Journal of the military operations research society of Korea
/
v.27
no.1
/
pp.10-27
/
2001
This paper deals with the application of PRICE model in estimating the proper acquisition cost for weapon budgeting phase. The PRICE(Parametric Review of Information for Costing and Evaluation) Hardware model is a computerized method for deriving cost estimates of electronic and mechanical hardware assemblies and systems. The model can be used in obtaining not only initial cost estimates in conceptual phase, but also detailed cost estimates in budgeting phase depending on available historical and empirical data. We analyzed first step cost estimate parameters and derived cost equations using PRICe output dta. Using weight and complexity, We can find cost variation. Sensitivity analysis shows that cost increases exponentially as complexity increases exponentially as complexity increases. We estimated KAAV\`s (Korea Amphibious Assault Vehicle) production cost using the PRICE model and compare with engineering cost estimates which is based on actual production data submitted by the production company. The result shows that tow estimates are close within $\pm2%$ differences.
One of the characteristics of a good construction is efficiently to use material and manpower related in the construction. From the preplanning stage to the completion one, a program planner must sufficiently consider the whole field of construction in terms of cost. The estimating account books were written and left in the Construction of the Kyongwoon Palace reconstructed in the beginning of 20th century. Trough those books and other related documents, this paper has been concentrated on the estimated, executed cost of woodwork in those days.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.11
/
pp.7-13
/
2013
There has been a need for the systematic evaluation of the economic efficiency between conventional fluorescent lamp lighting systems that have been used in tunnels and LED lighting systems. This study has evaluated basic tunnel lighting between the conventional fluorescent lighting systems and the LED lighting system using the evaluation tool of tunnel lighting by Life Cycle Cost (LCC) and using the economic efficiency evaluation method. In addition, the unit discount rate of the LED lighting system and the estimated increase in the price of electricity have made the estimated cost of LCC the same if two luminaires were used in the basic part of the tunnel.
In this paper, an adaptive generalized predictive control(GPC) algorithm which minimizes a N-stage cost function is proposed. The resulting controller is based on GPC algorithm and can be used in unknown plant parameters as the parameters of one step ahead predictor are estimated by recursive least squares method. The estimated parameters are extended to G,P, and F amtrix which contain the parameters of N step ahead predictors. And the minimization of cost function assuming no constraints on future controls results in the projected control increment vector. Hence this adaptive GPC algorithm can be used for either unknown system or varing system parameters, and it is also shown through simulations that the algorithm is robust to the variation of system parameters. This adaptive GPC scheme is shown to have the same stability properties as the deterministic GPC, and requires small amount of calculation compared to other adaptive algorithms which minimize N-stage cost function. Especially, in case that the maximum output horizon is 1, the proposed algorithm can be applicable to direct adaptive GPC.
This study was conducted to assess the amount of nursing services for psychiatric inpatients and to estimate psychiatric nursing costs by using the RBRVS. Full details of medical services, including physician and nursing services, for psychiatric inpatients were surveyed and data of general characteristics of hospitals and patients were also collected. The cost of nursing activities was estimated by the multiple conversion factor which was drawn from the Korean RBRVS Development Project to the RBRVS score of each nursing activities, which was drawn from the results of Korean Nurses Association (KNA)'s projects about nursing RBRVS development and cost of nursing activities. The data about 89 inpatients from 3 general hospitals with psychiatric departments were analyzed. The total cost of nursing activities for each patient per admission day was from KRW 22,185 to KRW 27,954 by hospital, and KRW 25,220 in average. The percent of nursing cost to the total cost of medical services was from 36% to 48% by characteristics of patients and 41.4% in average. The cost of nursing activities estimated in this study was between the existing NHI fee schedule and the one suggested by KNA. It is considered as appropriate and acceptable level compared to the total amount of medical services. In the process of KNA's activities to get nursing fee in NHI fee schedule, results of additional studies to estimate the cost of nursing activities balanced with total cost of medical services in every departments should be found and utilized.
Background: Apart from reducing occupational exposure to cytotoxic hazards, the PhaSeal(R) closed-system transfer device (CSTD) can extend the beyond-use dates (BUDs) of unfinished vials of antineoplastic drugs for up to 168 hours (seven days). In this study, the total material cost incurred by its use in a Malaysian government-funded hospital was calculated. Methods: A list of vial stability following initial needle punctures of 29 commonly-used antineoplastic drugs was compiled. The amount of the materials used, including drugs, infusion bottles, the PhaSeal(R) CSTD and other consumables, was recorded on a daily basis for three months in 2015. The total cost was calculated based on the actual acquisition costs, and was compared with that of a hypothetical scenario, whereby conventional syringe-needle sets were used for the same amounts of preparations. Results: The use of the PhaSeal(R) CSTD incurred a cost of MYR 383,634.52 (USD 92,072.28) in three months, representing an average of MYR 170.5 (USD 40.92) per preparation or an estimated annual cost of MYR 1,534,538.08 (USD 368,289.14). Compared with conventional syringe-needle approach, it is estimated to lead to an additional spending of MYR 148,627.68 (USD 35,670.64) yearly. Conclusion: Although there was a reduction of drug wastage achieved by extending BUDs of unfinished vials using the PhaSeal(R) CSTD, cost saving was not observed, likely attributable to the wide use of lower-priced generic drugs in Malaysia. Future studies should further evaluate the possibility of cost saving, especially in health settings where branded and high-cost antineoplastic drugs are more commonly used.
Journal of the military operations research society of Korea
/
v.28
no.1
/
pp.97-114
/
2002
An estimation of economic life for a new weapon system is a critical issue in aquisition process. In general a life cycle cost consists of, development cost, aquisition cost, and maintenance cost. These costs are not identified and obtained in the beginning of the aquisition process. This paper deals with an economic life for KlAl tank which is being deployed recently, using PRICE model. In order to estimate an KlAl economic life, we use equivalent annual cost method which is sum of capital recovering with return and equivalent O&M cost method. This method determines an economic life by minimizing annual investment cost and operation and maintenance cost. In this paper, an aquisition cost of KlAl is obtained from PRICE H and O&M cost from PRICE HL model. We obtained various results depending upon production quantity. An economic life for KlAl is estimated 18 years when 300 tanks are produced.
Although occupational low back pain accounts for $20\sim40%$ of all occupational illness and injury, there are limited numbers of studies regarding the effectiveness of back school program. The objective of this study was to evaluate the economic benefit of back school program for early return to work of occupational low back pain patients in the current occupational injury compensation and management system. The cost-benefit analysis in this study was conducted to evaluate the relative magnitude of benefit to cost. The total cost was estimated by calculating the value of components in back school program according to governmental budget protocol. The back school program was consisted of three major approaches, pain center, work-hardening program and funcional restoration program and each of components had various facilities and experts. The total amount of cost was estimated as 250,866,220 won per year. The most promising type of back school program were quite intensive (a 3 to 5-week stay in a specialized center), therefore, if we adopted the 5-week stay course, 10 courses could be held in a year. Following to the medical act, 20 patients per doctor could participate in a each course, ie, total 200 patients in a year. As a result, we could estimate the cost of 1,254,331 won a patient. We estimated the benefit by using data of a few local labor offices about average medical treatment beneficiary and off-duty beneficiary of 46 occupational low back pain patients in 1994. Ullman and Larsson (1977) mentioned that the group of chronic low back pain patients who participated in back school program needed less time to recover by 48.4% of beneficiary duration. And in the trying to estimate the benefit, we asked 10 rehabilitation board certificate doctors about reduction proportion of treatment cost by introducing back school program. The answered reduction proportions were in the range of $30\sim45%$, average 39%. As a final result, we could see that the introduction of back school program in treatment of chronic occupational low back pain patients could produce the benefit to cost ratio as 3.90 and 6.28. And we could conclude that the introduction of back school program was beneficial to current occupational injury compensation and management system.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
1999.10c
/
pp.359-364
/
1999
Providing the reasonable construction cost at the initial stage of the rural development project, is a kety factor of the each step of project , such as propriety analysis , cost planning , design, and planning the progress of work. The explainable construction cost can be estimated at the early stage using the actual cost data by statistical analysis. In this study, the influence factors are extracted by factor analysis with the actual cost data of rural development project, object cost model is developed by multiple regression analysis, and verify the developed cost model by Monte-Carlo simulation .
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.31
no.1
/
pp.79-87
/
2013
This study proposed a method to analyze the economic benefit of the national map revision program using the replacement cost method. The replacement cost method measures the benefit of a project as the minimum cost to replace functions of the project with those of alternative goods or services in an existing market. Thus, the demands on 1/5,000 topographic map revision in 18 administrative tasks such as city and district management planning were surveyed in three local autonomous entities. Then the cost to alternatively fulfill the demands was estimated with the standard construction estimating system for the field surveying and surveying results in commercial GIS companies for the site investigation. With this cost estimation model, the benefit of the current national map revision program to the local autonomous entities was estimated as 265,960,999 won. And cost benefit ratios according to several revision frequencies from 0.5 to 4 year were also compared to find the optimal frequency.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.