Noise and vibration problems at the construction site, expansion of construction scale and frequency of urban construction is increased, has given the damage to local residents. Also, the result of civil complaint about noise and vibration that occurred in 2011 was 56,244; it is showing an increasing trend of more than 4% annually. In particular, the construction noise and vibration, the civil complaints of around construction site accounts for 64.6%(36,353), are harmful to the tranquility of living environment. As a result, the government has managed to strengthen the regulatory standard of construction noise (65dB(A), Day-time) from 2011. However, the regulatory standard of construction noise and vibration does not meet and also complaints related the construction noise and vibration not decreased. Because the management system can be applied to the construction site is insufficient and a shortage of manpower. In this study, investigated the status and problems of the regulatory standards related to construction noise and vibration, we propose an efficient management plan of construction noise and vibration.
Recently, the concern for the environmental noise has increased due to the growing of the living standard. The environmental noise regulations based on the equivalent noise level are widely used. However, the noise level, which Is based mainly on the magnitude with A-weighting, the important characteristics of noises in frequency and time domains and the impulsive nature cannot be assessed properly. These can have substantial effects on how human respond to noise. Therefore, the noise evaluation methodology based on the sound quality rather than the equivalent noise level can be more suitable to represent human response to the environmental noise. This paper describes the study on environmental noise quality analysis for various noises. A cluster analysis was carried out and the noises were classified into several clusters using the values of sound quality metrics. The classification was confirmed by comparing time and frequency characteristics of the noises. And then the result of Jury testing was analysis.
This study introduces an environmental noise evaluation procedure and results for a wind turbine (W/T) system. Test and evaluation are required by the international standard IEC 61400-11 in the aspect of environmental effect. Test and evaluation are performed on U-50 WT model which is first developed by the domestic W/T manufacturer. W/T test model is under operation in Daekwanryung wind test site. An integrated monitoring system in the test site is utilized for the evaluation. With the noise signal, meteorological data and W/T operational data are monitored in real time by the integrated monitoring system using LabVIEW. From the measured noise data, acoustic power level are estimated and compared with those of other similar size WT under the wind speeds required by international standard.
The objective of this study is to prepare the effective management plan of environmental noise with a noise map, and the guideline on the management plan of environmental noise was suggested through the review of existing application examples. The management plan of environmental noise with a noise map includes the practical contents in the stages of subdivision of management areas, establishment of reduction measures, opinion collection, post investigation, and reformulation of management plan. First, the classification of management regions is performed considering the excess degree of noise standard and the facility type in the phase of subdivision of management areas. Second, the optimal management plan is established through the investigation of regional characteristics and various noise reduction measures in the phase of establishment of reduction measures, which includes the examination of noise reduction effects with a noise map and the budget planning with the costing of noise reduction measures. Third, the opinion survey with a local resident and a expert is carried out in order to prove the validity of the management plan in the phase of opinion collection, and the management plan is modified with gathered opinions. Fourth, the post examination plan with noise measurement is performed in order to verify the real effect of noise reduction measures according to the management plan in the phase of post investigation. Finally, the amendment of the management plan as well as the improvement of a noise map is carried out at a regular cycle in the phase of reformulation of management plan.
This research is to determine the level of environmental pollution at a blasting construction area which is the origin of noise, vibration, and suspended particle, and to compare the results with other domestic and international standard data. This experiment is also to find out the effects resulting from blasting construction and to propose a plan that can decrease environmental pollution. The blasting construction area is a factory site which is about one and half million square meter and sewage disposal plant is about ninety thousand square meter. Both were selected as the areas for the tests to be conducted in determination test. The test to determine the level of noise, vibration, and total suspended particle was conducted thirty times around the blasting construction area by comparing measurement results and numerical analysis. However, as the test was not conducted in the laboratory but in the actual blasting construction area, it was not possible to do the test with the same exact conditions each true. Therefore, the test was not ideal as conditions could change from test to test. For the most part, the level of noise was below the standard level of 70dB. Every vibration test was under the standard limitation. For example, a house, 200m away was tested for noise and vibration and the level was found to be under the 0.2 cm/sec which is the standard for specialty designed cultural sites., i.e very low level. Also a buried oil pipeline that was 30m away also marked under 2.0cm/sec which is the norm for an industrial area. However, if there were an oil pipeline under the house, the amount of charging gunpowder per hole should be decreased compared to the amount used in the test. The test result for suspended particles under the standard limitation which is 24hour average 300$\mu\textrm{g}$/㎥ at a distance from blasting wavelength, but at detonator, total suspended particle from the blast origin exceeded the standard limitation. If explosion occurs when it detonates in the hole, most of the energy would be absorbed in the crushing of rocks, but some remaining energy would make noises and vibration inevitable. So the important thing is how to minimize the environmental pollution from the blasting. There should be regulations in order that the standard limitation is not exceeded, and to decrease the environmental pollution from the blasting.
The shipboard working environment of navy vessel is very inferior to the ground working environment. For this reason, the crew of a navy vessel suffer from an occupational disease such as lumbar pain, hearing loss, etc. Although standard for navy vessel's environmental vibration is applied, the criterion of the environmental vibration is too high. So it doesn't help to improve habitability of crew. In this study, for improving its habitability of crew, the current vibration level of navy vessel was examined and the standard of navy vessel's environmental vibration was investigated.
The shipboard working environment of navy vessel is very inferior to the ground working environment. For this reason, the crew of a navy vessel suffer from an occupational disease such as lumbar pain, hearing loss, etc. Although standard for navy vessel's environmental vibration is applied, the criterion of the environmental vibration is too high. So it doesn't help to improve habitability of crew. In this study, for improving its habitability of crew, the current vibration level of navy vessel was examined and the standard of navy vessel's environmental vibration was investigated.
발파소음을 계측하여 예측방법의 타당성을 검토하였고, 환경규제 기준으로의 변환방식을 규명하였다. 환산거리에 따른 발파소음의 예측은 환산거리와 음압레벨의 상관성이 더 좋았으나, 상관계수가 낮아서 환산거리 설계 의한 발파소음의 조절은 어려움이 있었다. 발파시 동시에 측정된 음압레벨과 소음레벨의 상관식에 의한 변환과, 음압레벨의 우세주파수에 해당하는 청감보정회로의 보정치만큼 간이 보정하여 변환하는 방법과, 퓨리에 변환을 하여 청감보정한 후 소음레벨을 구하는 방법을 시도하였다. 세 가지 방법 모두 변환하는 데에는 많은 오차가 발생하였으나 우세주파수, FFT를 이용한 변환보다는 발파시 동시에 측정된 음압레벨과 소음레벨의 상관식에 의한 변환 방법이 가장 실용적인 방법이었다.
The energy efficiency and environment-friendly aspect of the railway system would be superior to other on-land transportation systems. In a preliminary feasibility study stage, the energy efficiency and problems related with environment are usually not considered. The railway noise and vibration which could be reasons of environmental problems are focused and studied in this paper. The investment for railway systems could be encouraged by the considering of main environmental elements evaluated with the modified noise and vibration standard for environment-friendly railway construction.
The standards of acceptable limit and compensation is one of the most important things in environmental noise and vibration disputes resolution. In this paper, review on the present acceptable limit level and compensation standard in National Environmental Dispute Resolution Commission is introduced. Discordance of standards between in the regulation law and in the dispute resolution commission and it's improvement are discussed. Abnormal reasoning for compensation standards is pointed out from a author's private view.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.