• Title/Summary/Keyword: Estimated Construction Cost

Search Result 307, Processing Time 0.026 seconds

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro-Power Plants (터널식 소수력 발전소의 최적 설계유량에 관한 연구)

  • 이철형;박완순
    • Water for future
    • /
    • v.24 no.1
    • /
    • pp.63-71
    • /
    • 1991
  • This study represents the methodology for feasibility analysis of small hydro power plants. Cumulative density function of Weibull distribution and Thi-essen method were adopted to beside flow duration curve at candidate sites. The performance prediction model and construction cost estimation model for tunnel-type small hydro power plants were developed. Eight candidate sites existing on Han river selected and surveyed for actual sites reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrates with the lowest unit generation cost for tunnel-type small hydro power plants were the flowrate concerning with between 20 % and 30 % of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual average load factor, annual electricity production were estimated and discussed for surveyed sites.

  • PDF

A Study on the Sanitary Piping System Plan When an Aged Public Housing is Remodeled (노후 공동주택의 위생설비 리모델링 계획방안에 관한 연구)

  • Han, Soo-Gon;Lee, Sang-Youp;Lee, Seung-Yeon;Hong, Min-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.569-574
    • /
    • 2008
  • Recently, the domestic remodeling market is increased in scale. This study is to develop the sanitary piping system which improves quality of life and facility performance when the aged public housing is remodeled. Above all, we found out three standard floor plans in bathrooms of the public housing. And then, the plan and section types of the sanitary piping system were developed for the on-floor piping, a construction cost of each section types was estimated to review the economical fact. Also, the field mock-up test was performed in the type of the pipe shaft with on-floor pit. In result, the developed sanitary piping system was available for the remodeling public housing without a great facility cost. Additionally, the sanitary pipe was replaced easily through the shaft and on-floor fit. And a noise was reduced to a lower unit when the water flowed down.

  • PDF

Reliability Analysis on the Decision Method of Lateral Flow of Foundation Piles for Abutment (교대 기초말뚝의 측방유동 판정식에 관한 신뢰성 해석)

  • Ahn, Jong-Pil;Kim, Gyu-Deok;Kim, Il-Goo;Choi, Jin-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1090-1097
    • /
    • 2008
  • This study conducted the decision method of lateral flow in abutment structures founded on the soft soils and the reliability analysis on the foundation pile for abutment. On the basis of the results, this study proposed the reliability design model. Reliability analysis was conducted by applying second moment method, point estimation method, and expected total cost minimization to lateral movement index, lateral movement decision index, modified lateral movement decision index, and circular failure safety factor for the decision criteria of lateral flow. The reliability index by analysis method had a similar tendency each other. Point estimation method was found as a practical method in the aspect of convenience because it could conduct the analysis only by mean and standard deviation as well as the partial derivative on random variables was not necessary. Optimum reliability index and optimum safety according to increasing in failure factors and load ratio were analyzed and loads and resistance factors of the design criteria of optimum reliability were estimated. It presented rational design model which can consider construction level and stability and economical efficiency overall.

  • PDF

The Parameter Study of Serviceability Review of End Track on Railway Bridge installed Concrete Slab Track (콘크리트궤도 부설 교량의 단부 사용성 검토를 위한 매개변수 연구)

  • Sung, Deok-Yong;Kim, Young-Ha;Park, Yong-Gul;Kim, Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.117-124
    • /
    • 2008
  • Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. However, in case of railway bridge installed concrete slab track, the serviceability review of end deck should be performed for reducing the maintenance cost of track. The serviceability review of track contains that the compression force which is occurred on fastener of end bridge should be smaller than the compression force causing the deformation limit of elastic pad and the uplift force which is occurred on fastener of end abutment should be smaller than initial fastening force. Therefore, this study calculated the deflection and end rotation of the railway bridge according to the span length and stiffness of railway bridge and estimated the compression force and uplift force which are occurred on the track of end bridge using the finite element method. This study indicated the several diagrams that are contained the correlation between the behaviour of the track and the behaviour of the railway bridge. As a result, to reduce the end rotation of the railway bridge is very efficient to increase the height of railway deck.

  • PDF

Quantified Evaluation on the Qualitative Criteria for the Selection of Appropriate Concrete Slab Form-works for Residential Buildings (델파이 기법을 이용한 정성적 공법 선정 요인의 정량적 평가 분석)

  • Lee, Kyung-Suk;Lee, Tae-Hee;Shin, Young-Keun;Kim, Tae-Hyung;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.136-144
    • /
    • 2011
  • The form-work operation of concrete structures is a major element determining the period and cost of construction projects. However, the selection of the appropriate form-work system is dependent on the experience of the site personnel only. In this paper, existing methods (Aluminum form, Sky deck) and new slab form-work methods (AFB: Aluminum panel Form with dropping Beam) were selected. Each method was estimated by means of Delphi techniques based on the qualitative analysis data. This paper suggests an evaluation methodology of slab form-work application in construction sites by calculating qualitative evaluation scores. The methodology finding quantified scores of qualitative criteria can be available to be applied to other construction operation evaluation methods.

A Value Analysis of Ecological Restoration Construction Considering Life Cycle Cost and Performance - Focusing on the Wet Media for Slope Revegetation - (생애주기비용과 성능을 고려한 생태복원 공법 가치분석 - 습식 비탈면 기반재를 사례로 -)

  • Li, Lan;Kim, Sung Hee;Kim, Bo Heui;Lim, Su Hyun;Kim, Sung Il;Koo, Bon Hak
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.5
    • /
    • pp.101-109
    • /
    • 2014
  • In order to save costs and enhance quality in construction without damaging the environment, the VE/LCC analysis method is increasingly used. This study was carried out to conduct a value analysis for the ecological restoration of a slope considering life cycle cost and performance. The construction conditions were classified into three types(A, B, C) according to the condition of each base. Three construction methods for slope ecological restoration were selected by each condition. Eventually, a value analysis was conducted for total nine conditions by analyzing the life cycle cost and performance. The gradient of slope and base of Condition 1 were below 1:1.2 and general soil, while condition 2 and 3 were below 1:1.0(reaping rock) and below 1:0.7(soft rock, blasted rock), respectively. A value analysis was conducted based on the value estimated via life cycle cost and performance analysis. The result showed that the B construction method had the highest value in Condition 1 as it showed 108.4, while A and C showed 90.3 and 45.8, respectively. When it comes to Condition 2, Construction Method A indicated the highest value as it showed 89.1(B: 47.5, C: 47.0). In Condition 3, Construction Method A(89.1) was the highest, while B and C showed 55.4 and 40.2, respectively. Based on the result of this study, in order to make a reasonable decision that can enhance quality and reduce costs in slope ecological restoration, the slope ecological restoration method must be reviewed in consideration of life cycle cost and performance.

A Decision Support Model for Optimal Delivery of Public Construction Projects (공공건설사업의 최적 발주방식 선정을 위한 의사결정지원모델)

  • Park, Heetaek;Park, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.22-34
    • /
    • 2016
  • The Project Delivery System (PDS) is used in mixed way without clear classification from tendering system and the standard itself that can be selected is set with project budget or estimated cost only. Essentially, the PDS should consider and reflect project characteristics and types, internal and external factors for the purpose of improving the lives of citizens and their welfare. However, the current status is not operated flexibly due to the given budget, period and uniform laws and regulations. In order to solve this problem, this study suggests a Decision Support Model to select the optimal PDS for public construction projects. The current problem of the PDS for public construction projects were identified and the application of a decision support model was proposed. Subsequently a decision-making model was suggested for each PDS using the identified factors and linear discriminant function of discriminant analysis. An additional questionnaire survey and actual practical case analysis were carried out to verify the effectiveness and applicability of the model to actual work. It can be used by adjusting the decision support model and detailed factors according to the specific characteristics of public organization, ability of person in charge and project type.

A Study on the Earthwork Volume Computation and Topographic Analysis using DTM Interpolations (DTM 보간기법별 토공량 산정과 지형분석에 관한 연구)

  • Park, Woon-Yong;Kim, Chun-Young;Lee, Hyun-Woo
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.9 no.1 s.17
    • /
    • pp.39-47
    • /
    • 2001
  • DTM(Digital Terrain Model) can play a key rule in a great number of the fields of construction Engineering. One of the most important application fields is to determine volume in that the total construction expenses is usually calculated through this. It therefore is necessary to the study on improving the precise of the determination using DTM on account of saving time and cost. On this study, 1:5000 topographic maps issued by NGI in 15 districts involved in Pusan city was digitalized to generate DTM at first. After this step, not only was the determination of the volume as well as readjusted area and height done for the sake of estimating the changable topography caused by cut & fill volume in future but also provided the model to calculate it as results. In addition, comparison among the interpolations, such as Inverse Distance Method and Nearest Neighbor, was respectively done to look over the differences of the volume estimated from each interpolation and also to find the most suitable method. As a result, the former yielded the largest values of area and the volume while the latter gave the smallest ones. Moreover, the values estimated on this study were closely similar to ones obtained by the government of Pusan.

  • PDF

Estimation of Rock Drilling Work Size for Mountain Forest Road Construction (산악지(山岳地) 임도시설(林道施設)을 위한 암석천공(岩石穿孔) 작업량(作業量)의 예측(豫測))

  • Ma, Sang Kyu
    • Journal of Korean Society of Forest Science
    • /
    • v.76 no.3
    • /
    • pp.193-199
    • /
    • 1987
  • Simple estimating method of rock drilling and blasting work size is necessary to apply as a guidance of general road plan and a cost analysis of mountain forest road construction. For this work study, 11 cycles were divided in 5km route at Hyeonnammeon Yangyang-gun and the mountain slope at every 20m interval was measured. During working days all kind of works concerned on drilling and blasting was investigated in every cycle. Depending on the simple work study results it's work size can bef estimated with high correlation between drilling length in meter and frequency percentage of mountain slope more than 70%. With total drilling length known the machinery hours, drillers and explosive quantify can be estimated by the regression with high correlation. Estimation of drilling and blasting work by mountain slope gradient in road route is proposed like table 5 with estimating value of machinery hour, drillers and explosive in granite gneiss region.

  • PDF

A Model of Location Decisions of Natural Gas Filling Station Considering Spatial Coverage and Travel Cost (공간적 접근성 및 통행비용을 고려한 천연가스 충전소 최적 입지선정 모형)

  • Yu, Jeong-Whon;Lee, Mu-Young;Oh, Sei-Chang
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.3
    • /
    • pp.145-153
    • /
    • 2008
  • This study proposes a facility location model in consideration of spatial coverage and travel cost as an effort to make objective and effective decisions of natural gas filling stations. The proposed model is developed for fixed stations and consists of two stages. The first stage employs a heuristic algorithm to find a set of locations which satisfy the spatial coverage constraints determined by the maximum travel distance between the filling stations and bus depots. In the second stage, the optimal location of filling stations is determined based on the minimum travel cost estimated by using a modified transportation problem as well as the construction and maintenance costs of the filling stations. The applicability of the model is analyzed through finding the optimal location of filling stations for the city of Anyang, a typical medium-sized city in metropolitan Seoul, based on the demand of natural gas buses. This study is expected to help promote the spread of natural gas buses by providing a starting point of a objective and reasonable methodological perspective to address the filling station location problem.