• Title/Summary/Keyword: Equipment control

Search Result 4,115, Processing Time 0.043 seconds

Analysis of Vibration of apply to drive pump with inverter (인버터 적용 펌프모타의 부하운전별 진동해석)

  • Hwang, Jin-Yeol;Kim, Ki-Won
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1131-1132
    • /
    • 2011
  • For the purpose to flow control of pump in booster pump station, nonlinear-load inverter equipment is being introduced. While inverter equipment has the advantage of power-ratio savings and volume control, due to the vibration of pump and motor, secondary breakdown may occur Purpose in this paper is reliable facility operation by providing optimal operationg standards through vibration analysis of apply to drive pump with inverter in long-term in booster pump station.

  • PDF

A Water Quality Control Model using Sensor System (센서 시스템을 이용한 수질 제어 모델)

  • Seo, Shin-Bae;Choi, Kyu-Hoon
    • Proceedings of the IEEK Conference
    • /
    • 2007.07a
    • /
    • pp.455-456
    • /
    • 2007
  • Nowaday it is main issues for us to protect from the polluted water which is flowing in streams and rivers simultaneously. This paper proposed a water maintenance control system using pH sensor. Also the work enables water analysis downloading VHDL coding to FPGA through Max+plus II simulation tool for display realization.

  • PDF

Improvement of the Railroad Signalling Equipment using GPS and Wireless Telecommunication (GPS 및 무선통신을 이용한 철도신호설비 기능향상)

  • Choi, Kyu-Hyoung;Choi, Dae-Seob
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.05a
    • /
    • pp.460-462
    • /
    • 2004
  • This paper gives a basic data of improving the performance of railroad signalling equipment by adopting GPS and wireless telecommunication technologies. These approach enable the moving block control of train, which can optimize train operation by reducing the distance between trains and maximize the railroad capacity. These method of detecting train position and controling train movement can also improve the train route control at stations.

  • PDF

Remote Monitoring Systems Using StrongARM (StrongARM을 이용한 원격 감시시스템)

  • 임홍식;남현도;강철구
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.259-264
    • /
    • 2003
  • In this paper, web based monitoring systems are implemented using embedded Linux. The external equipment is controlled via HTTP protocol and web browser program. HTTP protocol is ported into Linux. A micro web server program and external equipment control program are installed on-board memory using CGI to be accessed by web browser. Experimental result of the proposed web based monitoring systems can be used in automation systems and remote distributed control via internet using web browser.

  • PDF

A PI Control Algorithm with Zero Static Misadjustment for Tracking the Harmonic Current of Three-Level APFs

  • He, Yingjie;Liu, Jinjun;Wang, Zhaoan;Zou, Yunping
    • Journal of Power Electronics
    • /
    • v.14 no.1
    • /
    • pp.175-182
    • /
    • 2014
  • Tracking harmonic current quickly and precisely is one of the keys to designing active power filters (APF). In the past, the current state feedback decoupling PI control was an effective means for three-phase systems in the current control of constant voltage constant frequency inverters and high frequency PWM reversible rectifiers. This paper analyzes in detail the limitation of the conventional PI conditioner in the APF application field and presents a novel PI control method. Canceling the delay of one sampling period and the misadjustment for tracking the harmonic current is the key problem of this PI control. In this PI control, the predictive output current value is obtained by a state observer. The delay of one sampling period is remedied in this digital control system by the state observer. The predictive harmonic command current value is obtained by a repetitive predictor synchronously. The repetitive predictor can achieve better predictions of the harmonic current. By this means, the misadjustment of the conventional PI control for tracking the harmonic current is cancelled. The experiment results with a three-level NPC APF indicate that the steady-state accuracy and dynamic response of this method are satisfying when the proposed control scheme is implemented.

A Study on the wiring Control Method of Hand & Auto Operation of an easy Elevator (간이 승강기 수.자동 배선제어방식에 관한 연구)

  • Wee, Sung-Dong;Gu, Hal-Bon
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.596-602
    • /
    • 2002
  • An easy elevator for learning originated is opened to compare the existed learning equipment, and it had a high studying efficient that the sequence control circuit can opens and closes with the wire. The structure of equipment to be controlled from the first floor to the fifth floors is demonstrated a constructive apparatus by a lamp atc to express the function of the open-close of the door according to the cage moving with a mechanical actuation of the forward-reverse breaker and the motor of load and a mechanical actuation of hand-operation control components of push-button S/W and L/S and relay etc. These components let connects each other in order to control of the elevator function with the auto program and the designed sequence control circuit. Consequent1y the process of these functions of 1~5steps could operates the cage with an auto program of the elevator and the sequence control circuit. The sequence control circuit is controlled by the step of forward and reverse to follow as that the sensor function of the L/S1~L/S5 let posit with the control switchs of S/W1~S/W5 of PLC testing panel and switchs of S/W1~S/W5 installed on the transparent acryl plate of the frame. In here, improved apparatus is a hand-auto operation combined learning equipment to study the principle and a technique of the originated sequence control circuit and the auto program of PLC.

  • PDF

Duty Ratio Predictive Control Scheme for Digital Control of DC-DC Switching Converters

  • Sun, Pengju;Zhou, Luowei
    • Journal of Power Electronics
    • /
    • v.11 no.2
    • /
    • pp.156-162
    • /
    • 2011
  • The control loop time delay caused by sampling, the zero-order-holder effect and calculations is inevitable in the digital control of dc-dc switching converters. The time delay will limit the bandwidth of the control loop and therefore degrade the transient performance of digital systems. In this paper, the quantization time delay effects with different time delay values based on a generic second-order system are analyzed. The conclusion that the bandwidth of digital control is reduced by about 20% with a one cycle delay and by 50% with two cycles of delay in comparison with no time delay is obtained. To compensate the time delay and to increase the control loop bandwidth, a duty ratio predictive control scheme based on linear extrapolation is proposed. The compensation effect and a comparison of the load variation transient response characteristics with analogy control, conventional digital control and duty ratio predictive control with different time delay values are performed on a point-of-load Buck converter by simulations and experiments. It is shown that, using the proposed technique, the control loop bandwidth can be increased by 50% for a one cycle delay and 48.2% for two cycles of delay when compared to conventional digital control. Simulations and experimental results prove the validity of the conclusion of the quantization effects of the time delay and the proposed control scheme.

Infection control awareness and performance of dental Hygienist (치과위생사의 감염관리 인식과 수행)

  • Lee, Hyang-Nim
    • Journal of Korean society of Dental Hygiene
    • /
    • v.17 no.4
    • /
    • pp.621-630
    • /
    • 2017
  • Objectives: The purpose of this study is to investigate awareness and performance of infection control by dental hygienist. Methods: A self-reported questionnaire was answered by 239 dental hygienists working in dental clinics from September 7 to 18, 2016 in Gwangju city & Jeonnam region after explaining the purpose of the study and receiving the informed consent. The questionnaire consisted of sociodemographic characteristics and awareness and performance of infection control using Likert 4 point scale. Results: Average of Infection control awareness was $3.33{\pm}0.38$, average of infection control Performance was $3.04{\pm}0.37$ (p<0.05). The awareness and practice of dental equipment management showed the largest difference. The awareness of infection control by general characteristics varied according to position, number of dental units, number of employees, Infection control needs, Received infection control training experience, infection experience, infection control guideline (p<0.05). The relationship between infection control awareness and Infection control performance was r = 0.624 (p<0.001), indicating positive correlation. Conclusions: To improve awareness and performance of dental hygienist's infection control, regular received infection control training experience is needed. It is considered that the dentist's active cooperation is needed in shortening the life span of the dental equipment due to the Infection control performance and securing the quantity.

Equipment Qualification of Control Rod Control System for Nuclear Power Plants (원전용 제어봉 제어시스템의 기기검증)

  • Lee, J.M.;Kim, C.K.;Cheon, J.M.;Park, M.K.;Kweon, S.M.;Nam, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07d
    • /
    • pp.2603-2605
    • /
    • 2005
  • This paper describes an experience on the equipment qualification of CRCS(control rod control system) that has been developed for nuclear power plants. A very high level criteria should be satisfied for the equipment to be used for nuclear power plants. We have developed a CRCS that is aimed to be applied to commercial plants. This system adopts a duplex system structure that is based on the state-of-the-art digital technology so that it has higher reliability than the existing systems. The CRCS has been tested at a licensed testing organization and finally qualified. In this paper, the procedures and some trial-and-errors we have been through in the qualification process are explained. It is expected that our experience will be a helpful tips to the industry that are developing various systems for safety-critical plants.

  • PDF