    • pp.1-7
    • /
    • 2010
  • Case-based reasoning (CBR) method can make estimators understand the estimation process more clearly. Thus, CBR is widely used as a methodology for cost estimation. In CBR, the quality of case retrieval affects the relevance of retrieved cases and hence the overall quality of the reminding capability of CBR system. Thus, it is essential to retrieve relevant past cases for establishing a robust CBR system. Case retrieval needs the following tasks to obtain appropriate case(s); indexing, search, and matching (Aamodt and Plaza 1994). However, the previous CBR researches mostly deal with matching process that has limits such as accuracy and efficiency of case retrieval. In order to address this issue, this research presents a CBR cost model for building projects that has two-step retrieval process: decision tree and nearest neighbor methods. Specifically, the proposed cost model has indexing, search and matching modules. Features in the model are divided into shape-based and scale-based attributes. Based on these, decision tree is established for facilitating the search task and nearest neighbor method was utilized for matching task. In regard to applying nearest neighbor method, attribute weights are assigned using GA optimization and similarity is calculated using the principle of distance measuring. Thereafter, the proposed CBR cost model is developed using 174 cases and validated using 12 test cases.

Comparative Study on Similarity Measurement Methods in CBR Cost Estimation

  • Ahn, Joseph;Park, Moonseo;Lee, Hyun-Soo;Ahn, Sung Jin;Ji, Sae-Hyun;Kim, Sooyoung;Song, Kwonsik;Lee, Jeong Hoon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.597-598
    • /
    • 2015
  • In order to improve the reliability of cost estimation results using CBR, there has been a continuous issue on similarity measurement to accurately compute the distance among attributes and cases to retrieve the most similar singular or plural cases. However, these existing similarity measures have limitations in taking the covariance among attributes into consideration and reflecting the effects of covariance in computation of distances among attributes. To deal with this challenging issue, this research examines the weighted Mahalanobis distance based similarity measure applied to CBR cost estimation and carries out the comparative study on the existing distance measurement methods of CBR. To validate the suggest CBR cost model, leave-one-out cross validation (LOOCV) using two different sets of simulation data are carried out. Consequently, this research is expected to provide an analysis of covariance effects in similarity measurement and a basis for further research on the fundamentals of case retrieval.

  • PDF

A Study on Rehabilitation Space for the Development of Community-Based Rehabilitation - Focused on the Estimation of Optimum Space - (안산시 CBR사업 추진을 위한 재활공간에 관한 연구 - 적정면적 산정을 중심으로 -)

  • Park, Jae-Seung;Na, Sang-Bae;Kim, Gab-Dong
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.3 no.4
    • /
    • pp.35-49
    • /
    • 1997
  • The percentage of postnatal disabled people and elderly population is rapidly increased by the industrialization, and the improvement of medical technology. The disparity between the city and rural area is in the way to disabled people who need rehabilitation. To solve these problems, Community Based Rehabilitation(CBR) is suggested by WHO. In this study, at first, the CBR model considering the specific characteristics of AnSan City are presented. Secondly, the first, the second, and the third rehabilitation facilities in AnSan City are classified by the CBR model. Thirdly, the estimation of optimum space for physical therapy and occupational therapy at rehabilitation center and public health center are sugested, which are the second level rehabilitation facilities. There are some differences in the distribution of population between new and old area in AnSan City. In other words, the subject population of CBR program in old area is relatively higher than that of new area. So, the CBR program for AnSan City must reflect their regional characteristics. In this study, the therapeutic boundaries of second level rehabilitation facilities is decided through the survey of physical therapists and occupational therapists in general hospitals and nursing homes.

  • PDF

Estimation of the Mean CBR for the Subgrade Layer Including the Anti-Frost Layer (동상방지층을 포함한 노상층의 평균 CBR 산정에 관한 연구)

  • Min, Gyeong-Ho;Lee, Cheo-Keun;Heo, Yol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.3 no.1
    • /
    • pp.57-66
    • /
    • 2002
  • Generally, the California Bearing Ratio(CBR) for the material of subgrade is estimated without considering the anti-frost layer into the subgrade layer when pavements are designed. A pavement structure is determined according to the CBR. However, recently the design method taking the anti-frost layer into the subgrade layer is getting prevail. It makes the top of the subgrade layer strengthen and the thickness of the road pavement structure decreased. By the way, some confusion may be caused because theoretically the general equation for the mean CBR to combine the material of the subgrade layer and anti-frost layer have not been developed well. In this paper, laboratory and field CBR tests were performed to estimate of the mean CBR for the subgrade layer including the anti-frost layer. From the basis of the test results, modified equation which is calculating the mean CBR of the subgrade layer has been proposed. Finally, economical efficiency was considered by comparing the pavement thickness with the road pavement design using CBR of the subgrade layer alone and the road pavement design using the mean CBR including the anti-frost layer.

  • PDF

Estimation of Bearing Capacity of Subbase and Subgrade Using Pavement Dynamic Cone Penetrometer (포장동적관입시험기(PDCP)에 의한 보조기층 및 노상 지지력 측정)

  • Roo, Myung-Chan
    • International Journal of Highway Engineering
    • /
    • v.5 no.1 s.15
    • /
    • pp.35-45
    • /
    • 2003
  • This paper presents a theoretical approach for estimation of CBR-value of subbase course and subgrade using a portable pavement dynamic cone penetrometer(PDCP). The PDCP used in this paper was based on a design from South Africa and extensive studies by Kleyn(1982) and more recently by Liveneh and Ishai(1987) and Chua(1988). To date, California Bearing Ratio[CBR] value was studied mainly for application of pavement structural design. This study was initiated to develop a method of obtaining the in situ CBR-values of subbase and subgrade for the structural evaluation of pavements in the swift and inexpensive manner. PDCP tests were implemented at 20 different kinds of soil samples in the lab and test results were analysed by a theoretical approach introduced. The procedure presented provides acceptable and promising results.

  • PDF

Development of Approximate Cost Estimate Model for Aqueduct Bridges Restoration - Focusing on Comparison between Regression Analysis and Case-Based Reasoning - (수로교 개보수를 위한 개략공사비 산정 모델 개발 - 회귀분석과 사례기반추론의 비교를 중심으로 -)

  • Jeon, Geon Yeong;Cho, Jae Yong;Huh, Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1693-1705
    • /
    • 2013
  • To restore old aqueduct in Korea which is a irrigation bridge to supply water in paddy field area, it is needed to estimate approximate costs of restoration because the basic design for estimation of construction costs is often ruled out in current system. In this paper, estimating models of construction costs were developed on the basis of performance data for restoration of RC aqueduct bridges since 2003. The regression analysis (RA) model and case-based reasoning (CBR) model for the estimation of construction costs were developed respectively. Error rate of simple RA model was lower than that of multiple RA model. CBR model using genetic algorithm (GA) has been applied in the estimation of construction costs. In the model three factors like attribute weight, attribute deviation and rank of case similarity were optimized. Especially, error rate of estimated construction costs decreased since limit ranges of the attribute weights were applied. The results showed that error rates between RA model and CBR models were inconsiderable statistically. It is expected that the proposed estimating method of approximate costs of aqueduct restoration will be utilized to support quick decision making in phased rehabilitation project.

Chemical/Biological/Radiological Protective Facility Entering Time Estimation Simulation with Procedure Analysis (화생방 방호시설의 행동 절차 분석을 통한 진입 소요시간 예측 시뮬레이션)

  • Park, Sun Ho;Lee, Hyun-Soo;Park, Moonseo;Kim, Sooyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.40-48
    • /
    • 2014
  • As CBR(Chemical, Biological, and Radiological) attack increases, the importance of CBR protective facilities is being emphasized. When CBR warfare emerges, a task force team, who exist outside of CBR protective facility, should enter the CBR protective facility through neutralizing process in CCA(Contamination Control Area) and TFA(Toxic Free Area). If a bottleneck occurs in the process or zones, the task force team cannot enter the CBR protective facility efficiently and may cause inefficiency in its operation performance or result in casualties. The current design criteria of the CBR protective facility is only limited to ventilation system and it does not consider how much time it takes to enter the facility. Therefore, this research aims to propose the entering time estimation model with discrete event simulation. To make the simulation model, the procedure performed through CCA and TFA is defined and segmented. The actual time of the procedure are measured and adapted for the simulation model. After running the simulation model, variables effecting the entering time are selected for alternatives with adjustments. This entering time estimation model for CBR protective facility is expected to help take time into consideration during the designing phase of CBR protective facility and help CBR protective facility managers to plan facility operation in a more realistic approach.

A Study for 8 Constitution Medicine Diagnosis Expert System Development(2) (8체질 진단을 위한 전문가 시스템 개발에 관한 연구(2))

  • Shin, Yong-Sup;Park, Young-Bae;Park, Young-Jae;Kim, Min-Yong;Lee, Sang-Chul;Oh, Hwan-Sup
    • The Journal of the Society of Korean Medicine Diagnostics
    • /
    • v.12 no.2
    • /
    • pp.107-126
    • /
    • 2008
  • Background : There was seldom study about method that diagnose 8 Constitution beside method of pulse diagnosis in 8 Constitution Medicine. Objectives : This study is to make out 8 Constitution Medicine Diagnosis Expert System Development used CBR(Case based Reasoning). Methods : First, at case base construction process we constructed case base for CBR embodiment because gathering 925 cases all to patient who constitution is verified, and second, at study model establishment process superior expert system development by purpose CBR of reasoning process dividing fundamental type CBR that spend basis data value and expert type CBR that reflect weight in basis data value accordin I II III to advice expert opinion, and third, system embodiment process explained about way to give process and weight that diagnose constitution through Nearest Neighbor Method sampling process of CBR techniques, and fourth, at system estimation process we selected superior CBR model because comparing and estimate the diagnosis rate of expert system with fundamental type system (GECBR) model and expert type I II III CBR system (AVCBR, AACBR, AGCBR) model that reflect expert opinion in fundamental type system. GECBR and AGCBR chose on superior study model. Through such 4 study process, we developed 8 constitution diagnosis expert system lastly. Results : 1. When we select GECBR that is fundamental type by reasoning system, diagnosis rate 78.91% of 8 constitution diagnosis expert system is expected, and the constitution diagnosis rate Hepatonia 90.4%, Cholecystonia 63.0%, Pancreotonia 91.1%, Gastrotonia 0%, Pulmotonia 71.2%, Colonotonia 74.4%, Renotonia 37.5%, Vesicotonia 67.1% expect. 2. When we select AGCBR that is expert type III by reasoning system, diagnosis rate 77.51% of 8 constitution diagnosis expert system is expected, and the constitution diagnosis rate Hepatonia 93.4%, Cholecystonia 58.5%, Pancreotonia 91.1%, Gastrotonia 0%, Pulmotonia 73.1%, Colonotonia 64.4%, Renotonia 41.7%, Vesicotonia 72.2% expect. Conclusion : Based on this study, 8 constitution diagnosis expert system may give help to diagnose 8 constitution, and it is going to utilize as objective estimation tool of 8 constitution diagnosis, and further study for 8 Constitution Medicine Diagnosis Expert System Development used CBR(Case based Reasoning) is needed to supplement this study.

  • PDF

A Study for 8 Constitution Medicine Diagnosis Expert System Development (8체질의학을 위한 진단 전문가 시스템 개발 및 고찰)

  • Shin, Yong-Sup;Park, Young-Bae;Park, Young-Jae;Kim, Min-Yong;Oh, Hwan-Sup
    • The Journal of the Society of Korean Medicine Diagnostics
    • /
    • v.12 no.1
    • /
    • pp.142-184
    • /
    • 2008
  • Background: There was seldom study about method that diagnose 8 Constitution beside method of pulse diagnosis in 8 Constitution Medicine. Objectives: This study is to make out 8 Constitution Medicine Diagnosis Expert System Development used CBR(Case based Reasoning). Methods: First, at case base construction process we constructed case base for CBR embodiment because gathering 925 cases all to patient who constitution is verified, and second, at study model establishment process superior expert system development by purpose CBR of reasoning process dividing fundamental type CBR that spend basis data value and expert type I II III CBR that reflect weight in basis data value according to advice expert opinion, and third, system embodiment process explained about way to give process and weight that diagnose constitution through Nearest Neighbor Method sampling process of CBR techniques, and fourth, at system estimation process we selected superior CBR model because comparing and estimate the diagnosis rate of expert system with fundamental type system (GECBR) model and expert type I II III CBR system (AVCBR, AACBR, AGCBR) model that reflect expert opinion in fundamental type system. GECBR and AGCBR chose on superior study model. Through such 4 study process, we developed 8 constitution diagnosis expert system lastly. Results: 1. When we select GECBR that is fundamental type by reasoning system, diagnosis rate 78.91% of 8 constitution diagnosis expert system is expected, and the constitution diagnosis rate Hepatonia 90.4%, Cholecystonia 63.0%, Pancreotonia 91.1%, Gastrotonia 0%, Pulmotonia 71.2%, Colonotonia 74.4%, Renotonia 37.5%, Vesicotonia 67.1% expect. 2. When we select AGCBR that is expert type III by reasoning system, diagnosis rate 77.51% of 8 constitution diagnosis expert system is expected, and the constitution diagnosis rate Hepatonia 93.4%, Cholecystonia 58.5%, Pancreotonia 91.1%, Gastrotonia 0%, Pulmotonia 73.1%, Colonotonia 64.4%, Renotonia 41.7%, Vesicotonia 72.2% expect. Conclusion: Based on this study, 8 constitution diagnosis expert system may give help to diagnose 8 constitution, and it is going to utilize as objective estimation tool of 8 constitution diagnosis, and further study for 8 Constitution Medicine Diagnosis Expert System Development used CBR(Case based Reasoning) is needed to supplement this study.

  • PDF

SCHEMATIC ESTIMATING MODEL FOR CONSTRUCTION PROJECTS -USING PRICIPLE COMPONENT ANALYSIS AND STRUCTURAL EQUATION METHOD

  • Young-Sil Jo;Hyun-Soo Lee;Moon-Seo Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1223-1230
    • /
    • 2009
  • In the construction industry, Case-Based Reasoning (CBR) is considered to be the most suitable approach and determining the attribute weights is an important CBR problem. In this paper, a method is proposed for determining attribute weights that are calculated with attribute relation. The basic items of consideration were qualitative and quantitative influence factors. These quantitative factors were related to the qualitative factors to develop a Cost Drivers-structural equation model which can be used to estimate construction cost by considering attribute weight. The process of determining the attribute weight-structural equation model consists o 4 phases: selecting the predominant Cost Drivers for the SEM, applying the Cost Driers in the SEM, determining and verifying the attribute weights and deriving the Cost Estimation Equation. This study develops a cost estimating technique that complements the CBR method with a Cost Drivers-structural equation model which can be actively used during the schematic estimating phases of construction.

  • PDF