• Title/Summary/Keyword: Estimating Work Time

Search Result 120, Processing Time 0.022 seconds

Secondary Data Analysis on the Factors Influencing Premenstrual Symptoms of Shift Work Nurses: Focused on the Sleep and Occupational Stress (교대근무 간호사의 월경 전 증상 영향 요인 2차자료 분석: 수면, 직무 스트레스를 중심으로)

  • Baek, Jihyun;Choi-Kwon, Smi
    • Journal of Korean Academy of Nursing
    • /
    • v.50 no.4
    • /
    • pp.631-640
    • /
    • 2020
  • Purpose: This study aimed to examine premenstrual symptoms (PMS) of shift nurses and identify the association between PMS, sleep, and occupational stress. Methods: This study was conducted with a secondary data analysis that used data from the Shift Work Nurse's Health and Turnover study. The participants were 258 nurses who were working in shifts including night shifts. PMS, sleep patterns (sleep time and sleep time variability), sleep quality, and the occupational stress of each participant were measured using the Moos Menstrual Distress Questionnaire, a sleep diary, an actigraph, the Insomnia Severity Index, and the Korean Occupational Stress Scale, respectively. Data were analyzed using SPSS 23 and STATA 15.1 to obtain descriptive statistics, Pearson's correlation coefficients, multiple linear regression with generalized estimating equations (GEE) and Baron and Kenny's mediating analysis. Results: The average PMS score, average sleep time, average sleep time variability, average sleep quality score, and average occupational stress score of the participants was 53.95 ± 40.45, 7.52 ± 0.89 hours, 32.84 ± 8.43%, 12.34 ± 5.95, and 49.89 ± 8.98, respectively. A multiple linear regression analysis with GEE indicated that sleep time variability (B = 0.86, p = .001), and sleep quality (B = 2.36, p < .001) had negative effects on nurses' PMS. We also found that sleep quality had a complete mediating effect in the relationship between occupational stress and PMS. Conclusion: These findings indicate that both sleep time variability and sleep quality are important factors associated with PMS among shift work nurses. To improve shift nurses' PMS status, strategies are urgently needed to decrease sleep time variability and increase sleep quality.

Optimal Design of Process-Inventory Network Considering Late Delivery Costs (재고부족 비용을 고려한 공정-저장조 망구조의 최적설계)

  • Suh, Kuen-Hack;Yi, Gyeong-Beom
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.16 no.5
    • /
    • pp.476-480
    • /
    • 2010
  • This study deals with stockout costs in the supply chain optimization model under the framework of batch-storage network. Stockout is very popular in chemical industries. Estimating stockout cost involves an understanding of customer reactions to a seller being out of stock at the time the customer wants to buy an item. This involves massively non-trivial work such as direct customer interviews and extensive mail survey. In this study, we will introduce a new interpretation of stockout costs combined with batchstorage network optimization model and thus suggest an easy way of estimating stockout costs. Optimization model suggest that optimal process and storage sizes considering stockout cost are smaller than those that do not consider stockout cost. An illustrative example support the analytical results.

Development and Evaluation of High-precision Earth-work Calculating System using Drone Survey (드론을 활용한 고정밀 토공량 산출 시스템 개발 및 평가)

  • Kim, Sewon;Kim, YoungSeok
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.4
    • /
    • pp.87-95
    • /
    • 2019
  • Earth-work calculation is the important data for estimating the optimal construction cost at the construction site. Earth-work calculations require the accurate terrain data and precise soil volume calculations. Drone surveying technology provides accurate topography in a short time and economic advantages. In this paper, a drone surveying technique was used to derive a high precision soil volume calculation system. Field demonstration were performed to verify the accuracy of the volume measurement system. The results of earth-work calculation using drone survey were compared with those of GPS surveying. In addition, the developed earth-work volume calculation algorithm is compared with the existing aerial survey software (Pix4D) to verify the accuracy.

Identifying Lensed Quasars and measuring their Time-Delays in Unresolved Systems

  • Bag, Satadru
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.46 no.2
    • /
    • pp.44.2-44.2
    • /
    • 2021
  • Detecting lensed quasar systems and estimating their time delays using the unresolved joint light curves can be the next frontier among the cosmological probes in the near future. One can get the independent measurement of the Hubble constant from the time delays but without requiring the systems to be resolved a priori followed by monitoring the image light curves using high-resolution telescopes for years. In this work, we propose a novel technique that can identify lensed quasars only using the observed unresolved light curves and without assuming a template or any prior information. Following a set of conservative selection criteria that gives zero false-positive outcome, we can accurately estimate the time delay for almost all the lensed systems with marginal noise in the data. For the case of noisy data, our approach can still correctly identify a substantial number of lensed systems with high certainty and measure the time delay accurately.

  • PDF

Field Investigation Work Modeling on Defect Inspecting Step of Defect Consulting in Apartment Building of Korea (공동주택 하자감정을 위한 하자조사단계의 현장조사 업무 모델링)

  • Park, Jun-Mo;Seo, Deok-Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.87-88
    • /
    • 2015
  • A defect dispute surrounding an apartment building is in constant trouble, a defect consulting is necessary that objective and impartial for solving a defect. The defect dispute about a defect lawsuit is conducted in the order that filling of lawsuit, consulting order, defect inspecting, estimating a repairing cost, writing a consulting report, submitting a consulting report, and decision by court. Of these, a step of defect inspecting is extensively investigated an occurred defect that each defect index and type from each part and place. At this time, it is collected of many data and created many information. For this, it need to organize and manage. The study is a modeling of field investigation work process that second phase of defect inspecting step. A literature study is defined a work until level 2. This study is defined the work until level 3 to 4. In addition, the modeling can do for using a job name, a place to job, a job to do, and a person concerned about defect consulting case. The modeling is expected a contribution of improving a defect consulting process and systematizing a judgment standard.

  • PDF

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

Prediction of the Probability of Customer Attrition by Using Cox Regression

  • Kang, Hyuncheol;Han, Sang-Tae
    • Communications for Statistical Applications and Methods
    • /
    • v.11 no.2
    • /
    • pp.227-233
    • /
    • 2004
  • This paper presents our work on constructing a model that is intended to predict the probability of attrition at specified points in time among customers of an insurance company. There are some difficulties in building a data-based model because a data set may contain possibly censored observations. In an effort to avoid such kind of problem, we performed logistic regression over specified time intervals while using explanatory variables to construct the proposed model. Then, we developed a Cox-type regression model for estimating the probability of attrition over a specified period of time using time-dependent explanatory variables subject to changes in value over the course of the observations.

Development of Cost Data Prototype based on Production Crew by Productivity Analysis of Form Work (거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype 개발에 관한 연구)

  • Kang, Dong-Wan;Ji, Soung-Min;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.44-52
    • /
    • 2012
  • In the cost management of public construction projects, it is an important issue to develop an adequate cost data for estimating the predetermined amount by various methods. For a long time, a standard of estimation in korea is used as a basis for estimating the predetermined amount of public construction. However, they did not have a reasonable cost data based on a labor and equipment productivity analysis. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for more accurate cost data to use in an early phase. This study analyzed the productivity of form work by the CYCLONE model, and presented the model on the number of optimal labor through sensitivity analysis. This CYCLONE model can be useful in analyzing productivity on the various sizes of form. Also, the regression model to estimate the daily output can be used in predicting the amount of labor. Considering the work duration in the regression model is expected to make the daily output estimation much more accurate.

The estimating method of construction workable-quantity per unit time - Focused on Pump-Dredge - (건설기계 시간당작업량(Q) 산정 개선방안 -펌프준설선 작업효율(E)을 중심으로-)

  • Ahn, Bang-Ryul;Tae, Yong-Ho;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.125-133
    • /
    • 2010
  • Although work-efficiency of construction machinery is a critical factor for estimating its workable-quantity perunit time, the efficiency figure table presented in the Poom-Sam that is used for Construction Cost Estimation of public sectors in Korea is very subjective for practical usage. In order to suggest objective work-efficiency table for a Pump-Dredger, domestic and overseas documentary records were investigated and on-going construction sites were also visited. Moreover, actual work quantities collected from the site visits were compared with the ones calculated based on the Standard Measurement Methods used in Japan. The research found that the table can be revised by means of detailing down by several factors, namely project type, depth of soil, undersea-site shape, and condition on the sea for better estimation of its workable-quantity. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

Investigations on state estimation of smart structure systems

  • Arunshankar, J.
    • Smart Structures and Systems
    • /
    • v.25 no.1
    • /
    • pp.37-45
    • /
    • 2020
  • This paper aims at enlightening the properties, computational and implementation issues related to Kalman filter based state estimation algorithms and sliding mode observers, by applying them for estimating the states of a smart structure system. The Kalman based estimators considered in this work are Kalman filter and information filter and, the sliding mode observers considered are Utkin observer and higher order sliding mode observer. A fourth order linear time invariant model of a piezo actuated beam is used in this work. This structure is embedded with four number of piezo patches, of which two act as sensors, one as disturbance actuator and the other as control actuator. The performance of the state estimation algorithms is evaluated through simulation, for the first two vibrating modes of the piezo actuated structure, when the structure is maintained at first mode and second mode resonance.