Development of Deep Learning Based Deterioration Prediction Model for the Maintenance Planning of Highway Pavement (도로포장의 유지관리 계획 수립을 위한 딥러닝 기반 열화 예측 모델 개발)

  • Lee, Yongjun;Sun, Jongwan;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.34-43
    • /
    • 2019
  • The maintenance cost for road pavement is gradually increasing due to the continuous increase in road extension as well as increase in the number of old routes that have passed the public period. As a result, there is a need for a method of minimizing costs through preventative grievance preventive maintenance requires the establishment of a strategic plan through accurate prediction of road pavement. Hence, In this study, the deep neural network(DNN) and the recurrent neural network(RNN) were used in order to develop the expressway pavement damage prediction model. A superior model among these two network models was then suggested by comparing and analyzing their performance. In order to solve the RNN's vanishing gradient problem, the LSTM (Long short-term memory) circuits which are a more complicated form of the RNN structure were used. The learning result showed that the RMSE value of the RNN-LSTM model was 0.102 which was lower than the RMSE value of the DNN model, indicating that the performance of the RNN-LSTM model was superior. In addition, high accuracy of the RNN-LSTM model was verified through the comparison between the estimated average road pavement condition and the actually measured road pavement condition of the target section over time.

3D Architecture Modeling and Quantity Estimation using SketchUp (스케치업을 활용한 3D 건축모델링 및 물량산출)

  • Kim, Min Gyu;Um, Dae Yong
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.7 no.6
    • /
    • pp.701-708
    • /
    • 2017
  • The construction cost is estimated based on the drawings at the design stage and constructor will find efficient construction methods for budgeting and budgeting appropriate to the budget. Accurate quantity estimation and budgeting are critical to determining whether the project is profitable or not. However, since this process is mostly performed depending on manpower or 2D drawings, errors are likely to occur and The BIM(Build Information Modeling) program, which can be automated, is very expensive and difficult to apply in the field. In this study, 3D architectural modeling was performed using SketchUp which is a 3D modeling software and suggest a methodology for Quantity Estimation. As a result, 3D modeling was performed effectively using 2D drawings of buildings. Based on the modeling results, it was possible to calculate the difference of the quantity estimation by 2D drawing and 3D modeling. The research suggests that the 3D modeling using the SketchUp and the calculation of the quantity can prevent the error of the conventional 2D calculation method. If the applicability of the research method is verified through continuous research, it will contribute to increase the efficiency of architectural modeling and quantity Estimation work.

The Actual Conditions and Improvement of the Eco-Forests Mater Plan, South Korea (우리나라 생태숲조성 기본계획 실태 및 개선방향)

  • Heo, Jae-Yong;Kim, Do-Gyun;Jeong, Jeong-Chae;Lee, Jeong
    • Korean Journal of Environment and Ecology
    • /
    • v.24 no.3
    • /
    • pp.235-248
    • /
    • 2010
  • This study was carried out to the actual conditions and improvement of the eco-forests master plan in South Korea, and suggested its problems and improvement direction. Results from survey and analysis of limiting factors or constraints in the construction plans of eco-forests in Korea revealed that there were highly frequent problems involving site feasibility, topographic aspect, and existing vegetation. The results of survey on the status of land use indicated that the average ratio of the use of private estate was 29.7%, so then it was estimated that a great amount of investment in purchase of eco-forest site would be required. Results from survey on major introduced facilities showed that there was high frequency of introduction of infrastructure, building facility, recreational facility, convenience facility, and information facility, and that there was low frequency of introduction of plant culture system, ecological facility, structural symbol and sculpture, and the likes. There was just one eco-forest park where more than 500 species of plants grew, and the result of investigation indicated that the diversity of plant species in 11 eco-forest parks was lower than the standards for construction of eco-forest. Results from analysis of the projects costs revealed that investment cost in facilities was higher than planting costs, and that a large amount of investment was made in the initial stage of the project. There was no planned budget for the purpose of cultivating and maintaining the plants and vegetation after construction of eco-forest. The basic concepts in construction of eco-forests were established according to the guidelines presented by the Korea Forest Service; however, the detailed work of the project was planned with its user-oriented approach. Then the construction of eco-forest was being planned following the directions, which would lead to development of a plant garden similar to arboretum or botanical garden. Therefore, it is required that the architect who designs eco-forest as well as the public officer concerned firmly establish the concepts of eco-forest, and that, through close analysis of development conditions, a candidate site to fit the purpose of constructing eco-forest be selected, and also a substantive management plan be established upon completion of construction of eco-forest.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

Characteristics of the construction process, the history of use and performed rituals of Gyeongungung Heungdeokjeon (경운궁 흥덕전의 조영 및 사용 연혁과 설행된 의례의 특징)

  • LIM, Cholong;JOO, Sanghun
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.1
    • /
    • pp.281-304
    • /
    • 2022
  • Heungdeokjeon was the first pavilion built on the site of Sueocheong during the expansion of Gyeongungung. In this study, we tried to clarify the specific construction process of Heungdeokjeon, which was used for various purposes such as the copy location for Portraits of ancestors, temporary enshrinement site, and the funeral building for the rest of the body, which is Binjeon. In addition, we tried to confirm the historical value based on the characteristics derived by the history of the building and the rituals performed. Heungdeokjeon began to be built in the second half of 1899, and is estimated to have been completed between mid-February and mid-March 1900. It was a ritual facility equipped with waiting rooms for the emperor and royal ladies as an annex. The relocation work was planned in April 1901 and began in earnest after June, and it was closely linked to the construction of attached buildings of Seonwonjeon. In addition, comparing the records on the construction and relocation cost of Heungdeokjeon with those related to the reconstruction of Seonwonjeon, it was confirmed that annex buildings of Heungdeokjeon were relocated and used as annex buildings of Seonwonjeon. The characteristics identified in the process of Heungdeokjeon used as a place to copy portraits are as follows. First, it was used as a place to copy portraits twice in a short period of time. Second, it was the place where the first unprecedented works were carried out in relation to the copying of portraits. Third, the pavilion, which was specially built for imperial rituals, was used as a place to copy portraits. Since then, it has been used as a funeral building for the rest of the body, and features different from those of the previous period are identified. It was the building dedicated to rituals for use as Binjeon, and was also a multipurpose building for copying portraits. In other words, Heungdeokjeon, along with Gyeongbokgung Taewonjeon, is the building that shows the changes in the operation of Binjeon in the late Joseon Dynasty. Characteristics are also confirmed in portrait-related rituals performed at Heungdeokjeon. The first is that Jakheonlye was practiced frequently in a short period of time. The second is that the ancestral rites of Sokjeolje and Bunhyang in Sakmangil, which are mainly held in the provincial Jinjeon, were identified. This is a very rare case in Jinjeon of the palace. The last is that Jeonbae, jeonal, and Bongsim were implemented mutiple times. In conclusion, Heungdeokjeon can be said to be a very symbolic building that shows the intention of Gojong, who valued imperial rituals, and the characteristics of the reconstruction process of Gyeongungung.

Prestressing Loss Management for PSC Girder Tendon Based on EM Sensing (EM센서를 활용한 PSC 텐던 긴장력 손실 관리)

  • Kim, Junkyeong;Park, Jooyoung;Zhang, Aoqi;Lee, Hwanwoo;Park, Seunghee
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.28 no.4
    • /
    • pp.369-374
    • /
    • 2015
  • In this paper, an EM sensing based prestressing force estimation method is proposed, in which it can estimate tensile force of PS tendon for PSC girder. The PSC girder has more improved performance than the general concrete girder by introducing the prestressing to the concrete. Thus the PSC girder bridge is widely constructed due to its high performance and low cost. However, the prestressing force has not been managed nevertheless it is major factor for the maintenance of the PSC girder bridge. The prestressing force was just measured during construction using jacking device and after that, it can not be managed. For this reason, this paper proposes a tensile force estimation method of PS tendon based on EM sensor. The permeability of ferroelectric material is changed according to the induced stress to the material, in which it can be measured using EM sensor. To measure the permeability of PS tendon, the EM sensor was fabricated and verified by performing the MTS test. The test was performed using 7-wire steel tendon under the 0, 40, 80, 120, 160, 200 KN of tensile force. The permeability of PS tendon was gradually decreased according to the increasement of tensile force. The regression method was used to find the relation between permeability and stress. As a result, the permeability has linear relation with the tensile force of PS tendon and the pre-stressing force can be estimated by the derived estimation equation.

Traffic Demand Forecasting Method for LCCA of Pavement Section (도로포장의 생애주기비용 분석을 위한 장기 교통수요 추정)

  • Do, Myungsik;Kim, Yoonsik;Lee, Sang Hyuk;Han, Daeseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2057-2067
    • /
    • 2013
  • Traffic demand forecasting for pavement management in the present can be estimated using the past trends or subjective judgement of experts instead of objective methods. Also future road plans and local development plans of a target region, for example new road constructions and detour plans cannot be considered for the estimate of future traffic demands. This study, which is the fundamental research for developing objective and accurate decision-making support system of maintenance management for the national highway, proposed the methodology to predict future traffic demands according to 4-step traffic forecasting method using EMME in order to examine significance of future traffic demands affecting pavement deterioration trends and compare existing traffic demand forecasting methods. For the case study, this study conducted the comparison of traffic demand forecasting methods targeting Daejeon Regional Construction and Management Administration. Therefore, this study figured out that the differences of traffic demands and the level of agent costs as well as user costs between existing traffic demand forecasting methods and proposed traffic demand forecasting method with considering future road plans and local development plan.

Comparative risk analysis of NATM and TBM for mixed-face large-diameter urban tunneling (도심지 대단면 복합지반 NATM 과 TBM 터널공법의 비교위험도 분석)

  • Kim, Young-Geun;Moon, Joon-Shik;Shim, Jai-Beom;Lee, Seung-Bok;Choi, Chang-Rim;Chun, Youn-Chul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.1
    • /
    • pp.19-32
    • /
    • 2011
  • The risk assessment is essential for tunnel design in order to minimize risks associated with uncertainty about geological conditions and tunneling method. This paper provides a comparative risk analysis of a large single bore TBM driven tunnel against sequentially excavated NATM tunnel for a mixed-face large-diameter urban tunnel project near or under a river. The focus of this assessment is on the risks associated with the tunnel excavation methods, in particular whether a TBM or NATM presents more or less risk to achieve the planned excavation duration and bring the project within the estimated bid price. First, the impacts and risks to tunnel construction under each method were discussed, and the risks were scored and ranked in the order of perceived severity and likelihood. Finally, the assessment from a risk based perspective was conducted to decide which alternate tunneling method is more likely to deliver the project with the least time and cost. It is very important to note that this study is only applied to this tunnel project with specific geological conditions and other contract requirements.

Calibration of a Network Link Travel Cost Function with the Harmony Search Algorithm (화음탐색법을 이용한 교통망 링크 통행비용함수 정산기법 개발)

  • Kim, Hyun Myung;Hwang, Yong Hwan;Yang, In Chul
    • Journal of Korean Society of Transportation
    • /
    • v.30 no.5
    • /
    • pp.71-82
    • /
    • 2012
  • Some previous studies adopted a method statistically based on the observed traffic volumes and travel times to estimate the parameters. Others tried to find an optimal set of parameters to minimize the gap between the observed and estimated traffic volumes using, for instance, a combined optimization model with a traffic assignment model. The latter is frequently used in a large-scale network that has a capability to find a set of optimal parameter values, but its appropriateness has never been demonstrated. Thus, we developed a methodology to estimate a set of parameter values of BPR(Bureau of Public Road) function using Harmony Search (HS) method. HS was developed in early 2000, and is a global search method proven to be superior to other global search methods (e.g. Genetic Algorithm or Tabu search). However, it has rarely been adopted in transportation research arena yet. The HS based transportation network calibration algorithm developed in this study is tested using a grid network, and its outcomes are compared to those from incremental method (Incre) and Golden Section (GS) method. It is found that the HS algorithm outperforms Incre and GS for copying the given observed link traffic counts, and it is also pointed out that the popular optimal network calibration techniques based on an objective function of traffic volume replication are lacking the capability to find appropriate free flow travel speed and ${\alpha}$ value.

Application of High-Performance Steels to Enhance the Punching Shear Capacity of Two-Way Slabs (2방향 슬래브의 펀칭전단성능 향상을 위한 고성능 철근의 적용)

  • Yang, Jun Mo;Shin, Hyun Oh;Lee, Joo Ha;Yoon, Young Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.2
    • /
    • pp.161-169
    • /
    • 2011
  • Two-way slabs reinforced with high-performance steels, which have several practical advantages of a reduction of congestion in heavily reinforced members, savings in the cost of labor and repair, the higher corrosion resistance, and a reduction of construction time, were constructed and tested. The influences of the flexural reinforcement ratio, concentrating the reinforcement in the immediate column region, and using steel fiber-reinforced concrete (SFRC) in the slab on the punching shear resistance and post-cracking stiffness were investigated, and compared with the punching shear test results of the slabs reinforced with conventional steels and GFRP bars. In addition, the strain distribution of flexural reinforcements and crack control were investigated, and the effective width calculating method for the average flexural reinforcement ratio was estimated. The use of high-performance steel reinforcement increased the punching shear strength of slabs, and decreased the amount of flexural reinforcements. The concentrating the top mat of flexural reinforcement increased the post-cracking stiffness, and showed better strain distribution and crack control. In addition, the use of SFRC showed beneficial effects on the punching shear strength and crack control. It was suggest that the effective width should be changed to larger than 2 times the slab thickness from the column faces.