• Title/Summary/Keyword: Estimated Construction Cost

Search Result 308, Processing Time 0.024 seconds

Cost-Effectiveness Analysis of Low-Impact Development Facilities to Improve Hydrologic Cycle and Water Quality in Urban Watershed (도시유역의 물순환 및 수질 개선을 위한 저영향개발 시설의 비용 효율 분석)

  • Choi, Jeonghyeon;Kim, Kyungmin;Sim, Inkyeong;Lee, Okjeong;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.3
    • /
    • pp.206-219
    • /
    • 2020
  • As urbanization and impermeable areas have increased, stormwater and non-point pollutants entering the stream have increased. Additionally, in the case of the old town comprising a combined sewer pipe system, there is a problem of stream water pollution caused by the combined sewer overflow. To resolve this problem, many cities globally are pursuing an environmentally friendly low impact development strategy that can infiltrate, evaporate, and store rainwater. This study analyzed the expected effects and efficiency when the LID facility was installed as a measure to improve hydrologic cycle and water quality in the Oncheon stream in Busan. The EPA-SWMM, previously calibrated for hydrological and water quality parameters, was used, and standard parameters of the LID facilities supported by the EPA-SWMM were set. Benchmarking the green infrastructure plan in New York City, USA, has created various installation scenarios for the LID facilities in the Oncheon stream drainage area. The installation and maintenance cost of the LID facility for scenarios were estimated, and the effect of each LID facility was analyzed through a long-term EPA-SWMM simulation. Among the applied LID facilities, the infiltration trench showed the best effect, and the bio-retention cell and permeable pavement system followed. Conversely, in terms of cost-efficiency, the permeable pavement systems showed the best efficiency, followed by the infiltration trenches and bio-retention cells.

A Study on the Construction of 3D Noisemap for Busan's Road Traffic Noise (부산시 도로교통소음의 3차원 소음지도제작에 관한 연구)

  • Kim, Hwa-Il;Han, Kyoung-Min
    • Journal of Environmental Policy
    • /
    • v.6 no.1
    • /
    • pp.111-132
    • /
    • 2007
  • The traffic noise of Busan, the second largest city in Korea, is polluting the area. Noise map is a map that shows data on an existing or predicted noise condition in terms of a noise indicator, breaches of a limit value, the number of dwellings exposed to certain values of a noise indicator in a certain area, or on cost-benefit ratios or other economic data on mitigation methods or scenarios with Geographic Information System. With noise map, the effect of traffic noise and the efficiency of city development plan are exactly estimated. So making systematic counteroffer is possible with it. This study is aimed to the construction of basis for noise map construction method for domestic use and the area focus is Busan.

  • PDF

A Study for cost of road traffic accident taken offender's PTSD in consideration (교통사고 가해자의 외상 후 스트레스 장애를 고려한 도로교통사고 비용 연구)

  • Jang, Seok-Yong;Jeong, Heon-Yeong;Go, Sang-Seon
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.5
    • /
    • pp.17-29
    • /
    • 2010
  • The main objective of this study is to consider the necessity of introducing owner expenses in estimating the cost of traffic accidents, as is done in some advanced countries. It is known as "owner cost" in the U.S, "enterprise project price" in Japan, and "human cost" in the U.K. To achieve this, the seriousness and present state of post-traumatic stress disorder (PTSD) of traffic accident offenders, which is generally not observed when traffic accidents occur, are evaluated; countermeasures reflecting personal characteristics are prepared according to degree of affliction. The results could be summarized as follows. First, the present condition and seriousness of PTSD from traffic accidents that has been estimated only within the accidents offenders are evaluated through a survey. Second, a distinction analysis model is developed. 'Insomnia caused by accidents' and 'mental daunting in accident situations or similar ones during driving' are chosen as the variables of the discriminant. Third, as a result of the construction of an Ordered Probit Model to comprehend the seriousness of PTSD, the variables turns out in the order of 'seriousness of the most damaged victim, 'nightmare about the accident', 'insomnia experience', 'mental daunting during driving', 'gender', and 'major driving area'. Finally, the cures reflecting characteristics of gender and region are suggested, which are preferred for degree of seriousness of PTSD. The analysis shows that the method to minimize the damage, such as decline of work efficiency, by moving ahead the rehabilitation of the offenders would be suggested and this could minimize the direct and indirect damages that could happen to business owners for whom the drivers work.

A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects (건설공사 사후평가 전문기관 설치 필요성 연구)

  • Lee, Du-Heon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.285-295
    • /
    • 2016
  • The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.

Micro-Hydropower System with a Semi-Kaplan Turbine for Sewage Treatment Plant Application: Kiheung Respia Case Study (하수처리장 적용을 위한 Semi-카플란 수차가 장착된 마이크로수력발전 시스템: 기흥레스피아 사례)

  • Chae, Kyu-Jung;Kim, Dong-Soo;Cheon, Kyung-Ho;Kim, Won-Kyoung;Kim, Jung-Yeon;Lee, Chul-Hyung;Park, Wan-Soon
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.5
    • /
    • pp.363-370
    • /
    • 2013
  • Small scale hydropower is one of most attractive and cost-effective energy technologies for installation within sewage treatment plants. This study was conducted to evaluate the potential of a semi-kaplan micro-hydropower (MHP) system for application to sewage treatment plants with high flow fluctuations and a low head. The semi-kaplan MHP is equipped with an adjustable runner blade, and is without a guide vane, so as to reduce the incidence of mechanical problems. A MHP rating 13.4 kWp with a semi-kaplan turbine has been considered for Kiheung Respia sewage treatment plant, and this installation is estimated to generate 86.8 MWh of electricity annually, which is enough to supply electricity to over 25 households, and equivalent to an annual reduction of 49 ton $CO_2$. The semi-kaplan turbine showed a 90.2% energy conversion efficiency at the design flow rate of 0.35 $m^3/s$ and net head of 4.7 m, and was adaptable to a wide range of flow fluctuations. Through the MHP operation, approximately 2.1% of total electricity demand of Kiheung Respia sewage treatment plant will be achievable. Based on financial analysis, an exploiting MHP is considered economically acceptable with an internal rate of return of 6.1%, net present value of 15,539,000 Korean Won, benefit-cost ratio of 1.08, and payback year of 15.5, respectively, if initial investment cost is 200,000,000 Korean Won.

Economic Analysis of Dam Operation Improvement by Dam Downstream River Improvement Works (II)-Economic Benefit and Cost Allocation Analysis (댐하류하천정비사업의 댐 운영개선 효과 경제성 분석 (II) -경제적 편익 및 비용분담률 분석)

  • Yoo, Seung-Hoon;Lee, Gwang-Man;Lee, Eul-Rae
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.9
    • /
    • pp.765-776
    • /
    • 2011
  • Flood discharge capacity in a dam downstream reach has been decreased after dam construction because of the river cross section reduction impacted by farm lands, sand-bars and parking lots, etc. in river flood plains. Those obstacles being in the river inside areas have caused negative influences to the dam operation policy. Therefore, the dam downstream river improvement work associated with the dam operation improvement plan is under construction for removing reduction factors on the dam effective storage, assuring flood safety in the dam downstream river and incrementing dam operation benefits. But the project has issued some problems such as project feasibility, economic evaluation, cost allocation and benefit share, etc. Since a dam enterpriser has not committed such kind of project before, it is necessary to set up an objective analysis process and a quantitative financial valuation. This study examines the measurable economic benefits and the cost allocation of the project for the fairness between benefit owners (central government and water electricity enterprisers). As a result, the total economic benefit from 3 dams (Imha, Daechung and Youngdam Dam) accounts for 14.41 Billion Won/year. The financial valuation of K-water as a project enterpriser is approximately estimated at 40% of the total value and the government is 60%.

Simulation-Based Stochastic Markup Estimation System $(S^2ME)$ (시뮬레이션을 기반(基盤)으로 하는 영업이윤율(營業利潤率) 추정(推定) 시스템)

  • Yi, Chang-Yong;Kim, Ryul-Hee;Lim, Tae-Kyung;Kim, Wha-Jung;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.11a
    • /
    • pp.109-113
    • /
    • 2007
  • This paper introduces a system, Simulation based Stochastic Markup Estimation System (S2ME), for estimating optimum markup for a project. The system was designed and implemented to better represent the real world system involved in construction bidding. The findings obtained from the analysis of existing assumptions used in the previous quantitative markup estimation methods were incorporated to improve the accuracy and predictability of the S2ME. The existing methods has four categories of assumption as follows; (1) The number of competitors and who is the competitors are known, (2) A typical competitor, who is fictitious, is assumed for easy computation, (3) the ratio of bid price against cost estimate (B/C) is assumed to follow normal distribution, (4) The deterministic output obtained from the probabilistic equation of existing models is assumed to be acceptable. However, these assumptions compromise the accuracy of prediction. In practice, the bidding patterns of the bidders are randomized in competitive bidding. To complement the lack of accuracy contributed by these assumptions, bidding project was randomly selected from the pool of bidding database in the simulation experiment. The probability to win the bid in the competitive bidding was computed using the profile of the competitors appeared in the selected bidding project record. The expected profit and probability to win the bid was calculated by selecting a bidding record randomly in an iteration of the simulation experiment under the assumption that the bidding pattern retained in historical bidding DB manifest revival. The existing computation, which is handled by means of deterministic procedure, were converted into stochastic model using simulation modeling and analysis technique as follows; (1) estimating the probability distribution functions of competitors' B/C which were obtained from historical bidding DB, (2) analyzing the sensitivity against the increment of markup using normal distribution and actual probability distribution estimated by distribution fitting, (3) estimating the maximum expected profit and optimum markup range. In the case study, the best fitted probability distribution function was estimated using the historical bidding DB retaining the competitors' bidding behavior so that the reliability was improved by estimating the output obtained from simulation experiment.

  • PDF

Study on the effective parameters and a prediction model of the shield TBM performance (쉴드 TBM 굴진 주요 영향인자분석 및 굴진율 예측모델 제시)

  • Jo, Seon-Ah;Kim, Kyoung-Yul;Ryu, Hee-Hwan;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.3
    • /
    • pp.347-362
    • /
    • 2019
  • Underground excavation using TBM machines has been increasing to reduce complaints caused by noise, vibration, and traffic congestion resulted from the urban underground construction in Korea. However, TBM excavation design and construction still need improvement because those are based on standards of the technologically advanced countries (e.g., Japan, Germany) that do not consider geological environment in Korea at all. Above all, although TBM performance is a main factor determining the TBM machine type, duration and cost of the construction, it is estimated by only using UCS (uniaxial compressive strength) as the ground parameters and it often does not match the actual field conditions. This study was carried out as part of efforts to predict penetration rate suitable for Korean ground conditions. The effective parameters were defined through the correlation analysis between the penetration rate and the geotechnical parameters or TBM performance parameters. The effective parameters were then used as variables of the multiple regression analysis to derive a regression model for predicting TBM penetration rate. As a result, the regression model was estimated by UCS and joint spacing and showed a good agreement with field penetration rate measured during TBM excavation. However, when this model was applied to another site in Korea, the prediction accuracy was slightly reduced. Therefore, in order to overcome the limitation of the regression model, further studies are required to obtain a generalized prediction model which is not restricted by the field conditions.

Feasibility Study on the Construction of a Wood Industrialization Services Center for a Wood Industry Cluster Establishment in Jeollanam-do (전라남도 지역의 목재산업 클러스터 구축을 위한 목재산업화지원센터 설립의 타당성 검토를 위한 연구)

  • An, Ki-Wan;Park, Kyung-Seok;Ahn, Young Sang
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.4
    • /
    • pp.506-514
    • /
    • 2013
  • This study examined the feasibility on the construction of a wood industrialization service center for a wood industry cluster establishment in Jeollanam-do. Construction of the wood industrialization service center is based on a discount rate of 3.5%, an investment period of 4 years, a business operations period of 16 years and an investment cost of 24600 million won; the total amount of the net present value, the cost-benefit ratio and the internal rate of return were assumed to be 2.579 million won, 2.51%, and 10.1%, respectively. In addition, the production inducement coefficient, the induced production effect, the income-induced coefficient, the income inducement effect, the employment inducement coefficient, and the employment inducement effect were estimated 1.4345, 35287 million won, 0.1655, 4000.7 million won, and 0.4665, 1,145 people, in the effects of the wood related industries using the multi-regional input-output model, respectively. Financial independence of operating income to cover its own costs incurred in accordance with the operating project might be practicable.