• 제목/요약/키워드: Erection Process

검색결과 83건 처리시간 0.027초

제약이론을 기반으로 한 최적제품조합 의사결정 지원 방법론 및 시스템 (Decision Supporting Methodology and System Based on Theory of Constraints for Optimal Product Portfolio Strategy in Shipbuilding Industry)

  • 김인일;한성환;권민철
    • 대한조선학회논문집
    • /
    • 제46권3호
    • /
    • pp.362-371
    • /
    • 2009
  • Shipbuilding is a typical 'build to order' industry. It has a business model that generates revenues from building various ships and offshore products in accordance with owner's requirements at each production stage. Under uncertainty in shipping market, it is very essential for the shipbuilder to prepare the fast and competitive decision for product portfolio strategy in order to maximize contribution margin by exploiting production facilities and constraints. In this study, we introduce the unique decision supporting methodology for the optimal product portfolio sets based on Theory of Constraints(TOC). This methodology is established by adopting the concept of Drum Buffer Rope(DBR) in constraints planning and Throughput Accounting (TA) in management accounting of TOC. In addition, Decision Supporting System(DSS) is implemented. This DSS system provides a throughput estimator with reflecting the cost structure of shipbuilding industry and a resource simulator built on heuristic algorithms to operate major constraint-resources in shipyard such as dock, quay and pre-erection area etc. Several examples are presented to show that the proposed methodology and system can effectively support the strategic decision-making process of a global shipbuilding company.

시공단계를 고려한 U-Channel Bridge의 슬래브 설계 (Slab Design of U-Channel Bridge Considering Construction Sequence)

  • 최동호;김성재;전선용;김용식;김성원
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 춘계 학술발표회 제20권1호
    • /
    • pp.265-268
    • /
    • 2008
  • 본 논문에서는 새로운 교량 형식인 U-Channel Bridge(UCB)의 시공단계를 고려하여 그 거동 및 슬래브의 설계방법에 대한 연구를 수행하였다. UCB는 각각의 세그먼트를 공장에서 제작하여 현장에서 조립하여 시공하므로 각 시공단계별로 지지 조건에 변화가 발생한다. UCB의 시공단계를 지지 조건이 변화하는 제작, 운반, 가설빔 거치, 완공의 네 단계로 구분하여 각 단계마다 프레임 요소와 판 요소를 적용하여 적합한 구조해석 모델을 제시하였으며, 구조해석을 수행하고 그 결과를 검토하였다. 검토 결과 슬래브의 해석은 네 단계를 모두 고려하여 수행되어야 하는 것으로 나타났으며 구성된 모델을 적용하여 타당한 슬래브의 설계방법을 제안하였다.

  • PDF

조선소의 메가블록 조립작업장을 위한 공간계획알고리즘 개발 (Spatial Scheduling for Mega-block Assembly Yard in Shipbuilding Company)

  • 고시근;장정희;최대원;우상복
    • 산업공학
    • /
    • 제24권1호
    • /
    • pp.78-86
    • /
    • 2011
  • To mitigate space restriction and to raise productivity, some shipbuilding companies use floating-docks on the sea instead of dry-docks on the land. In that case, a floating-crane that can lift very heavy objects (up to 3,600 tons) is used to handle the blocks which are the basic units in shipbuilding processes, and so, very large blocks (these are called the mega-blocks) can be used to build a ship. But, because these mega-blocks can be made only in the area near the floating-dock and beside the sea, the space is very important resource for the process. Therefore, our problem is to make an efficient spatial schedule for the mega-block assembly yard. First of all, we formulate this situation into a mathematical model and find optimal solution for a small problem using a commercial optimization software. But, the software could not give optimal solutions for practical sized problems in a reasonable time, and so we propose a GA-based heuristic algorithm. Through a numerical experiment, finally, we show that the spatial scheduling algorithm can provide a very good performance.

STEP에 의한 조선 통합 생산 시스템(CIMS) 구현 방법 (The Implementation Method of CIMS for Ship Manufacturing using STEP)

  • 유상봉;이재원;정용문;윤덕영;김훈주
    • 대한조선학회논문집
    • /
    • 제31권3호
    • /
    • pp.38-46
    • /
    • 1994
  • 통합 생산 시스템의 역할은 제품의 전 생명주기에 걸쳐 필요한 다수의 응용 프로그램을 통합하는 것이다. STEP은 독립적으로 개발된 응용 프로그램의 통합을 쉽게 하기 위하여 정보모델과 인터페이스를 정의하는 국제 표준화 작업이다. STEP을 이용한 조선 통합생산시스템(CIMS)에서 정보모델은 EXPRESS로 정의되어 있으며, 이 정보모델은 데이타베이스의 스키마로 번역되어 진다. 논문에서는 조선공정계획 시스템에 포함된 두개의 응용 프로그램(즉, 블럭분할 시스템과 탑재 시스템)을 이용하여 개발된 프로토타입의 운용을 설명한다. 예로서 본 논문에서는 관계형 데이타베이스(Oracle)에 저장되어 있는 실제의 데이타를 보여준다.

  • PDF

대심도 복층터널 중간슬래브의 기계화 시공법 개발 (Development of Mechanical Construction Method of Road Deck Middle Slab of Double Deck Tunnel in Great Depth)

  • 이두성;김영진;김태균;김창용
    • 대한토목학회논문집
    • /
    • 제39권3호
    • /
    • pp.451-460
    • /
    • 2019
  • 우리나라는 제한된 국토 면적에 비해 인구 밀도가 높고 그에 따른 교통량 증가로 인한 효율적인 공간 이용의 필요성이 시급하다. 이를 위해 여러가지 지하구조물의 건설이 증가하고 있으며 그 대표적인 것이 복층터널이다 대심도에 구축되는 복층터널에서 중간슬래브의 시공기간은 전체 공정에서 터널 라이닝 구축 다음으로 중요한 부분이라 할 수 있다. 복층터널에서 중간슬래브를 구축하는데 소요되는 공기를 최소화할 수 있는 방안으로는 공장에서 제작된 프리캐스트 중간슬래브를 현장으로 운반하여 설치하는 공법이 제시되었으며, 현장에서 중간슬래브를 가설함에 있어서 기존의 크레인을 이용한 가설공법보다 안전하고 시공성을 향상시키기 위한 전용가설장비가 개발되어 인력투입을 최소화한 기계화가설 공법을 이 연구에서 제시하였다.

통시적 관점에서 본 한벽당(寒碧堂)의 변천과정 (A Study on Transition Process of Hanbyokdang by Diachronic Analysis)

  • 노재현;신상섭
    • 한국조경학회지
    • /
    • 제35권6호
    • /
    • pp.97-109
    • /
    • 2008
  • This study first attempted to catch the transformational affairs and motives of the representative pavilion, Hanbyeok in Honam after its construction. Especially, it re-illuminated the morphologic, significant and functional change process of a pavilion after the early Joseon Dynasty by taking the local scenery, Hanbyeokdang as a sample, and considering the space and scenic characteristics, and diachronically understood its creation process and rebuilt its inherent positional meaning to reach the following conclusion. 1. Weoldanglu, at its early foundation, seems to have stressed the function of a private banquet and lecture hall to train younger students, and served as a reception space. Then the reception function gradually increased, and up to before 1530, it seems to have been called Weoldanglu(月塘樓) or Weoldangwon(月塘院). 2. In 1619, Governor Yoo Saek changed the pavilion name to Hanbyeokdang through the subject of a poem. 200 years after Weoldang's death, it became a public space called Hanbyeokdang, an amusement place in which scholars cultivated great morale, and participated in the sending-off and welcoming of predecessors and successors. This seems to have taken a foothold as a public event or entertainment space for the local administration, Jeonjuboo(全州府) through the remodeling process sponsored by the public. 3. Scenic language such as its indicating name, expression type and surrounding view through old map and so on, the shape of Hanbyeokdang evolved and changed to diverse types after the foundation of Weoldanglu, at the heart of which Hanbyeokdang with its two legs standing at a rock was located. 4. During the late 18th century, Hanbyeokdang seems to have been a wing corridor connected closely to the left corridor of the Jeonju stream bed, whose pattern is presumed to have existed even during the early 19308. Such changes in scenic language make us assume that diverse auxiliary space, a wing corridor, was erected for use as a public banquet and amusement spot of Jeonjuboo Castle, the inherent function of Hanbyeokdang after the mid 18th century. 5. Penetration of Hanbyeokgool and the erection of Hanbyeokgyo caused the change of the ancient shape of Hanbyeokdang. Specifically, a great Hanbyeokgyo passing by the pavilion changed the relative scale, so the pavilion image of pursuing unity with nature has lost the old inherent refinement and visual character.

Design and Construction of GINZA KABUKIZA

  • Kawamura, Hiroshi;Ishibashi, Yoji;Morofushi, Tsutomu;Saragai, Yasuyuki;Inubushi, Akira;Yasutomi, Ayako;Fuse, Naohiko;Yoshifuku, Manabu;Saitoh, Kouji
    • 국제초고층학회논문집
    • /
    • 제5권3호
    • /
    • pp.233-241
    • /
    • 2016
  • This paper describes the structural solution for the design of a 29-story high-rise tower, which features a large office space above the Kabukiza Theatre. Kabuki is a type of Japanese traditional drama, and Kabukiza is the home building of Kabuki. GINZA KABUKIZA is the fifth generation of the Kabukiza Theatre, the first of which was built in 1889. In order to support 23 stories of office space above the theater - featuring a large void in plan - two 13-meter-deep mega-trusses, spanning 38.4 meters, are installed at the fifth floor of the building. Steelwork is used as a primary material for the structure above-ground, and a hybrid response control system using a buckling-restrained brace and oil damper is adopted in order to achieve a high seismic performance. This paper also describes the erection process of installing hydraulic jacks directly above the mega-truss at column bases, in order to keep the structure above the truss level during construction. The temple architecture of the previous Kabukiza is carefully restored by incorporating contemporary light-weight materials supported by steelwork.

반복 횡하중을 받는 유공 PC 기둥 접합부의 구조성능 평가 (Evaluation of Structural Performance the Hollow PC Column Joint Subjected to Cyclic Lateral Load)

  • 서수연;윤승조;이우진
    • 콘크리트학회논문집
    • /
    • 제20권3호
    • /
    • pp.335-343
    • /
    • 2008
  • 본 연구는 프리캐스트 콘크리트 모멘트 골조 시스템의 시공 성능 향상과 접합부 내진성능 향상을 위하여 새로운 개념의 PC 기둥 부재와 시공 공정을 개발하였다. 이 PC 기둥은 원심력으로 제조되어 내부에 공간이 비워있는 중공관 PC 부재로서, 이 기둥을 활용할 경우, 중공관을 통하여 현장타설 콘크리트와 동일한 일체성을 확보할 수 있다. 본 연구는 제안된 PC 기둥 접합부의 내진성능을 평가하기 위하여 반복가력 시험을 수행하였다. 실험체는 기둥 주철근의 연속성을 확보하기 위하여 기계적 이음과 겹침이음을 활용한 2가지 이음 방법을 적용하였으며, PC 기둥의 띠철근 배근 형태를 고려하여 실물 크기의 4개 실험체를 계획 실험하였다. 반복 횡력 시험 결과, 제안된 HPCC 기둥을 활용할 경우, 현장타설 RC 시스템의 접합부 내진성능을 충분히 확보할 수 있는 것으로 나타났다.

딥러닝 기반 LNGC 화물창 스캐닝 점군 데이터의 비계 시스템 객체 탐지 및 후처리 (Object Detection and Post-processing of LNGC CCS Scaffolding System using 3D Point Cloud Based on Deep Learning)

  • 이동건;지승환;박본영
    • 대한조선학회논문집
    • /
    • 제58권5호
    • /
    • pp.303-313
    • /
    • 2021
  • Recently, quality control of the Liquefied Natural Gas Carrier (LNGC) cargo hold and block-erection interference areas using 3D scanners have been performed, focusing on large shipyards and the international association of classification societies. In this study, as a part of the research on LNGC cargo hold quality management advancement, a study on deep-learning-based scaffolding system 3D point cloud object detection and post-processing were conducted using a LNGC cargo hold 3D point cloud. The scaffolding system point cloud object detection is based on the PointNet deep learning architecture that detects objects using point clouds, achieving 70% prediction accuracy. In addition, the possibility of improving the accuracy of object detection through parameter adjustment is confirmed, and the standard of Intersection over Union (IoU), an index for determining whether the object is the same, is achieved. To avoid the manual post-processing work, the object detection architecture allows automatic task performance and can achieve stable prediction accuracy through supplementation and improvement of learning data. In the future, an improved study will be conducted on not only the flat surface of the LNGC cargo hold but also complex systems such as curved surfaces, and the results are expected to be applicable in process progress automation rate monitoring and ship quality control.

병치된 변형률 계측치를 이용한 프리팹 PSC 거더 캠버 재구성 (Camber Reconstruction for a Prefab PSC Girder Using Collocated Strain Measurements)

  • 김현영;고도현;박현우
    • 대한토목학회논문집
    • /
    • 제42권2호
    • /
    • pp.151-162
    • /
    • 2022
  • 스마트 건설 기술의 도입으로 공장에서 일괄 대량생산이 가능한 프리팹 부재에 대한 관심이 높아졌다. 프리팹 프리스트레스 콘크리트 거더는 가설시 프리팹 바닥판과의 정합성을 위해 제작부터 가설 전 단계까지 거더의 형상관리가 중요하다. 이 연구에서는 프리팹 거더의 상연 및 하연에 병치된 변형률 측정치를 이용한 캠버 재구성 기법을 제시한다. 특히, 긴장력 도입 이후 가설 전까지 콘크리트의 시간 의존적 거동이 고려된 변형률 데이터에 대해 캠버 재구성 기법을 적용한다. 몬테카를로 수치 모사를 통해 제한된 센서의 개수, 계측 오차 그리고 비선형적 시간 의존적 거동들에 대해 재구성된 캠버의 통계적 정확도를 분석하고 타당성을 검증한다.