• Title/Summary/Keyword: Error Budget

Search Result 102, Processing Time 0.024 seconds

SOC 자본스톡 추계에 있어서 수익적 지출과 자본적 지출의 적합 분배 (An Appropriated Share between Revenue Expenditure and Capital Expenditure in Capital Stock Estimation for Infrastructure)

  • 조진형;이세재;오현승;권정훈;정남용;김명수
    • 산업경영시스템학회지
    • /
    • 제41권2호
    • /
    • pp.153-158
    • /
    • 2018
  • At the Bank of Korea, capital stock statistics were created by the PIM (perpetual inventory method) with fixed capital formation data. Asset classifications also included 2 categories in residential buildings, 4 non-residential buildings, 14 constructions, 9 transportation equipment, 28 machinery, and 2 intangible fixed assets. It is the Korean government accounting system which is developed much with the field of the national accounts including the valuation, but until 2008 it was consistent with single-entry bookkeeping. Many countries, including Korea, were single-entry bookkeeping, not double-entry bookkeeping which can be aggregated by government accounting standard account. There was no distinction in journaling between revenue and capital expenditure when it was consistent with single-entry bookkeeping. For example, we would like to appropriately divide the past budget accounts and the settlement accounts data that have been spent on dredging into capital expenditure and revenue expenditure. It, then, tries to add the capital expenditure calculated to FCF (fixed capital formation), because revenue expenditure is cost for maintenance etc. This could be a new direction, especially, in the estimation of capital stock by the perpetual inventory method for infrastructure (SOC, social overhead capital). It should also be noted that there are differences not only between capital and income expenditure but also by other factors. How long will this difference be covered by the difference between the 'new series' and 'old series' methodologies? In addition, there is no large difference between two series by the major asset classification level. If this is treated as a round-off error, this is a problem.

맵핑용 3차원 영상 레이저 레이다의 시스템 설계 및 성능 분석 (System Design and Performance Analysis of 3D Imaging Laser Radar for the Mapping Purpose)

  • 라종필;고진신;이창재
    • 한국군사과학기술학회지
    • /
    • 제17권1호
    • /
    • pp.90-95
    • /
    • 2014
  • The system design and the system performance analysis of 3D imaging laser radar system for the mapping purpose is addressed in this article. For the mapping, a push-bloom scanning method is utilized. The pulsed fiber laser with high pulse energy and high pulse repetition rate is used for the light source of laser radar system. The high sensitive linear mode InGaAs avalanche photo-diode is used for the laser receiver module. The time-of-flight of laser pulse from the laser to the receiver is calculated by using high speed FPGA based signal processing board. To reduce the walk error of laser pulse regardless of the intensity differences between pulses, the time of flight is measured from peak to peak of laser pulses. To get 3D image with a single pixel detector, Risley scanner which stirs the laser beam in an ellipsoidal pattern is used. The system laser energy budget characteristics is modeled using LADAR equation, from which the system performances such as the pulse detection probability, false alarm and etc. are analyzed and predicted. The test results of the system performances are acquired and compared with the predicted system performance. According to test results, all the system requirements are satisfied. The 3D image which was acquired by using the laser radar system is also presented in this article.

건설공사 공정별 작업기간 산정을 위한 신경망 기반 모형 구축 (Development of Estimation Model of Construction Activity Duration Using Neural Network Theory)

  • 조빛나;김현승;강인석
    • 한국산학기술학회논문지
    • /
    • 제16권5호
    • /
    • pp.3477-3483
    • /
    • 2015
  • 공정계획 수립 시 각 공정별 작업기간 산정은 프로젝트 전체 공사기간 및 사업비용 결정과 직결되기 때문에 합리적인 산정계획이 요구된다. 그러나 일반적으로 작업기간 산정은 공사 담당자의 경험과 직관을 통해 이루어지고 있고, 다양한 영향요인에 의한 불확실성으로 인해 예측에 어려움이 있다. 이에 본 연구에서는 작업기간 산정에 영향을 미치는 다양한 요인을 고려할 수 있도록 신경망 기반 건설공사 공정별 작업기간 산정 모형을 제시하고자 한다. 본 연구에서는 정량적 및 정성적 요인을 모두 고려하여 작업기간 산정 모형을 구축하고, 사례적용을 통해 모형의 적용가능성을 검토하였다. 또한 영향요인 상관성분석을 실시하여 구축된 신경망 구조의 적합성을 판단하였다. 연구에서는 작업기간 산정 모형을 통해 합리적인 일정계획을 제공함으로써 계획공사기간과 실제공사기간의 오차율을 줄이는데 도움을 줄 수 있을 것으로 기대된다.

김해지역 소방무선통신시스템의 전파특성 연구 (A Study on the Propagation Characteristics of Wireless Communication System for Firefighters in Kimhae Site)

  • 이수빈;고봉진
    • 한국항행학회논문지
    • /
    • 제19권2호
    • /
    • pp.168-174
    • /
    • 2015
  • 소방무선통신시스템은 화재, 구조, 구급 등 재난현장에서 지휘관과 현장 요원 간 최후의 통신으로서 중요한 역할을 하고 있다. 하지만 경남 소방무선통신시스템의 운영은 예산범위의 한계와 전문적인 통신 인력의 부재로 송신국 부지선정, 전파환경 분석 등의 정량적 기준 없이 설치 및 유지 관리되고 있는 실정이다. 따라서 본 논문에서는 이러한 문제점을 개선하기 위하여 경남 김해 소방무선중계국(신어산)을 기준으로 도내 전 소방관들이 실제 운용중인 UHF 400 MHz 대역을 자유공간손실과 단일, 다중 장애물에 의한 회절량을 이론적으로 계산하고, 한국전파연구원에서 운영 중인 주파수자원분석시스템을 통해 시뮬레이션 및 실제 측정결과 값을 비교하여 그 오차를 산정하였다. 그 결과, 김해지역에서의 400 MHz 대역 전파예측모델은 회절모델인 Deygout모델이 측정치와 일치하였다.

공공청사 개산견적 정확도 향상을 위한 공사비 영향요인 분석 (Analysis of Impact Factors for the Improvement of Conceptual Cost Estimation Accuracy for Public Office Building)

  • 조영호;윤석헌
    • 한국건축시공학회지
    • /
    • 제21권5호
    • /
    • pp.495-506
    • /
    • 2021
  • 본 연구는 기획단계에서 이루어지는 개산견적 예측 모델의 정확도를 향상시키기 위하여 최적의 영향요인 조합을 제시하였다. 이에 기획단계에서 활용이 가능한 정량적인 영향요인을 선정하여 상관분석 통해 공사비에 가장 많은 영향을 주는 연면적을 중심으로 8가지의 영향요인 조합을 설정하였다. 8가지 영향요인 조합을 다중회귀분석을 통하여 VIF계수 및 회귀식을 도출하였다. VIF계수를 통해 연면적, 건축면적과 층 영향요인을 함께 사용할 경우 연면적과 건축면적 두 영향요인 간의 종속적인 관계를 확인하였다. 이에 독립성이 예측 모델 정확도의 관계를 분석하기 위하여 실 사례 프로젝트 10건을 회귀식에 대입하여 정확도를 분석하였다. 분석결과, 독립성이 확보가 안 된 영향요인 조합은 다른 영향요인에 비해 정확도 떨어지는 것을 확인할 수 있다. 따라서 최대한 많은 영향요인을 활용하는 것보다 최적의 영향요인 조합을 선정하는 것이 예측 모델의 정확도를 향상시킬 수 있다고 판단되며, 본 연구에서는 연면적과 건축면적을 활용하였을 경우 정확도가 가장 높은 것을 확인하였다.

ESTIMATING COSTS DURING THE INITIAL STAGE OF CONCEPTUAL PLANNING FOR PUBLIC ROAD PROJECTS: CASE-BASED REASONING APPROACH

  • Seokjin Choi;Donghoon Yeo;Seung H. Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1183-1188
    • /
    • 2009
  • Estimating project costs during the early stage of conceptual planning is very important when deciding whether to approve the project and allocate an appropriate budget. However, due to greater uncertainties involved in a project, it is challenging to estimate costs during this initial stage within a reasonable tolerance. This paper attempts to develop a cost-estimate model for public road projects under these circumstances and limitations. In the conceptual planning stage of a road project, there is only limited information for cost estimation, for example, such input data as total length of the route, origin and destination, number of lanes, general geographic characteristics of the route, and other basic attributes. This implies that the model should individuate suitable but restricted information without considering detailed features such as quantity of earthwork and a detailed route of a given condition. With these limited facts, this paper applies a case-based reasoning (CBR) method to solve a new problem by deriving similar past problems, which in turn is used to estimate the cost of a given project based on best-fitted previous cases. To develop a CBR cost-estimate model, the authors classified 8 representative variables, including project type, the number of lanes, total length, road design grades, etc. Then, we developed the CBR model, primarily by using 180 actual cases of public road projects, procured over the last decade. With the CBR model, it was found that the degree of error in estimation can be reasonably reduced, to below approximately 30% compared to the final costs estimated upon the completion of detailed design.

  • PDF

굴삭기 AR 시스템을 위한 이미지 프로세싱 기반 가상 이미지 중첩 기술 (Seamless Superimposition Technique of Virtual Objects for AR System of Excavator Based on Image Processing)

  • 이강혁;박주환;강호준;신도형
    • 한국건설관리학회논문집
    • /
    • 제18권2호
    • /
    • pp.21-29
    • /
    • 2017
  • 최근 증강현실(AR)에 대한 대중적인 관심의 증가와 함께, 건설장비에 AR 기술을 도입하여 효율성을 높이려는 다수의 연구가 진행되고 있다. AR 기술을 도입하기 위해선 실세계와 카메라의 가상세계를 오차없이 연결할 수 있는 정교한 외부 표정이 필수적이다. 하지만 건설 현장에서는 한정된 비용과 시간의 문제와 현재 상용화되어있는 야외용 트래킹 시스템(경사계, GPS시스템 등의 오차로 인해, 정교한 외부 표정을 도입하는 것이 사실상 불가능하다. 본 연구에서는 굴삭기에 적용되는 AR 시스템인 AR 네비게이터를 위하여 정교하지 않은 외부 표정을 이용하더라도 이미지 프로세싱 기법을 통해 가상 이미지를 매끄럽게(Seamless) 중첩시키는 방법을 제안한다. 본 연구를 기반으로, 건설장비에 특화된 AR 네비게이터의 개발을 완료할 수 있을 것이라 생각이 된다. 또한 개발된 AR 네비게이터를 건설현장에 보급함으로써, 건설현장의 작업 효율성과 크게 향상시킬 것이라 기대하고, 추후 굴삭기 뿐 아니라 다른 건설장비에 적용될 수 있는 AR 기반 시스템이 갖춰질 것이라 생각한다.

우리별 1, 2호 아날로그 태양 감지기의 궤도상 운용결과 (KITSAT-1/2 ANALOG SUN SENSORS-IN-ORBIT RESULTS)

  • 장현석;김병진;임광수;성단근;최순달
    • Journal of Astronomy and Space Sciences
    • /
    • 제13권2호
    • /
    • pp.173-180
    • /
    • 1996
  • 이 논문에서는 우리별 1호와 2호의 간략한 설명과 우리별 I호와 통일한 구조를 가진 우리별 2호의 아날로그 태양 감지기의 동작원리, 보정 방법 및 궤도상의 운용결과를 서술한다. 아날로그 태양 감지기는 향후 위성 프로젝트를 위한 실험 탑재체로써 탑재되었다. 이 태양 감지기들은 위성이 요구하는 중량 및 전력 소모의 최소화에 알맞게 제작되었다. 두개의 일차원 아날로그 태양 감지기들이 우리벌 2호 위성의 윗면에 부착되어 있다. 각각의 태양 감 지기들은 $\pm60^{\circ}$의 앙각을 갖고 있으며 갑지기 두개가 총 $210^{\circ}$의 앙각을 가지므로 $30^{\circ}$의 중 첩부분이 있다. 일차원 태양 감지기들이 위성의 Z축에 정렬되어 있으므로 위성의 Z축(yaw 축)을 중심으로한 상대적인 태양각과 위성의 회전 속도만을 알 수 있다. 각각의 태양 감지기는 지상에서 5차 곡선 적합화(5th order line fitting) 알고리즘율 이용하여 보정수식올 얻었으며 이 수식들은 궤도상의 운용결과에 적용되었다. 그 결과 입사 태양광의 난반사가 가장 심한 입사각 $0^{\circ}$ 근처를 제외한다면 태양전지판용 실리콘 소자를 사용한 태양 감지기 1의 경우 $1.5^{\circ}$, 파기원에서 제작된 실리콘 광소자를 사용한 태양 감지기 2의 경우 $0.5^{\circ}$의 최대 오차흘 갖는 궤도 운용상의 성능을 보여 주었다. 그 결과들을 4장에 보였으며 각각의 태양 감지기의 성능과 가능한 감지기의 부확에 따롱 오차를 5장에 보인다.

  • PDF

월(月) 평균유역증발산량(平均流域蒸發散量) 추정(推定)에 관(關)한 연구(硏究) (A Study on the Estimation of Monthly Average River Basin Evaporation)

  • 김태철;안병기
    • 농업과학연구
    • /
    • 제8권2호
    • /
    • pp.195-202
    • /
    • 1981
  • 회개, 수자원획(水資源劃) 등(等) 이수(利水)를 목적(目的)으로 하는 장기유출해석(長期流出解析)에 있어 가장 중요(重要)한 인자(因子) 중(中)의 하나인 유역증발산량(流域蒸發散量)을 Water budget방법(方法)에 의(依)하여 산정(算定)하여, Pan, Potential, Regional evaporation과 Temperature와의 관계(關係)를 구명(究明)하여 유출기록(流出記錄)이 없는 무계기(無計器) 지역(地域)의 유역증발산량(流域蒸發散量)과 장기유출량(長期流出最)을 추정(推定)하기 위하여 금강수계(錦江水系) 용담지점(龍潭地點)의 5 개년(個年) 자료(資料)를 분석(分析)한 결과(結果)는 다음과 같다. 1. Pan evaporation과 River basin evaporation과의 비(比)($E_w/E_{pan}$)가 계절별(季節別) 성향(性向)을 가장 질서(秩序)있게 나타났으며, Pan evaporation으로부터 River basin evaporation을 Fig. 9 또는 Table-7로부터 추정(推定)할 수 있다. 2. Penman의 Potential evaporation을 적용하기 위하여 cloudness effect와 Wind function의 지역상수(地域常數)를 결정한 결과, 용담지역(龍潭地域)의 지역상수(地域常數)는 다음과 같다. $R_A=R_C(0.13+0.52{\frac{n}{D}})$ $E_a=0.35(e_s-e)(1.8+1.0U)$ 3. Regional evaporation [$E_R=(1-a)R_C-E_P$]는 유도과정의 가정에 따른 functional error가 큰 것으로 보여지나, 유역(流域)전반의 물리(物理), 화학(化學), 생물학적(生物學的)인 증발(蒸發)기구를 포괄적(包括的)으로 포용(包容)하고 있는 이와같은 이론적(理論的)인 함수개발(函數開發)이 요망된다. 4. 기상자료(氣象資料)가 미비(未備)한 지역(地域)에서는 기온(氣溫)만으로 Fig-11과 같이 개락적(槪略的)인 월(月) 평균(平均) 증발산(蒸發散)을 구(求)할 수 있다.

  • PDF

기초연구지원사업의 재정소요 전망 도출을 위한 시계열 모형 수립 연구 (A Study on Establishment of Time Series Model for Deriving Financial Outlook of Basic Research Support Programs)

  • 윤수진;이상경;염경환;신애리
    • 기술혁신연구
    • /
    • 제27권4호
    • /
    • pp.21-48
    • /
    • 2019
  • 기초연구 분야는 정부의 적극적인 지원으로 양적 확대가 큰 폭으로 이루어지는 반면, 체계적인 투자계획이나 데이터에 기반한 재정소요를 제시하는 연구 및 정책자료가 전무하여 관련 연구가 요구되는 시점이다. 이에 본 연구는 시계열 예측모형을 활용하여 기초연구지원사업의 향후 재정소요를 전망하였다. 기초연구분야의 특성을 포함한 다양한 요인들을 종합적으로 고려하기 위하여 시간에 따른 단일 종속변수의 값을 예측하는 ARIMA 모형이 아닌, 다변수의 영향을 반영할 수 있는 ARIMAX 모형을 선택하였다. 모형 적합성 판단을 위해 ARIMAX 모형과 ARIMA 모형의 예측값을 비교한 결과 ARIMAX 모형에서 예측오차율이 개선됨을 확인하였다. ARIMAX 모형에 기반하여 2017년에서 2021년까지 5년 간의 기초연구지원사업 재정소요를 전망하였다. 본 연구는 기초연구지원사업의 재정소요를 통계적 접근방법인 시계열모형을 적용해 전망한 시범적 연구를 수행하였다는 점과, 단변량이 아닌 다변량을 고려하여 예측력을 개선했다는 점에서 의의를 지닌다. 또한 현 정부 국정과제인 '기초연구 예산 2배 확대' 등 기초연구 투자의 중요성이 꾸준히 강조되는 정책기조를 고려할 때 향후 기초연구 투자전략 수립 시 참고자료로 활용 될 수 있다.